Commission for Regulation of Utilities (CRU)
FOI Requests — 328 records (page 6 of 7)
Download
- Received 26 May 2026Decided —WithdrawnCommission for Regulation of Utilities (CRU)
I am requesting access to statistical records held by the Commission for Regulation of Utilities relating to supplier-level customer complaints. If the CRU can release this as open data or routine statistical information outside the FOI process, I would be grateful for that route. Otherwise, please treat this as a request under the Freedom of Information Act 2014. Records Requested. For each reporting period available from 1 January 2024 to the most recent available date, please provide a machine-readable table showing, by supplier / provider: 1. Supplier / provider name. 2. Number of complaints received by CRU Customer Care. 3. Energy type or service type, including electricity, gas, LPG, water, network, prepay, or other where recorded. 4. Complaint category / issue type, including where available: - billing; - meter readings; - switching; - prepay / top-up; - refunds / credit balances; - sales / sign-up; - contract or tari; - disconnection; - customer service / complaint handling. 5. Outcome or status category in aggregate, where available. 6. Reporting period, ideally by calendar year and, if available, quarter. If a full supplier-level table is not available, please provide the deepest supplier/category aggregate table available. Scope Notes. I am not seeking personal data, individual complaint files, customer identities, addresses, account numbers, sta notes, or case narratives. Aggregated statistical tables are preferred.
- Received 9 September 2026Decided —OngoingCommission for Regulation of Utilities (CRU)
Under the FOI Act 2014, I am seeking the following: 1) any written correspondence between CRU and the relevant government departments in relation to the recently published Proposed Direction on Interruptible Gas Connections; 2)any meetings between CRU sta and government ministers or oicials in relation to the proposal; 3) any written correspondence or meeting minutes with industry representatives in relation to the proposal
- Received 20 April 2026Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting under the Freedom of Information Act 2014 for access to records held by the CRU relating to the receipt, processing, and outcome of requests made under the Access to Information on the Environment (AIE) regime. I request the following records for the period 2024 - 2025. 1) Any register, log, spreadsheet, database extract, or equivalent record (however held) listing AIE requests received by the organisation, including where such records are maintained for internal tracking or reporting purposes. 2) For each AIE request recorded in such systems, the following information (where held): AIE reference number or internal tracking number; Date the request was received; Brief description or subject matter of the request; Decision/outcome (e.g. granted, part- granted, refused, transferred, withdrawn); Date of decision or closure. 3) Any reports, summaries, dashboards, or management information generated from AIE request tracking systems for internal or external reporting purposes. 4) Where no consolidated list exists, I request the underlying data fields extracted from whatever electronic system is used to record AIE requests, in the most readily retrievable format (e.g. CSV export, Excel extract, or database report).
- Received 9 November 2021Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting any briefings, emails, notes and/or records relating to the electricity grid dropping below the normal operating range of 49.8 Hz at 8pm on Tuesday 4th May for 14 minutes.
- Received 13 June 2022Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting a copy any applications for discounts of tariffs at entry points for LNG facilities (as mentioned on page 16 of the recent CRU Paper: Gas Transmission Tariff Methodology –Tariff Network Code Article 28 Decision Gas year 2022/23) that have been received by CRU in the past three years.
- Received 7 October 2019Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting in electronic format the files, memos, notes, and internal and external emails from 2018 on for a proposed CHP plant. This request specifically includes any communications with the DCCAE
- Received 1 November 2022Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting a database/spreadsheet/record of all complaints received by CRU in the most recent twelve-month period. This record can be anonymised to remove names/addresses while leaving information relating to the nature of the complaint, its date, its status etc.
- Received 12 May 2023Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Seeking details on allowed revenue from electricity system operators for 2021 and 2022 as referred to in EirGrid’s Statement of Charges: “The Transmission Use of System charges published in this statement have been derived in accordance with the 2021 revenue (CRU/20/095) and the 2022 revenue (CRU/21/078) allowed by the CRU.” Requesting access to documents CRU/20/095 and CRU/21/078.
- Received 10 February 2025Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Under the FOI Act 2014, I am requesting access to information held by the CRU regarding algorithmic trading in electricity markets, ownership of key generation and storage assets, and market investigations related to trading algorithms. For clarity, I have broken my request into the following three areas. 1 - ALGORITHMIC TRADING UPTAKE BY ENERGY MARKET PARTICIPANTS: I am requesting access to the data gathered under the new REMIT II reporting requirements on algorithmic trading, collected via the CEREMP tool or any other monitoring tool employed by CRU. I would ask that you provide this information in one of three following manners, based both on ease of access and any legal restrictions which may apply to releasing such information. a) Maximum: A list of which market participants have registered as partaking in algorithmic trading, and which have not. b) Median: Anonymised data on how many market participants have registered as partaking in algorithmic trading and how many have not, broken down by their average volume of trading activity AND/OR their market function (i.e. Generation Company, Power Trader, Retailer). c) Minimum: Anonymised data on how many market participants have registered as partaking in algorithmic trading, and how many have not
- Received 29 May 2023Decided —Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: 1. A copy of all licenses "to supply electricity or natural gas to customers", granted by the Commission for Regulation of Utilities, for the Electricity and Gas Suppliers whom are listed here: https://www.cru.ie/consumerinfo rmation/switch-supplier/energy- suppliers-in-ireland/ 2. A copy of the 2009 correspondence from the then Department for Communications, Energy and Natural Resources that sought network tariffs to be rebalanced in favour of Large Energy Users. 3. A copy of any communication that was sent to and received from energy suppliers about the CRU’s PR3 Decision for the DSO (CER/10/198), where network tariffs were rebalanced in favour of Large Energy Users.
- Received 18 November 2022Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting records of length of time the wind turbines in Galway Wind Park in Connemara were required to switch off and cease generating electricity because of a surplus in the national grid, as well as records of any compensation paid by the state as a result of the requirement to switch off the wind turbines dating from January 2022 to the present.
- Received 23 July 2026Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting: A list of outside parties that have provided presentations or briefs to the CRU since July 1, 2025.
- Received 29 November 2022Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting: 1) Number of MFDs (Multi- functional devices) & photocopiers at CRU; 2) Name of incumbent; 3) Start/end date of contract (if expired, when does the CRU expect to revisit the marketplace); 4) Details of any extension options; 5) What framework / Route to market used; 6) Does the CRU share this contract/use the same arrangement with another organisation. If yes, please name who; 7)Number of regular/desktop printers (in addition to above); 8) Is there a support contract on above, if yes please state start/end date; 9) Does the CRU have a Print Room; 10) If yes, name of supplier, number of devices and start/end date of contract, also details of any extension options; 11) Total annual print/copy volumes including, if applicable CRU’s Print Room, for (a) mono (b) colour; 12) What Print software does the CRU run; 13) The CRU’s total annual spend on print; 14) Name of person responsible for the running of MFDs and, if applicable, your Print Room.
- Received 13 September 2022Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting: How many household customers per year change their electricity supplier, gas supplier for 2017,2018,2019,2020,2021?
- Received 19 May 2026Decided —WithdrawnCommission for Regulation of Utilities (CRU)
I would like to request some records under the FoI Act please. I am seeking, for the period 1 January 2025 to 1 May 2026, a schedule (in spreadsheet form) of emails: sent or received by any sta of the CRU from Commissioner and Director level down. Where at least one sender or recipient email address has a domain associated with BnM / Bord na Móna - eg. @bnm.ie The schedule should contain, for each email: date and time, sender email address, recipient email address(es), subject line, indication of whether there were attachments (yes/no). I am not at this stage seeking the body text or attachments of the emails, only this schedule please.
- Received 2 February 2023Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting copies of all correspondence between the CRU and ESB Networks with regard to the decision to refund energy customers €50 due to historic overcharging. This request to cover the period 1 July 2022 to date of receipt.
- Received 11 July 2024Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting All correspondence from Halston Planning and Environmental Ltd (acting on behalf of Lumcloon Energy, or COOLPOWRA FLEX GEN LIMITED) to the CRU between 01/01/2024 and 10/7/2024 to fulfill An Bord Pleanala requirements associated with the proposed development of a reserve gas-fired generator, energy storage system facility and GIS substation in the townlands of Coolpowra, Cooldorragha, Coolnageeragh Ballynaheskeragh, Gortlusky, and Sheeaunrush, Co. Galway
- Received 9 October 2025Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Any risk assessments, audits, or safety evaluations (internal or external) prepared for or received by the CRU relating to fire, explosion, or chemical hazards associated with BESS. Any records, reports, or correspondence concerning insurance or liability requirements for BESS operators or developers, including public- liability, environmental-liability, or business-interruption coverage, and any verification or acceptance of such insurance by the CRU. Any incident reports, notifications, or correspondence regarding accidents, fires, or emergency responses at any BESS site in Ireland.
- Received 9 July 2019Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting CRU’s annual expenditures (i.e. fixed costs and expenses) for a 5-year period from 2013 to 2018
- Received 7 December 2020Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting copies of permitted activities of RECI/Safe Electric Inspectors & complaints procedures in relation to RECI/Safe Electric Inspectors.
- Received 24 October 2022Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting the following records: A copy of the Investigation Report on ESB submission of incorrect Commercial Offer Data to the market as mentioned in Commission Meeting 941.
- Received 15 December 2021Decided —WithdrawnCommission for Regulation of Utilities (CRU)
1) Requesting to release the prioritisation list of projects to be processed under ECP2.1. Requesting a list of the projects which qualified under the following categories: Battery Projects, Top 25 Renewable Projects as set out under the ECP2 ruleset, Projects by date order of planning, NGPA, Community projects
- Received 21 August 2023Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting answers to the following questions: 1) If you use an IT Service Management solution (aka ITSM), please advise what you are currently using? (Examples include: ServiceNow, BMC, Freshworks, 4ME, Hornbill, ManageEngine, Ivanti etc) Please provide the platform name. 2) If possible, please also provide the previously utilised solution and reason for change. 3) When is your current ITSM platform contract due for renewal? Please provide month/year. 4 ) Who (if there is one) is your current supplier of professional and managed services for your ITSM platform? 5) If this is managed internally, please confirm the same. 6) How many user licences do you have for your ITSM platform? 7) Who is the principal
- Received 23 January 2025Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting: 1) The total number of requests for the Electrical Recognition Process for International Qualifications received by CRU in the last 5 years (from 2019 to 2024). 2) The number of these requests that have been rejected within the same period level was lower that NFQ level 7.
- Received 2 November 2021Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting copies of all records held referring or relating to whether CRU should continue to pay bonuses or performance-related pay to staff during 2020 as a result of the Covid- 19 pandemic.
- Received 19 May 2026Decided —WithdrawnCommission for Regulation of Utilities (CRU)
I would like to request some records under the FoI Act please. I am seeking, for the period 1 March 2024 to 1 March 2025, a schedule (in spreadsheet form) of emails: sent or received by any sta of the CRU from Commissioner and Director level down. Where at least one sender or recipient email address has a domain associated with the government’s climate / energy department at the time - eg. DCENR, DCEE or equivalent. The schedule should contain, for each email: date and time, sender email address, recipient email address(es), subject line, indication of whether there were attachments (yes/no). I am not at this stage seeking the body text or attachments of the emails, only this schedule please.
- Received 14 October 2024Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting access to the following records which are non-personal and which I believe are held by the CRU: A record of documents provided to/reviewed by HR Wallingford and its partners PJM Economics, instructed by the CRU, in preparation of a report on Uisce Éireann’s preliminary business case for the Water Supply Project (WSP - a proposal to pipe water from the River Shannon to Dublin). These include: 2) Uisce Éireann RWRP study, Area 9 – Greater Dublin Area, combination 1 supplementary report, dated May 2023; 2) Uisce Éireann responses to CRU email on sensitivity analysis, dated between May 4, 2023 and May 18, 2023; 3) Dublin Region Demand Report; 4) A technical annex provided, titled “16_085_SPEC_Section3ERDB_ v2.04.pdf”; 5) Uisce Éireann WSP – Eastern and Midlands Region, preliminary business case addendum (sensitivity analysis), June 2023; 6) Uisce Éireann WSP PBC affordability response, August 2023; 7) Uisce Éireann WSP contingency plan response, August 2023; 8) A document titled: “RFI-6 GDA Aquator Modelling Report-270623.pdf”; 9) A document titled: “RFI 24 Additional Information Steel Power Chemical”; 10) A document titled: “RFI 30 – ES Costing Guide Final”; 11) A document titled: “RFI 30 – NWRP Costing Explanatory Notes”; 12) A document titled: “RFI 30 – EBSD Lite 3.0 Instructions_Rev1”;
- Received 30 April 2026Decided —WithdrawnCommission for Regulation of Utilities (CRU)
I wish to apply under the Freedom of Information Act 2014 for the following data held by your organisation: Any written material including instruction manuals, technical documents, emails, memos and internal and external communications mentioning the software “Passworks”.
- Received 22 November 2021Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting: 1) Records from specified third parties notifying the CRU of the electricity grid dropping below the normal operating range (below 49.8Hz) at 8pm on Tuesday 4th May for 14 minutes. 2) Records in relation to a notification that the electricity grid dropping below the normal operating range (49.8Hz) at 8pm on Tuesday 4th May for 14 minutes.
- Received 21 August 2023Decided —WithdrawnCommission for Regulation of Utilities (CRU)
contact for IT Services within your organisation? i.e. Director of IT or Head of Service Delivery. Please provide LinkedIn or available contact details (where appropriate).
- Received 26 August 2026Decided —OngoingCommission for Regulation of Utilities (CRU)
Under the Freedom of Information Act 2014, I am seeking records held by CRU for the period 1 January 2026 to the present date concerning the impact of delays to the Celtic Interconnector on electricity security of supply. Please provide: 1) All correspondence between CRU and EirGrid concerning the treatment of the 700MW Celtic Interconnector in the 2026–2035 Resource Adequacy Assessment; 2) All records concerning whether the security-of- supply assessment has been rerun, updated or stress-tested using a later Celtic Interconnector commissioning or energisation date; 3) Any modelling, analysis, briefing notes or internal assessments concerning the eect on winter 2028/29 and winter 2029/30 if Celtic is not commercially available during 2028; 4) All records concerning any resulting need to retain or extend Temporary Emergency Generation, Moneypoint or other existing generation because of delays to Celtic; 5) Any estimates of the additional cost to electricity consumers arising from retaining such generation for longer; 6) All records concerning the assumption of approximately 1.4GW of oshore wind capacity by 2030 in electricity adequacy modelling, including any assessment of the consequences if that capacity is delayed;
- Received 18 January 2021Decided —WithdrawnCommission for Regulation of Utilities (CRU)
All records (company name, contract value amount and description of expenditure type) of purchase orders in excess of €20,000 made in Q1, Q2, Q3 and Q4 of 2019 and Q1, 2 and 3 of 2020.
- Received 7 July 2025Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting the release of the following records: 1) All calculations submitted by Gas Networks Ireland over the last 15 years to the CRU which set out the level of investment being applied to the Gas Networks Ireland telecom assets, or other assets used by the Aurora Telecom franchise of Gas Networks Ireland as part of the Gas Networks Ireland Regulatory Asset Base; and 2) All correspondence challenging or accepting the above calculations as presented.
- Received 14 March 2019Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting access to any records dating from 1 January 2016 to 30 June 2017, held by the CRU, which relate to the application by Ireland to the European Commission for State aid approval of draft legislation to establish the Capacity Remuneration Mechanism, including, but not limited to, any documents relating or referring to the targeted contracting mechanism or the use of local reserve supply agreements, agendas and minutes from any meetings but excluding the decision itself and any records that are already in the public domain along with meeting requests and diary entries.
- Received 20 June 2022Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting 1) In relation to all CCTV cameras that you have procured from 2017 until the present, please provide: the names of each company and the names of the products including the model numbers; the contracts with each company; the cost per unit and the total costs, and the duration of contracts and/or licenses. 2)Please provide records that state the capability of the CCTV cameras (along with their storage and scanning, behaviour analysis, object detection or demographic detection (i.e. age, gender, clothing etc). 3)For all CCTV cameras procured between 2019 and present, please also provide the documents and communication (such as letters and emails) involving the company that was awarded the contract. If the records in response to point 1 in this request contain product model/numbers, then point 2 can be removed.
- Received 10 February 2025Decided —WithdrawnCommission for Regulation of Utilities (CRU)
a) Data on the frequency of suspicious transaction reports or other market surveillance alerts received by the CRU from the Republic of Ireland’s market operators, related to algorithmic trading. This should be broken up into days, months, or years, depending on what is most easily accessible to your team, and should cover the past three years. b) Data on the number of past and ongoing CRU investigations involving energy market participants’ use of trading algorithms. c) Any insights you are willing to give on CRU’s methodology for investigating energy market abuse, and whether your toolset makes use of machine- learning or automation.
- Received 14 February 2024Decided —TransferredCommission for Regulation of Utilities (CRU)
Requesting a list of RESS-2 and RESS-3 projects that have executed their contracts.
- Received 9 October 2025Decided —WithdrawnCommission for Regulation of Utilities (CRU)
FOI Request – Safety, Fire Risk, and Insurance Oversight of Battery Energy Storage Systems (BESS). Under the FOI Act 2014, I request access to any records held by the CRU relating to the safety regulation, fire-risk management, and insurance oversight of Battery Energy Storage Systems (BESS) in Ireland, including but not limited to: Poolbeg BESS, Dublin; Aghada BESS, Cork; Kylemore BESS, Dublin; South Wall BESS, Dublin. This request also includes any equivalent records concerning proposed, planned, or pre- commissioned BESS installations anywhere in Ireland that are known to, regulated by, or under review by the CRU. Specifically, I request: Any correspondence, reports, internal notes, or reviews concerning the safety certification, inspection, or regulatory acceptance of any operational, planned, or proposed BESS in Ireland. Any records, reports, or communications concerning fire safety, explosion risk, or thermal- runaway prevention, including emergency response measures or coordination with local fire services.
- Received 20 December 2017Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting the following information: 1. The amount that Commission for Regulations Utilities spent on hotel accommodation and flights for staff travelling abroad for work related business in the years 2014, 2015, 2016 and to- date in 2017 in tabular form 2. During the years 2014, 2015, 2016 and to-date in 2017 did any staff member from CRU travelling abroad for work related business ever request that their class of flights be upgraded e.g. Business Class etc.; if so who requested the upgrade; the reason why they requested the upgrade; & if the upgrade request was approved or refused.
- Received 10 November 2022Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting copies of 1) any communication between 1.1.2021 to 10.11.22 relating or referring to the STEP Project, SLNG, NFE or LNG developments in general (but excluding any communications solely referring to other LNG projects) between the CRU and the following bodies: The DECC including Dept. officials, the Dept. Minister and advisors to the Minister; GNI; Eirgrid; any other regulatory body or state agency; any non-govt organisation; any other dept. of Govt including any subsidiary units, committees, working groups or agencies. This includes emails, letters, notes and minutes of meetings. 2) Any documents, created between 1.1.21 to 10.11.22, held by or on behalf of the CRU relating or referring to the STEP Project, SLNG, NFE or LNG developments in general (but excluding any documents specifically created for other LNG projects) which do not already fall within 1 above.
- Received 2 September 2026Decided —OngoingCommission for Regulation of Utilities (CRU)
Could you please provide a year-by-year breakdown of all fines or financial penalties imposed on Uisce Éireann by the Commission for Regulation of Utilities (CRU), covering the period from Uisce Éireann’s establishment to the present? For each fine or penalty, please include: the year and date it was imposed; the amount; the reason for the fine or penalty; the date and method by which it was paid or otherwise accounted for; whether the CRU deducted the amount from, or otherwise reduced, funding or revenue allowances available to Uisce Éireann; and if so, which capital, operational or other funding programmes were aected, including the value of any resulting reduction or deferral in expenditure. Could you also provide a year- by-year breakdown of all bonuses, performance-related payments or similar additional remuneration paid to Uisce Éireann sta over the same period? For each year, please provide the total amount paid, the number of sta who received such payments, and the criteria, targets or performance measures on which the payments were based. Where information is not available for any year, please indicate this explicitly and explain why.
- Received 6 July 2026Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Under the Freedom of Information (FOI) Act 2014, I am seeking all records showing how many sta are attending the oice versus working from home.
- Received 26 May 2023Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting information relating to how ESB Networks derives its revenues. Transmission Use of System Charges (TUoS) are paid demand customers, generators, and distribution system customers, but does ESB Networks only derive its revenue from TUoS charges levied on these activities located in the Republic of Ireland? In other words: is the transmission network in the Republic of Ireland funded entirely by bill payers in the Republic of Ireland? Or do bill payers in Northern Ireland fund any portion of the costs of the transmission network in the Republic of Ireland?
- Received 15 August 2025Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting copies of any and all records held by you - including reports, plans, projections, correspondence, internal memoranda, maps, and capacity studies - relating to: 1) The number of 220kV substations planned or projected to be built in the Southwest region over the next 40 years. 2) The number of 110kV substations planned or projected for the Southwest region over the next 40 years. 3) The number of 38/40kV substations planned or projected for the Southwest region over the next 40 years. 4) The rationale for proposing a 220kV substation at Ballysallagh given its proximity to Knockraha substation, including any capacity assessments, cost- benefit analysis, or operational need studies. 5) How Ballysallagh 220kV substation would integrate with the national grid, including assessments of forecast demand, industrial development, or strategic network planning. 6) Planned or projected overhead lines or underground services from Ballysallagh 220kV station over the next 40 years.
- Received 15 January 2019Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Seeking copies of all documentation and correspondence on a licencing application by an Irish windfarm
- Received 4 September 2026Decided —OngoingCommission for Regulation of Utilities (CRU)
I wish to make a request under the Freedom of Information Act 2014. I am seeking access to records relating to Condition 33 of the Transmission System Operator Licence granted to EirGrid, specifically the annual technical and safety transmission system audit(s) required under that condition. In particular, I am requesting: 1) Copies of the annual technical and safety transmission system audit reports submitted by or on behalf of EirGrid to the CRU pursuant to Condition 33, for the most recent available 3 year(s); and 2) Any correspondence, decisions, or records held by the CRU confirming whether these audit reports are published or otherwise made publicly available and, if so, where they can be accessed.
- Received 9 February 2026Decided —WithdrawnCommission for Regulation of Utilities (CRU)
I am requesting the following: 1) Records indicating whether the CRU maintains a database, list, or archive of all historic energy plans (electricity and gas) oered by energy providers in the Irish retail market. 2) If such a database or record exists, I request a copy of the data containing the details of these historic plans, including but not limited to: Provider name, Plan name, Unit rates and standing charges, Eective dates (start and end dates of the plan availability), and, Any associated terms or discount structures. 3) I am interested in records covering the period from 2020 to the present date. I would prefer to receive this information in an electronic format (such as an Excel or CSV file) if possible. Before making this request, I searched the CRU website and reviewed the 'Energy Monitoring Reports' and 'Retail Energy Market' publications. While these provide high-level summaries and price trends, they do not contain the granular, historic database of specific provider plans/taris I am seeking. Therefore, I am proceeding with this formal FOI request for the underlying records.
- Received 24 November 2025Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting copies of the following audits/reviews: Licensing and Levy Management (2024)
- Received 27 July 2026Decided —WithdrawnCommission for Regulation of Utilities (CRU)
I am writing to you under The Freedom of Information Act 2014 (the Act) to request access to information in relation to two points: 1.a licence obtained or in progress by Neoen Renewables Ireland Limited for their "Glenlara Power Reserve" project in Curradu, Newmarket, Co. Cork; 2. an update in relation to the regulation of battery energy storage systems.
- Received 25 January 2024Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Request copy of a note written by a CRU Commissioner that “provided options to the department on different ways that the CRU can look at network tariffs in the context of the crisis that we are in at the time”.