Commission for Regulation of Utilities (CRU)
FOI Requests — 328 records
Download
Use this data
In a spreadsheet
Paste into Google Sheets. 217 KB, within the size we keep spreadsheet files to.
=IMPORTDATA("https://publicinformation.ie/api/data/foi/bodies/commission-for-regulation-of-utilities-cru.csv") Explore FOI Requests
For: Anyone. Paste it into the AI assistant of your choice.
Show the prompt
You are helping me explore the "FOI Requests" open dataset from publicinformation.ie. 1. Read https://publicinformation.ie/llms.txt, then the dataset page at https://publicinformation.ie/data/foi/. 2. Fetch the JSON Schema at https://publicinformation.ie/data/reference/schemas/foi-disclosures.schema.json and the documentation at https://publicinformation.ie/data/reference/datasets/foi-disclosures/. 3. Download the records from https://publicinformation.ie/api/data/foi.csv (or https://publicinformation.ie/api/data/foi.json). Print the header and the first 5 rows. 4. Summarise what the dataset contains, which fields identify a public body, and 3 questions it can answer. 5. Answer the question I ask next using only these files. Rules: - Read https://publicinformation.ie/llms.txt first. - Fetch the schema or column dictionary before writing code, and print the CSV header and the first 5 rows before any analysis. Never assume a column exists. - Cite every claim by URL: a record as https://publicinformation.ie/foi/<request_id>/, a figure as its row in the derived table. - Report the denominator, `suppressed_reason` and `flags` next to every rate. Ignore rows where `suppressed_reason` is set. - State the data's `as_of` date. - Use a pinned release (https://releases.publicinformation.ie/foi-disclosures/) for anything that will be published. - Do not invent columns, bodies or numbers. If something cannot be determined from the files, say so.
Recipes using this data
- Are journalists refused more often than other requesters?
- Chart one body's FOI requests over time
- Look up a public body's FOI figures in JavaScript
Reference
Note: Not all FOI requests have a specified time period, and therefore not all requests appear in this chart.
- Received 20 August 2026Decided 18 September 2026Part-GrantedCommission for Regulation of Utilities (CRU)
I request the following information: the selection processes for the Dispute Resolution Board and Panel acting within the context of the Trading and Settlement Code; the training processes for the participants on the Dispute Resolution Board and panel acting within the context of the Capacity Market Code; the selection processes for the Capacity Market Dispute Resolution Board and Panel acting within the context of the Capacity Market Code; the training processes for the participants on the Dispute Resolution Board and panel acting within the context of the Capacity Market Code; training materials made available to participants on either the CMDRB or DRB acting within the context of the CMC or TSC respectively.
- Received 14 August 2026Decided 16 September 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Under the Freedom of Information Act 2014, I request the following records: 3) A copy of any minutes from periodic liaison meetings with parent or supervisory departments since 1 March 2026; 4) The most recent periodic update review, report, or briefing in 2026 to date on matters of strategic
- Received 14 August 2026Decided 16 September 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Under the Freedom of Information Act 2014, I request the following records: 1) A copy of any completed audits carried out by your audit team [or commissioned to be carried out by an external auditor] since 1 March 2026; 2) A copy of the minutes of any audit and risk committee [or if separate both the Audit and Risk committees] meetings since 1 March 2026;
- Received 14 August 2026Decided 16 September 2026Part-GrantedCommission for Regulation of Utilities (CRU)
or operational significance requested by or sent to senior management, the board, the chair, or overseeing body (where there is departmental or ministerial oversight or oversight from another State body). For the purposes of processing Part 4 above, please interpret such periodic update review, report, or briefing as referring to those which involve a formal examination or evaluation of a matter(s) and which contain substantive findings, conclusions and/or recommendations. On that basis, the scope would exclude routine governance correspondence.
- Received 7 August 2026Decided 14 September 2026Part-GrantedCommission for Regulation of Utilities (CRU)
I would like to make a request for information under the freedom of information Act 2014. My request relates to the Electricity Transmission Network Allowed Revenues for 2027 And Demand Transmission Use of System (D-TUoS) Taris 2026/27 published recently. I would like to request records related to section 3 - DTUoS Customer Impact Analysis. This could include - correspondence in relation to it, both internal and external, as well as earlier drafts, any track-changes, or meeting notes of where it was discussed. Within that overall request, I am particularly interested to see records related to this line from the section: "As can be seen from Table 8, transmission network charges are expected to decrease for the archetypical customers from 2025/26 to 2026/27, following the CRU decision on the 2027 annual revenues and 2026/27 taris. Transmission tari year revenues are increasing from €1,395.64m in 2025/26 to €1,472.86m in 2026/27. However, forecast demand is increasing by 7.51% from 34,600GWh in 2025/26 to 37,200GWh in 2026/27, which is a key driver of the year-on-year reduction."
- Received 24 July 2026Decided 10 September 2026RefusedCommission for Regulation of Utilities (CRU)
Under the freedom of information act 2014, can you please forward me details of subsidies paid to the Irish onshore wind farm sector for the years 2021, 2022, 2023, 2024 and 2025.”
- Received 27 July 2026Decided 25 August 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: the release of any and all correspondence and documentation created by the CRU, on the matter of opening and closing meter readings being made available to customers by supply companies, on and after the date of my original request to the CRU to mandate companies to provide such detail in their billing account systems.
- Received 21 July 2026Decided 17 August 2026Part-GrantedCommission for Regulation of Utilities (CRU)
and communication performance from 2019 up to and including April 2026.
- Received 21 July 2026Decided 17 August 2026Part-GrantedCommission for Regulation of Utilities (CRU)
I am writing regarding the Memorandum of Understanding between An Fóram Uisce (AFU) and Tipperary County Council, which outlines AFU’s role in advising the Commission for Regulation of Utilities (CRU) on Uisce Éireann’s performance. As stipulated, AFU is expected to provide such advice, either proactively or when formally requested by the CRU. I kindly request copies of all correspondence, recommendations, and observations exchanged between AFU and the CRU related to leakage, wastewater plant performance,
- Received 30 July 2026Decided 14 August 2026RefusedCommission for Regulation of Utilities (CRU)
I require the following records under the Freedom of Information Act 2014; 1) Records of any investigation carried out by CRU, or by delegated or referred responsibility, as concerns evidence of public impact research carried out before the roll-out of Data-centres, as regards short-term and long-term, energy demand, water demand, financial impact on the public, and environmental impact; 2) Records of, evidence of a public notice having been published to forewarn the Irish people about the aforementioned impacts, and to aord that opportunity for people to lawfully object to the building of Data- centres; Notice, that this is 'NOT' a request for any 'personal /private data', and request for public records 'only'; Take note, in consideration of the "national interest" to be above FOI act 2014, Section 33, "Security, defence and international relations", and also same "national interest" considered to be above FOI act 2014, section 36, "Commercially sensitive information"; Take notice that any claims that the records that I am seeking are too "voluminous" can be and may be interpreted as an admission of failure by your department to publish records into the public domain; Any re- quote of the text of my FOI in italics will be interpreted as being translated, to be identified as a foreign language for the purposes of prejudice, and will become immediately an internal review matter.
- Received 14 May 2026Decided 14 July 2026Part-GrantedCommission for Regulation of Utilities (CRU)
I wish to apply under the Freedom of Information Act 2014 for copies of all documents/files, whether held in hard copy, electronically or any other format, held by you, relating to the on-site power plant/microgrid system to be developed by Pure Data Centres Group and AVK in Dublin.
- Received 16 June 2026Decided 13 July 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Under the Freedom of Information Act 2014, I am seeking the following: 1) An update on the costs associated with the Celtic Interconnector as of June 2026; 2) The reason why the project has been delayed until 2028; 3) All emails and correspondence between Eirgrid and the CRU relation to the updated costs; 4) All emails and corresepondence between Réseau de Transport d'Électricité and the CRU in relation to the costs and complications of the project; 5) All emails between CRU and the department of energy in relation to delays to the project and the new costs.
- Received 8 June 2026Decided 13 July 2026Part-GrantedCommission for Regulation of Utilities (CRU)
I would like to request records under the freedom of information act 2014. I would like copies of correspondence between GNI and CRU in relation to the matter of data centres and network tari issues. I would like to see records including of when these issues were first raised, any briefing notes prepared for CRU to explain the issue, and any proposed solutions from GNI.
- Received 27 May 2026Decided 25 June 2026GrantedCommission for Regulation of Utilities (CRU)
Oireachtas committee hearings; - A list of the positions of sta who received the support or training.
- Received 27 May 2026Decided 25 June 2026GrantedCommission for Regulation of Utilities (CRU)
Under the Freedom of Information Act 2014, I request copies of the following records to cover the period 1 January 2025 - present; - A full breakdown of spending on external public relations advice, support, or training received by oicials in advance of any appearances by oicials before any
- Received 22 May 2026Decided 22 June 2026Part-GrantedCommission for Regulation of Utilities (CRU)
I would like to apply under the provisions of the Freedom of Information Act for the following records held by the CRU: Copy of correspondence between the CRU (at commissioner level) at the Minister for Climate, Energy and Environment/Secretary General of the Department of Climate, Energy and Environment since 01 January 2026.
- Received 1 May 2026Decided 28 May 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Under the Freedom of Information Act 2014, I am requesting access to all records held by the CRU and Safe Electric (as the Safety Supervisory Body) relating to Weston Mechanical and Electrical Services Limited (Company No: 583381) for the period from 1st January 2025 to 1st May 2026. Specifically, I am seeking: - Copies of all inspection and audit reports completed by Safe Electric inspectors for this contractor. - Records of any non-conformance notices or safety notices issued to the firm. - Details of any formal complaints or disciplinary proceedings recorded by Safe Electric regarding their work. - Copies of any correspondence between the CRU/Safe Electric and Weston Mechanical and Electrical regarding regulatory compliance or safety standards. I would prefer to receive these records in electronic format via email. If any part of this request is refused, please specify which exemption under the Act is being applied and provide details on the appeals process.
- Received 30 March 2026Decided 22 May 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting the following records: 1) Any audits signed o on by the board or audit committee since 1 January 2026-present; 2) A copy of any briefings, investigations, assessments, analysis or reports [excluding audits] requested by or commissioned by the Secretary General / Chief Executive or the Board or Minister(s) which were finalised/completed since 1 February 2026 (and have not been publicly released).
- Received 15 April 2026Decided 14 May 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting the following under the Freedom of Information Act 2014: All expense submissions and copies of receipts for expenses lodged by the chairperson from April 1, 2024, to April 1, 2026.
- Received 13 April 2026Decided 6 May 2026RefusedCommission for Regulation of Utilities (CRU)
Requesting under the FOI Act 2014 for access to records held by the CRU relating to generator connections for biomass and bioenergy projects. I request the following: 1. Any records, reports, or data held by the CRU showing the status of generator connection oers issued to biomass, biogas, anaerobic digestion, or bioenergy projects through the Gate process (Gates 1-3) or subsequent Enduring Connection Policy (ECP) batches, including: Project/generator name; Connection reference; Capacity (MW); Technology type; Processing batch (Gate number or ECP batch); Current status of the connection oer (accepted / expired / surrendered / connected). 2. Any policy papers, decision papers, or internal analysis regarding the treatment of stalled or lapsed biomass/bioenergy generator connection oers, including any consideration of "use it or lose it" provisions as they apply to biomass generators. 3. Any records showing the number and aggregate capacity of biomass/bioenergy connection oers that have expired or been surrendered since 2012.
- Received 24 February 2026Decided 1 April 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Reason is to look for a template to relate to and understand the business models of these types of services. Additional Q added: Regarding, Bonkers.ie, Switcher.ie etc, Is there any reason relating to CRU accreditation that has stopped them building out a comparison tool using the HDF file? Ie Similar to Kilowatt.ie or Energy Pal? It seems strange that they have not done so and wondering if accreditation with CRU has anything to do with it.
- Received 24 February 2026Decided 1 April 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Please forward copies of documents submitted for accreditation by Comparison Websites. 1) Bonkers.ie; 2) Switcher.ie; 3) Powertoswitch.ie; 4) Energyswitch.ie. Documents can be redacted if necessary.
- Received 27 February 2026Decided 26 March 2026Part-GrantedCommission for Regulation of Utilities (CRU)
We are requesting all existing records held by the CRU that relate to energy complaints classified as related to “switching” for the year 2024, as referenced in Section 5.3, Table 3 of the CRU Customer Care Team Annual Report 2024 (page 28). Personal identifiers may be redacted, and I am happy to receive the records in multiple files or in whatever format is most convenient. Specifically, I request: 1) All existing complaints closed in 2024 which were categorised as "Switching (e.g. delays, incorrect switching)" as per Section 5.3, Table 3 of the Customer Care Team Annual Report. Summaries are acceptable if full texts cannot be provided. 2) The outcome of each complaint (e.g., investigated, closed, referred, resolved).
- Received 3 March 2026Decided 25 March 2026GrantedCommission for Regulation of Utilities (CRU)
Under the FOI Act 2014, I am seeking the following: a copy of any correspondence between the CRU and its parent department with regard to the following report: Arrears and NPA Disconnections December 2025 Update.
- Received 3 March 2026Decided 24 March 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Please find below a request under the Freedom of Information Act 2014 for: 1) Correspondence with the Department of Energy regarding the analysis referred to by Deputy Jennifer Whitmore in this PQ: https://www.oireachtas.ie/en/debates/ /question/2026-02-24/169/#pq_169. 2) Correspondence with energy companies or groups acting on their behalf on the same matter. 3) From Feb 01 2025 to date.
- Received 22 January 2026Decided 11 March 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Seeking documents relating to the CRU's Price Review Six public consultation held last year. Please provide the 44 responses that were received to the consultation.
- Received 10 February 2026Decided 10 March 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: all non-environmental governance and administrative records related held by or for the CRU concerning the identification, screening, assessment, comparison, recommendation, and selection of the SGER terminal site in County Clare/Cahiracon and alternatives elsewhere, including the following categories: 1) Site options universe and screening trail: longlist and shortlist of candidate sites; Inclusion/exclusion decisions for each site and reasons; Records of any “gateway” criteria used to eliminate sites. 2) Methodology and criteria: Terms of reference and methodological documents; Criteria definitions, thresholds, scoring rules, and weighting methodology; Any amendments to criteria/weightings and records explaining why changes were made; Sensitivity analysis and robustness testing. 3) Comparative assessment outputs: Multi-criteria analysis outputs, ranking tables, scoring matrices; Cost-benefit analyses and option appraisal summaries; Working spreadsheets and model files used to derive rankings; Environmental constraints mapping/GIS overlays. 4) Risk and receiving-community assessment at site-comparison stage: Hazard identification and consequence- screening records used in site comparison; Assumptions used for population exposure, land use, vulnerable receptors, emergency response capability, and meteorology; Records addressing residual risk allocation to nearby/receiving communities.
- Received 10 February 2026Decided 10 March 2026Part-GrantedCommission for Regulation of Utilities (CRU)
5) Consultants and external advisers: Procurement records, requests for tender/quotes, award records; Contracts, scopes of work, deliverables, presentations, and author lists; Records identifying who prepared each key assessment and recommendation. 6) Recommendation and approval chain: First record recommending Cahiracon (or any preferred site); All subsequent recommendation records, including revisions; Minutes/notes/decision papers where recommendations were considered, accepted, modified, or escalated; Correspondence with other public bodies relating to preferred-site rationale. 7) Substantiation of public statements: Records evidencing public statements regarding: (a) number of coastal sites considered, (b) criteria used (technical/environmental/financial/planning), (c) use of multi-criteria and/or cost-benefit methods. 8) Records held “for” the authority: Any records held by consultants/contractors on behalf of the Commission for Regulation of Utilities concerning the above. 9) Search details: A note of record systems searched, date ranges, and business units searched. Additional CRU regulatory interface request: Please include all records where SGER site- selection assumptions were considered in regulatory and network planning contexts, including correspondence, submissions, and briefing material exchanged with the Department of Climate, Energy and the Environment and Gas Networks Ireland.
- Received 20 January 2026Decided 23 February 2026RefusedCommission for Regulation of Utilities (CRU)
Táim ag lorg na sonraí síos de réir an tAcht thuas: líon iomlán na ngearán a rinneadh chuig do chomhlacht ó dhaoine a bhí ag rochtain seirbhísí poiblí i gContae an Chláir ó 2023-2025; líon na ngearán a réitíodh i mbliain an ghearáin; líon na ngearán a bhí gan réiteach ag deireadh gach bliana; catagóir ghinearálta an ghearáin; líon na ngearán a rinneadh i nGaeilge nó i mBéarla; líon na ngearán inar fuair an ball den phobal toradh sásúil don tréimhse chéanna.
- Received 19 January 2026Decided 20 February 2026GrantedCommission for Regulation of Utilities (CRU)
Requesting: A copy of any briefings, reports and minutes prepared for any Quarterly Liaison Meetings in 2025 with the department under which this organisation sits.
- Received 9 January 2026Decided 9 February 2026RefusedCommission for Regulation of Utilities (CRU)
Requesting: information held by CRU in connection with any grid connection proposals, applications, technical assessments or system planning engagements relating to the following development: Developer: Shelbourne Solar Limited or EDF Energy or related company; Location: County Wexford (including the townlands of Dunmain, Garrydu, Ballykeerogemore, Ballykeerogebeg, Knockea, Killesk, Dunmain, Whitechurch, Killesk); Proposal: Solar PV generation and Battery Energy Storage System (BESS) together with associated substation and grid connection; Connection level (as publicly referenced): 110kV or 220kV with either via tail feed to the Great Island Power Station or a Loop In – Loop Out substation to either the Great Island to Kellis 220kV line or the Great Island to Lodgewood/Arklow 220kV line running through the proposed development site. For clarity, this request includes the following: Where the Developer is Shelbourne Solar Limited or EDF Energy or related company. For clarity, this request includes the following: Where the Developer is Shelbourne Solar Limited or EDF Energy or related company. The request also includes any communications with any agents of the Developer e.g. planning consultants or engineers; A 110kV or 220kV connection to any electricity infrastructure in the area – this is not to be limited to the final option which has been considered but should include all options which have been assessed even if these have been subsequently dismissed by either the Developer or electricity infrastructure provider;
- Received 9 January 2026Decided 9 February 2026RefusedCommission for Regulation of Utilities (CRU)
Any similar proposal in the proposed location in recent years in southwest Wexford in the townslands referred to above; Any information as outlined below in relation to communication or otherwise with the Developer and CRU or between CRU and Eirgrid or other utility companies in relation to the proposed development. As a concerned local resident and local landowner joining the proposed development, I am seeking access to the above for the following items at a minimum:1) Records confirming whether any application, pre- application notification, system study, meeting, calls or any engagement or correspondence relating to this project was received, initiated, processed or considered by CRU. This may be by the Developer or any other related entity over the past number of years in the proposed location. 2) Dates of receipt, registration, assessment, type of engagement, internal routing and final decision-making in relation to any such engagement. 3) Copies of any versions of: Overall project maps, diagrams, summaries and layouts; substation layout drawings and options considered; cable route corridor maps and options and analysis of routes; route option studies and conclusions (if any) and communication of same; bay availability or capacity options available for any 110kv or 220kV substation or circuits whether this be initial review, assessment, suitability report, studies, reserving or allocation. This should include but not limited to direct connection to Great Island (110kV or 220kV) or connection via Great Island/Kellis line or the connection via Great Island/Lodgewood/Arklow 220kV.
- Received 9 January 2026Decided 9 February 2026RefusedCommission for Regulation of Utilities (CRU)
If other options were considered and were subsequently dismissed, this information should also be provided; voltage selection/options: any documentation prepared whether it be internal communications or detailed reports or correspondence with the Developer or an agent; environmental or financial constraint mapping; analysis of future proofing of the proposed infrastructure for further expansion in particular in light of proposed upgrades to the aforementioned 220kV infrastructure: a) analysis / studies of potential linkages with other planned projects in the wider area, b) Any other technical materials relating to the project that has been received by CRU or provided to the Developer or has been created internally by CRU; Internal procedural checklists, workflow records, logs or standard operating procedures applied to this project; Any registers, databases, indices or tracking systems showing the movement or handling of records relating to the project; Metadata relating to the creation, modification or circulation of records (including document titles, dates, authorship fields and internal reference numbers, where held); Lists of third-party consultations or referrals undertaken by CRU in relation to this project (without seeking personal contact details); High-level system planning or overall network impact summaries insofar as they relate to the existence, feasibility or environmental footprint of the project. CLARIFICATION: A. I am okay with the request being based on the 2 aforementioned companies, Shelbourne Solar Limited and EDF Energy; B. Time Period, apologies for the subjectivity. This should apply from 1.1.2022 to 9.1.2026.
- Received 14 January 2026Decided 29 January 2026RefusedCommission for Regulation of Utilities (CRU)
Request: Tobin Consulting Engineers, are in the process of resubmitting an application to develop Lissinagroagh Wind Farm on behalf of FuturEnergy. The company stated that, following the preliminary design of the Lissinagroagh Wind Farm Project, layout and turbine locations, it is proposed that the project team will commence consultation initially with a list of bodies, in order to allow suicient time for receipt of meaningful feedback. Commission for Regulation of Utilities is listed as one of these bodies. Under the Freedom of Information Acts, I request: 1) A copy of this request; 2) A copy of the submission the Commission for Regulation of Utilities submitted for inclusion in this Environmental Impact Assessment Report.
- Received 5 December 2025Decided 12 January 2026GrantedCommission for Regulation of Utilities (CRU)
I would like to make a request under the Freedom of Information Act 2014. According to a Parliamentary Question reply, the minister for Climate Energy and the Environment said: "officials from my Department correspond with CRU on an ongoing basis to track developments in retail and wholesale energy markets, including the effect of Government supports on arrears levels, among other indicators. The CRU releases market monitoring data monthly to my Department." I would like to request correspondence between the CRU and the department in relation to the monthly market monitoring data.
- Received 3 December 2025Decided 2 January 2026Part-GrantedCommission for Regulation of Utilities (CRU)
All internal memoranda, risk assessments, model calculations or impact assessments prepared by CRU staff (or commissioned externally) since January 2024 relating to the August 2025 ‘Additional Customer Protection Measures for Household Electricity & Gas Customers 2025/26. I am also requesting worksheets, spreadsheets or summary tables showing projected impacts on arrears levels, disconnections, supplier obligations, and social vulnerability.
- Received 20 November 2025Decided 17 December 2025RefusedCommission for Regulation of Utilities (CRU)
Requesting access to records held by the CRU, including any records obtained from or held on behalf of Safe Electric / RECI, relating to the courses/qualifications and practical experience actually accepted for registration under the Safe Electric scheme. This request is confined to the last five years, i.e. for registrations decided from 20th November 2020 to the date of this request. For the avoidance of doubt, I am not seeking copies of the Safe Electric “Criteria Document” or the “Application for Registration Procedure”, which I understand are already publicly available, except insofar as they may be attached to or embedded within other records falling within the scope below. I am seeking records that reflect what has been accepted in practice for successful applicants.
- Received 17 November 2025Decided 11 December 2025RefusedCommission for Regulation of Utilities (CRU)
Requesting a copy of the CRU Licensing and Levy Management audit (circa Nov 2024)
- Received 3 November 2025Decided 8 December 2025RefusedCommission for Regulation of Utilities (CRU)
Requesting for each full calendar year from 2022 to the most recent year available: The total number of customer complaints about Uisce Éireann escalated to the CRU. Outcomes of those escalations, recorded as: Upheld; Part-upheld; Not upheld; Withdrawn / resolved prior to decision. Any annual summary reports or statistical tables already produced relating to CRU oversight of Uisce Éireann’s complaint-handling performance (for example, annual performance dashboards or KPI summary reports).
- Received 28 October 2025Decided 20 November 2025RefusedCommission for Regulation of Utilities (CRU)
If the course alone is sufficient and no further experience or proof was required please indicate this. 3) Other regulatory or procedural conditions that could affect registration eligibility (e.g. legal, insurance, or internal procedural requirements). 4) Other regulatory or procedural conditions that could affect registration eligibility (e.g. legal, insurance, or internal procedural requirements).
- Received 28 October 2025Decided 20 November 2025RefusedCommission for Regulation of Utilities (CRU)
Requesting access to records held by the CRU, including any records obtained from or held on behalf of Safe Electric / RECI, relating to qualifications currently accepted for registration under the Safe Electric scheme. Specifically, I request the following information, for each qualification, course, or award currently accepted by Safe Electric for registration: 1.Current acceptance status – confirmation that the course or qualification is currently recognised for registration purposes. If this is not available please confirm the most recent acceptance date of the course. 2) Practical experience requirements - a) Indicate whether the course itself fully satisfies any practical experience requirements for registration. b) Where additional practical experience beyond the course is required, please provide: i) Description of the experience applicants are expected to have completed. ii) Minimum duration or scope (e.g. months, hours, or number of projects). iii) . Format of evidence requested (e.g. logbook, employer reference, portfolio, or in-course assessment).
- Received 20 October 2025Decided 13 November 2025Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: 1) A copy of the most up-to-date tracker for the implementation of recommendations from audits; 2) A list of all audits carried out in the last two years to include the month and year of the audit and the overall assurance rating.
- Received 14 October 2025Decided 11 November 2025RefusedCommission for Regulation of Utilities (CRU)
Requesting a copy of correspondence between the Commission for the Regulation of Utilities and the Minister/Secretary General of the Department of Climate, Energy and the Environment regarding staffing levels and budget allocations since 01 January 2025
- Received 10 October 2025Decided 7 November 2025RefusedCommission for Regulation of Utilities (CRU)
I would like to request records under the freedom of information act. At the JOC, the CRU was asked – "Has the CR U ever done any analysis on the impact of data centre demand on prices": https://www.oireachtas. ie/en/debates/debate /joint_ committee_on_climate_ environment_and_energy/ 2025-09-24/speech/218/. I would like to request any records of research or analysis which explored this topic and records which relate to that topic (e.g. emails, briefing notes, etc.).
- Received 1 September 2025Decided 31 October 2025RefusedCommission for Regulation of Utilities (CRU)
This request includes, but is not limited to: Tariff schedules; Network charge structures; Policy proposals and regulatory submissions; Correspondence (letters, emails, meeting notes) with data centre operators or representative groups.
- Received 1 September 2025Decided 31 October 2025RefusedCommission for Regulation of Utilities (CRU)
Under the provisions of the FOI Act 2014, I wish to request access to records held by the CRU concerning electricity pricing, tariffs, and network charge arrangements for data centres operating in Ireland. Specifically, I request: 1) Copies of all records relating to the electricity tariffs, network charges, discounts, rebates, or special arrangements provided to data centres from 1 January 2015 to the present. 2) Any agreements, contracts, or correspondence between the CRU and electricity suppliers concerning preferential pricing or reduced network charges for data centres. 3) Internal CRU documentation, briefing papers, or reports relating to the decision to adjust household network charges while proposing reductions for large energy users, including data centres.
- Received 1 September 2025Decided 26 September 2025Part-GrantedCommission for Regulation of Utilities (CRU)
I am writing to request access to records held by your organisation under the FOI Act, 2014. In accordance with section 12 of the FOI Act 2014, I wish to request access to the following records/details: 1) Any internal briefings prepared for the department of energy/minister for energy in 2025 on the security of supply programme progress and any challenges it is facing. 2) The most recent list of gas power supply project timelines under the security of supply programme. 3) The most up to date estimated cost and duration of the TEG programme.
- Received 27 August 2025Decided 23 September 2025Part-GrantedCommission for Regulation of Utilities (CRU)
EP UK Investments (EPUKI) is writing to request information under FOI Act 2014 in respect of the Services Agreement referred to in the Information Paper CRU2023124 published on 17 October 2023, titled "Security of Electricity Supply - Retention of Moneypoint Units (MP1, MP2 &MP3).
- Received 27 August 2025Decided 23 September 2025Part-GrantedCommission for Regulation of Utilities (CRU)
This request is made following the CRU's decision dated 26 June 2025 (Ref: FOI 21/25), and the subsequent internal review request submitted on 25 July 2025. EPUKI remains concerned about the lack of transparency surrounding the Services Agreement and its implications for market completion, public expenditure, and regulatory oversight. The information requested: Please provide a copy of the EirGrid memo of 19 December 2022. referenced in Record 5 of the CRU's schedule of records in its decision of 26 June 2025. EPUKI has not been able to locate in the disclosed materials the memo mentioned and notes that Record 5 associates the memo with the exercise of the CRU's direction to EirGrid to enter into the Services Agreement. EPUKI therefore asks that this and any other relevant records to its request be located and assessed for disclosure. EPUKI also asks for any further information from its request of 29 May 2025 that the CRU considers should be provided in better serving the public interest in section 36(3) FOIAM, where section 36(1)(b) has been relied on in the CRU's decision to refuse or partly grant information. EPUKI further requests that the CRU assess whether further information can be granted on the application of section 18 for each record identified. Otherwise, adequate justification should be provided where the application of section 36(1)(b)
- Received 27 August 2025Decided 23 September 2025Part-GrantedCommission for Regulation of Utilities (CRU)
is still considered to result in on further grant or part-grant of information. EPUKI further requests copies of any records held - including documents, meeting minutes, emails and other correspondence that set out or otherwise indicate the reasons that CRU considers a requirement of exceptional circumstance applies in balancing the public interest under section 36(3) in relation to information identified in its request of 29 May 2025. If any part of this request is likely to be refused under FOIA 2014, EPUKI would appreciate release of any records that can be disclosed and for CRU to provide reasons for any redactions or refusals in accordance with Section 13 of FOIA 2014.