- Received 29 November 2023Decided 11 January 2024Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting the following reports located in or initiated by the CRU’s Finance Unit/Division and HR Unit/Division from 2019 to 2023: 1) A copy of all audit reports about the working of the CRU’s finance division/unit and the financial performance of the CRU. Only activities that would be reported on the CRU’s Annual Financial Statement are of interest. 2) A copy of all reports about waste or losses, where “financial waste or losses” are the result from the CRU’s financial activities. Only activities that would be reported on the CRU’s Annual Financial Statement are of interest.
- Received 29 November 2023Decided 5 January 2024RefusedCommission for Regulation of Utilities (CRU)
Requesting the following reports located in or initiated by the CRU’s Finance Unit/Division and HR Unit/Division from 2019 to 2023: 1. A copy of all the reports about wrongdoing (as set out by the Protected Disclosures Act 2014 and 2022) or bullying (as defined by the CRU’s staff policy). 2. Copies of the invoices presented by an external body that have submitted the aforementioned reports.”
- Received 25 September 2023Decided 20 October 2023RefusedCommission for Regulation of Utilities (CRU)
Requesting information relating to any assessment of the impact of SEM-22-090 & Mod_02_23 on the Imperfections Charge, and therefore the cost to consumer. Requesting the following records: 1) Analysis of cost to the Imperfections Charge of enabling energy payments for DSUs as laid out in SEM-22-090 & Mod_02_23. 2) Any deliberation or cost benefit analysis made on
- Received 25 September 2023Decided 20 October 2023RefusedCommission for Regulation of Utilities (CRU)
the basis of the above impact assessment. 3) Communications between Regulatory Authorities, TSOs, & Mos regarding the above assessments.
- Received 3 October 2023Decided 18 October 2023Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting 1) copies of any correspondence between the CRU and energy suppliers with regard to the winter moratorium for the 2023/24 winter period. 2) a copy of any correspondence between the CRU and its parent department with regard to the above.
- Received 8 September 2023Decided 2 October 2023RefusedCommission for Regulation of Utilities (CRU)
Requesting: 1) References to all studies-peer reviewed and published that have been used by CRU for the Remuneration of Renewables Self-consumers for exported electricity: Interim Clean Export Guarantee. 2) A list of all studies used by CRU to make their decisions on smart meters. 3) A list of all published and peer reviewed papers used by CRU as part of their research into smart meters. 4) Any independent research -citing the scientific and research bodies-for CRU on smart meters.
- Received 24 August 2023Decided 20 September 2023RefusedCommission for Regulation of Utilities (CRU)
Requesting any records substantively related to the 2009 decision to continue a rebate on the energy costs of Large Energy Users. That decision is contained in the Information Note CER09117
- Received 6 September 2023Decided 19 September 2023RefusedCommission for Regulation of Utilities (CRU)
Information Requested: 1. Details of all salary scales for all grades in the CRU, in Euro with the annual salary at every point in the scale. 2. Job title, directorate and department of all roles in the CRU and associated grades. 3. The number of staff employed at each of the grades at the date of this request.
- Received 2 August 2023Decided 31 August 2023Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting copies of any records held referringq or relating to the undercharging of the technology company Meta by the ESB.
- Received 18 August 2023Decided 30 August 2023RefusedCommission for Regulation of Utilities (CRU)
Requesting the policy document where the CRU stipulate to electricity suppliers that they are not allowed to revert customers back to MCC01.
- Received 2 August 2023Decided 25 August 2023RefusedCommission for Regulation of Utilities (CRU)
Requesting the landowner letters of consent related to Sections 48/49 applications of Mauricetown Windfarm.
- Received 14 August 2023Decided 25 August 2023RefusedCommission for Regulation of Utilities (CRU)
Requesting details of decision CER/05/081 relating to the Retail Market Design Service (RMDS)
- Received 27 July 2023Decided 24 August 2023Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting access to the following records/details: 1) Copies of correspondence sent from Minister from Eamon Ryan and his Department to the CRU relating to the investigation into the pricing strategies in place and the hedging strategies of the electricity market. 2) Copies of correspondence sent in response to the Minister and Department from the CRU. 3) Documents relating to the investigation, including correspondence sent to the energy companies. This should include all documents, minutes of meetings, correspondence, emails, memos and briefing documents.
- Received 6 June 2023Decided 5 July 2023RefusedCommission for Regulation of Utilities (CRU)
functions might have moved later); 3) Internal reports, meetings, minutes.
- Received 6 June 2023Decided 5 July 2023RefusedCommission for Regulation of Utilities (CRU)
Requesting records in relation to the government decision on July 14, 2009, to take a dividend from ESB and task CRU with distributing it to Large Energy Users between June and November 2009. This request should include but not be limited to: 1) any correspondence between the then CER and DECC; 2) any correspondence between the then CER and ESB 3) any correspondence between the then CER and the Department for Finance/DPER (which was not existing then, but the relevant
- Received 9 May 2023Decided 4 July 2023Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting copies of correspondence between the SEM committee and the TSO substantively relating to the Shannon LNG application to the T-4 Capacity Auction held in March 2023, and documents held by your organisation substantively relating to the Shannon LNG application to the T-4 Capacity Auction held in March 2023
- Received 31 May 2023Decided 21 June 2023GrantedCommission for Regulation of Utilities (CRU)
Requesting copies of any reports, briefings, memos, submissions or other such high-level documents prepared for the CEO or the board (or board equivalent) with regard to the growing number of domestic gas customers falling into arrears. This request to cover the period 1 March 2023 to date of receipt of the request.
- Received 6 April 2023Decided 11 May 2023RefusedCommission for Regulation of Utilities (CRU)
Requesting the release of all complaints sent by members of the public to the Commission since 2019 regarding the installation of electricity smart meters.
- Received 14 April 2023Decided 4 May 2023RefusedCommission for Regulation of Utilities (CRU)
Requesting the following Information under the “Freedom of Information Act 2014”: 1) Is the Smart meter Installation compulsory under law? 2) If so, please quote the specific Law stating that it is Law. 3) Do I have the right of refusal under law?
- Received 6 March 2023Decided 21 March 2023RefusedCommission for Regulation of Utilities (CRU)
Requesting all reports detailing any concerning matter; i.e chemicals/ pesticides/fungicides/ bacteria/fluoride/ chlorine/viruses et al contained in our Irish water supply.
- Received 27 January 2023Decided 8 March 2023Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting records directly leading to or emanating from the following meetings: 1) CRU/BGE quarterly Director meeting 05.09.22 (involving Karen Trant and John Melvin); 2) Central Bank on DDO issue 26.07.22 (involving Karen Trant and Loretta Joyce)
- Received 1 February 2023Decided 1 March 2023RefusedCommission for Regulation of Utilities (CRU)
Requesting: 1) Number of High Efficiency CHP (HECHP) Certificates issued by CRU since the CRU published its Decision Paper CER/12/125 on 2nd March 2012. 2) For each HECHP certificate issued by the CRU, detail the type of energy generation process other than cogeneration used as basis for the economic justification for heat demand in accordance with Decision Paper CER/12/125.
- Received 3 January 2023Decided 30 January 2023GrantedCommission for Regulation of Utilities (CRU)
Requesting records created by CRU-SEMC on or after 6 Oct 2022 arising out of any engagement with the following parties: 1) Eirgrid, 2) The System Operator of Northern Ireland, 3) ESB Networks, and 4) The Northern Ireland Authority for the Utility Regulation (including SEMC) relating to EPUKI application into and provisional failure to qualify units into the 2026/2027 T-4 Capacity Auction.
- Received 3 January 2023Decided 30 January 2023RefusedCommission for Regulation of Utilities (CRU)
Requesting records relating to capacity market de-rating factors for Demand Side Units (DSUs) during the period 1st April 2022 to 28th December 2022. Records to include, but not limited to: email, email attachments, reports, minutes, memos, meeting materials, presentations, briefings, SEM Committee submission documents and cover notes, excel or other spreadsheets format documents, modelling outputs, recommendation papers.
- Received 18 November 2022Decided 13 December 2022RefusedCommission for Regulation of Utilities (CRU)
Requesting the letter that the "Commission for Energy Regulation wrote to utility providers about the impact of top up charges on customers, particularly those who received pay as you go meters due to financial hardship". The letter was sent between April 2014 and September 2014 according to the Times article to utility providers in Ireland.
- Received 21 September 2022Decided 30 November 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: 1) Copies of any progress reports, update reports, and/or briefing papers provided by ESB Group (or any other ESB entity) in relation to new capacity units proposed for Ringsend, Poolbeg and Corduff that were successful at the 2022/2023 T-4 Capacity auction in 2019; 2) Copies of any minutes of meetings with the ESB and/or Eirgrid in relation to any issues in delivery of ESB's new capacity units proposed for Ringsend, Poolbeg and Corduff that were successful at the 2022/2023 T-4 Capacity auction in 2019; 3) Copies of any internal briefing papers or assessments in relation to any issues in delivery of ESB's new capacity units proposed for Ringsend, Poolbeg and Corduff that were successful at the 2022/2023 T-4 Capacity auction in 2019.
- Received 20 October 2022Decided 25 November 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting any emails, notes, memos, briefings and/or records in relation to a meeting held between Iberdrola and CRU Director Karen Trant on 31st May, 2022.
- Received 20 September 2022Decided 24 November 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: 1) Copies of any non-public briefing papers or reports related to assessments, inspections or audits of any electricity generation plants and/or units (thermal and renewables) by the Energy Safety Division since 1 January 2021; 2) Copies of any non-public reports, briefing papers, or assessments in relation to the overall functioning of the capacity market and/or specific capacity auctions since 1 January 2017.
- Received 7 October 2022Decided 24 November 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: Minutes from, presentations delivered at, and/or non-technical briefings provided for any Gas & Electricity Emergency Planning Group meetings in the past 36 months specifically concerning issues that may impact electricity supply (security of supply, transmission, generation capacity, etc).
- Received 20 October 2022Decided 23 November 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting any emails, notes, memos, briefings and/or records in relation to a meeting held between CRU Director Philip Hemmingway and New Fortress Energy on 14th of June 22.
- Received 24 October 2022Decided 21 November 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting the following records: A copy of the Business Case for Consultancy Support for Sos [presumed to be Security of Supply] Programme mentioned in Commission Meeting 934.
- Received 21 October 2022Decided 18 November 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting records (specifically meeting minutes, briefing papers for meeting attendees and/or specific records directly mentioned in the meeting minutes not already publicly available) related to the following meetings as outlined in CRU minutes: A) Meeting with Cloud Infrastructure Ireland (as stated in Commission Meeting 919); B) Meeting with Ernst and Young on CRM Review circa February 2022 (as stated in Commission Meeting 923), C) Meeting with the Minister (unnamed but presumed to be Minister Eamon Ryan) on energy security circa 28 April 2022 (as stated in Commission Meeting 936); D) Meeting with Amazon circa 4 May 2022 (as stated in Commission Meeting 936); E) Meeting with the EPA and DECC circa 20 June 2022 (as stated in Commission Meeting 945); F)Meeting with the IDA circa 21 June 2022 (as stated in Commission Meeting 945).
- Received 3 October 2022Decided 18 November 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: copies of any correspondence between the CRU and energy companies with regard to the introduction of a moratorium on disconnections for end 2022/start 2023, and copies of any correspondence between the CRU and DECC with regard to the above.
- Received 30 September 2022Decided 17 November 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: 1) Copies of any bi-annual or annual report to the Minister as may be required under the Code of Practice for the Governance of State Bodies to cover the period 2018-present; and 2) Any internal non- technical reports, briefings, or analyses written between 2014 and 2018 in relation to data centre energy/electricity usage/requirements and (potential) impact on the country’s energy/electricity demand and/or grid infrastructure.
- Received 6 October 2022Decided 16 November 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: 1) Any correspondence with or from electricity and gas utilities in relation to the enhanced consumer protection measures that were announced in August in relation to prepaid meters. 2) Correspondence with or from electricity and gas utilities in relation to measures for customers with prepaid meters since the announcement of the enhanced protection measures on 25 August. 3) Correspondence with or from the Department of Environment, Climate and Communications in relation to enhanced consumer protection measures for people with prepaid meters in relation to the decision to the announcement on 25 August and since. 4) Minutes and agendas of any meetings, internal to the CRU or with others such as government departments and utility companies, that discussed the enhanced consumer protection measures that were announced on 25 August and since.
- Received 10 October 2022Decided 11 November 2022GrantedCommission for Regulation of Utilities (CRU)
Requesting: 1) For the following meetings: A) Minister Ryan briefing on Security of Supply 24.11.21 (Commissioners listed in Commission minutes 915 as representatives), B) Microsoft Datacentre meeting 20.8.21 (Karen Trant listed in Commission minutes 902 as representative), C)Microsoft meeting re: data centres 14.06.21 (Jim Gannon, John Melvin and Karen Trant listed in Commission minutes 893 as representatives), D) IDA Meeting re data centres circa May 2021 (Jim Gannon and Karen Trant listed in Commission minutes 890 as representatives), E) Briefing to Minister Ryan on Security of Supply 01.04.21 (Commissioners, John Melvin and Karen Trant listed in Commission minutes 880 as representatives), F) Amazon Meeting 21/01/2021 (Jim Gannon and John Melvin listed in Commission minutes 874 as representatives),G) Meeting with Facebook 4.11.20 (Karen Trant listed in Commission minutes 860 as representative), H) Meeting with EirGrid re data centre connection policy 21.10.20 (Karen Trant and John Melvin listed in Commission minutes 858 as representative). 2)Also seeking the following records: meeting minutes; briefing papers; presentations; correspondence, including attachments, resulting directly from the meeting (such as a letter of reply, substantive discussion between staff in relation to issues raised at the meeting and/or where an analysis, briefing or assessment carried out following the initial meeting is included in the correspondence) but excluding correspondence in relation to the setting up or organising of physical or virtual meetings.
- Received 3 October 2022Decided 8 November 2022RefusedCommission for Regulation of Utilities (CRU)
Requesting: Copies of all complaints emailed by members of the public to the Commission for the month of September 2022 specifically on the rising costs of their energy bills.
- Received 10 October 2022Decided 8 November 2022RefusedCommission for Regulation of Utilities (CRU)
Requesting: Copies of minutes of all Security of Supply (SoS) meetings between Eirgrid and the CRU; Copies of any letters from Eirgrid to CRU as per security of supply obligations set out in Reg 28(10) of SI 60/2005, and any additional follow-up correspondence between the two authorities and/or separately with DECC (formerly DCCAE), including to Ministerial level.
- Received 20 September 2022Decided 20 October 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: Any information available through Minutes, Notes, Emails or other forms of communication concerning the following matter: The gas connections contracted by GNI which are related to “islanded” data centres that require a direct gas connection for on-sit power generation with limited or no connection to the electricity grid.
- Received 19 September 2022Decided 14 October 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: 1) All emails and letters exchanged between the DECC and CRU regarding CRU's proposals to charge large electricity users’ additional tariffs at peak periods. 2) All the emails and letters exchanged between the CRU and DECC regarding the Government's Statement on the role of Data Centres in Ireland Enterprise Strategy (published July 2022). Both FOI requests to cover the period from January 1 2022 to September 19th 2022.
- Received 10 August 2022Decided 7 October 2022RefusedCommission for Regulation of Utilities (CRU)
Regarding: The Decision paper on Dispatch, Redispatch and Compensation pursuant to Regulation (EU) 2019/943 dated 22 March 2022 (SEM-22-009) (the "Decision paper"). Requesting copies of all records held by/under the control of the CRU, including SEM Committee, or any of its service providers from 1 January 2020 to date, evidencing recording or referring to the following: 1)whether the Regulation is directly effective in Member States; 2) the discretion, if any, that the CRU had in relation to the implementation of the Regulation (and Article 13 in particular); and 3) the factors considered by the CRU when formulating the decisions in the Decision Paper in relation to Article 13(7) of the Regulation.
- Received 29 August 2022Decided 6 October 2022RefusedCommission for Regulation of Utilities (CRU)
Requesting: 1) Correspondence with the following bodies regarding the issue of energy costs for business: Department of Enterprise, Ibec, ISME, Small Firms Association, American Chamber of Commerce, IDA Ireland, Eirgrid 2) During 2022.
- Received 3 October 2022Decided 5 October 2022GrantedCommission for Regulation of Utilities (CRU)
Requesting the re-release of records released with the following FOI requests: 1. FOI 22/21; 2. FOI 23/21; 3. FOI 1/22; 4. FOI 18/22
- Received 13 September 2022Decided 27 September 2022RefusedCommission for Regulation of Utilities (CRU)
Requesting: records of all payments made by the Department to companies in respect of wind farms in Donegal in the past five years. Requesting 1) the name of each company, 2) The location of the wind development, 3) how much they were paid on each occasion and 4) the date each payment was made.
- Received 19 August 2022Decided 19 September 2022RefusedCommission for Regulation of Utilities (CRU)
Requesting: 1)All emails and letters exchanged between the DECC and the CRU regarding CRU's proposals to charge large electricity users’ additional tariffs at peak periods. 2) All the emails and letters exchanged between the CRU and DECC regarding the Government's Statement on the role of Data Centres in Ireland Enterprise Strategy (published July 2022). Both FOI requests to cover the period from 1st January 2022 to 19th August 2022.
- Received 16 August 2022Decided 12 September 2022Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: 1) copies of all emails sent to the email oireachtas@cru.ie from TDs and Senators in the months June, July and August (so far) 2022. 2)copies of all correspondence sent in response to emails to oireachtas@cru.ie from TDs and Senators in the months June, July and August (so far) 2022.
- Received 28 July 2022Decided 25 August 2022RefusedCommission for Regulation of Utilities (CRU)
Requesting: Reports prepared by the CRU for the government/DECC between the dates of March 2022 and the current date (28/7) on the power supply shortage facing the country.
- Received 28 July 2022Decided 25 August 2022RefusedCommission for Regulation of Utilities (CRU)
Requesting: Reports prepared by the CRU for the government/DECC on the prospect of gas shortages due to the war in Ukraine between the dates of March 2022 and the current date (28/7).
- Received 2 August 2022Decided 25 August 2022GrantedCommission for Regulation of Utilities (CRU)
Requesting: Copies of all correspondence between the CRU and its parent department with regard to the following decision: https://www.rte.ie/news/business/2022/0729/1313005- electricity-bills-to-fall-slightly-as-pso-levy-reduces/
- Received 20 July 2022Decided 17 August 2022RefusedCommission for Regulation of Utilities (CRU)
Requesting 1) any records (including correspondence and/or documents) containing or related to ESB's representations to the Regulatory Authorities (RAs) (which term includes the CRU) for the First Extension and Second Extension; 2) any records (including correspondence and/or documents) provided by ESB to SEMO (and in the possession of the CRU) and/or the RAs (which term includes the CRU) leading up to, or concerning, the Terminations;