Infrastructure
This chapter sets out the landscape of public EV charging infrastructure in the medium term. It explores the standards that will apply, as well as the existing and planned Government supports and funding instruments. These supports will target and address identified gaps in the EV infrastructure market. The chapter also sets out the objective for delivery of charge point infrastructure by 2025. This will support increasing EV uptake and ensure that charging infrastructure provision stays ahead of demand.
need for top-up charging where required.
5.1 Infrastructure Designed for Users
MEn-route charging, involving higher-speed,
higher-power charge points at strategic locations, will become increasingly important to cater for charging on the go. This will facilitate the quicker transition of high-mileage vehicle fleets to EV technology. It will also address range anxiety.
Everyone experiences charging differently. Designing services which people will use and enjoy requires an understanding of users’ different charging needs, their perceptions, and their feelings during the entire charging journey. The development of personas as part of this final strategy helped stakeholders to understand and empathise with a diverse range of customer needs, and to embed a customer mindset into the decision-making process. This user-centred approach is and will continue to be key for the development of standards and for the provision of Government supports and funding instruments as part of this strategy.
Ultimately, there is no one charging solution for EV users: each type of charge-point will be used at some point by EV drivers, depending on their needs and circumstances on a given trip. What is important is to deliver sufficient charge points of different types so that each user can charge in a convenient, energy-efficient, and cost-effective manner.
5.3 Risks and Dependencies
5.2 What will be delivered
Delivery of the EV Charging Infrastructure Strategy (particularly the AFIR infrastructure targets) will be highly challenging and require transformation of existing systems and processes. It is recognised that there are associated risks that will need to be managed and mitigated by ZEVI and key stakeholders to enable the delivery of the strategy. Table 3 below shows a high-level risk and dependency view. These will be managed as part of the Implementation Plan where an in-depth risk and dependency analysis will be completed as part of the National EV Charging Network Plan.
The ambition of this strategy is to deliver an EV charging network that will meet and be ahead of EV users’ needs. Underpinned by the strategy’s fundamental principles, and the understanding of consumer needs, delivery of EV charging infrastructure will be guided by the following understandings:
MHome charging should be the main form
of charging for most electric vehicle owners. Actions will be taken to prioritise the installation of smart home chargers and to encourage the deployment of V2G technologies where feasible.
MResidential neighbourhood charging will
provide a similar solution to home charging for EV owners without access to a driveway.
MDestination charging will bridge the gap
between home and local charging and meet the
Table 3: Risks and Dependencies for Delivering EV Infrastructure
| Risk | Dependency | Stakeholders |
|---|---|---|
| Lack of available grid capacity to meet demand within the timelines | Investment in grid capacity Establish a working group to manage this particular risk Deliver a National EV Charging Network Plan for AFIR | ZEVI ESB Networks Transport Infrastructure Ireland Commission for Regulation of Utilities Local Authorities Charge Point Operators SEAI |
| Lack of site availability for implementation of charge points across schemes | National Planning Framework | |
| Lack of available staff & resources for delivery | Resourced stakeholder recruitment plans | |
| Lack of adequate public & private funding in the years up to 2025 | ZEVI funding plan within Department of Transport planning process Available private funding for investment |

Figure from page 47
5.4. EV Infrastructure Standards
mandated through European regulations, the Alternative Fuel Infrastructure Regulation (AFIR), and Irish legislation and regulations. The following standards will apply for publicly-accessible charging points:
Ensuring that EV charging infrastructure works for everyone is a key aim of this strategy, and one that will uphold the principles outlined in Chapter 2. EV infrastructure standards will be
Table 4: Required Standards
| User Needs | Required Standards |
|---|---|
| Ease of Payment | M All new public charge points installed after the Alternative Fuels Infrastructure Regulation comes into force (expected to be in 2023), will be required to accept card payments by means of a contactless facility. This will enable ad-hoc transactions. M From 1 January 2027 onwards, charge point operators shall ensure that all publicly-accessible charging points operated by them (and that have a power output equal to or more than 50 kW) can accept card payments. M Charge point operators will clearly display their prices, as well as comparison costs for other fuels. As a result, this information is known to end users before they initiate a charging session. Pricing will be non-discriminatory. |
| Accessibility Standards & Safety | M ZEVI will consult on accessibility standards for all users in Q1 2023. Accessibility guidelines for EV charge points in Ireland will be published following this consultation. From then on, public charge points will need to adhere to these standards. |
| Data Sharing to Facilitate Innovation | M Charge points will be enabled to send and receive data dynamically, enabling the flow of information between market actors that are dependent on this data to fully develop the charging experience. Such parties include charge point operators, mobility service providers, e-roaming platforms, ESB Networks and, ultimately, end consumers. In 2023, ZEVI (in consultation with stakeholders) will publish a Data Strategy of how information will flow and be used. |
| Interoperability | M While the market may dictate additional connectors, charging points for light-duty vehicles will be equipped (at least) with Type 2 connectors for AC connections and Combo 2 connectors for DC connections. Future innovations, such as wireless charging, will also be required to comply with minimum technical specifications. |
| Smart Charging , V2G, and Innovations | M From one year after AFIR comes into force, all new public charge points (installed from that point onwards) will be required to be enabled for smart charging. This will enable future Vehicle-to-Grid operations and other system services and efficiencies such as electricity-demand regulation. |
| Sustainability Tracking | M In tracking the progress made under this strategy (and in alignment with other relevant strategies such as the Sustainable Mobility Strategy), we will be tracking sustainability benefits. |
| Reliability and Reporting | M Reliable infrastructure is critical to mass-market rollout. ZEVI will consider options for ensuring reliability of service for EV users, with reference to actions in other jurisdictions. It will implement such options if appropriate or required. |
5.5 National Publicly-Accessible Infrastructure Targets
With an estimated number of 195,000 plug-in EVs on the road by 2025, this target could be achieved through a number of different chargepoint scenarios. The table below outlines five example possibilities. The optimum mix of charge points will depend on driver needs, and the ability to deliver the charge points in a timely manner. The most likely outcome is scenario 2, 3, or 4 below. The amount of charge points and kW power required to meet this target will be finalised in 2023.
In addition to addressing each of the four main categories of infrastructure above, ZEVI will ensure that a national fleet-based target will be achieved. An overall fleet-based target will ensure that publicly-accessible charge point infrastructure will meet the demands of EV uptake across the country in both urban and rural areas. An EU target is currently being considered and will form part of AFIR. This target is expected to include, at a minimum, the installation of:
Each one of these new charge points will have to overcome challenges of site availability, planning, electrical connections, resources, and funding.
M1 kW of charging infrastructure for each BEV
and
M0.66 kW of charging infrastructure for each
PHEV
Table 5: Charge Point Rollout Scenarios
| Residential/ Neighbourhood 0-22 kW | Destination/ En-Route 23 kW-350 kW | Total Number of Publicly- Accessible Chargers Nationwide | Total Charging Power Nationwide (kW) | |
|---|---|---|---|---|
| Existing | 1,349 | 374 | 1,723 | 67,237 |
| Scenario 1 | 1,460 | 1,080 | 2,540 | 169,000 |
| Scenario 2 | 1,650 | 1,300 | 2,950 | 169,000 |
| Scenario 3 | 1,990 | 1,320 | 3,310 | 169,000 |
| Scenario 4 | 2,660 | 1,180 | 3,840 | 169,000 |
| Scenario 5 | 4,070 | 780 | 4,850 | 169,000 |
5.6 Existing Exchequer supports for charging infrastructure
Electric Vehicle Apartment Charging Grant76
Since July 2022, the Electric Vehicle Home Charger Grant has been expanded to include shared parking in apartment blocks and similar developments.
Currently, Exchequer funding is available for the following types of EV charging infrastructure:
5.6.1 Home charging
The Apartment Charging Grant is administered by the SEAI and assists residents and owners of apartments and other multi-unit developments who want to install a home charger for their EV. The grant is designed for bulk installation of chargers at a single location, and provides up to 80% supports for cabling, infrastructure, labour, and construction costs. Owners, management companies, housing bodies, local authorities, and commercial and private landlords can apply.
Electric Vehicle Home Charger Grant75
Established in 2018 and administered by the SEAI, this grant provides up to €600 towards the installation cost of a domestic charge point.
Since July 2022, the grant is now open to all homeowners, whether they own an electric vehicle or not. The resulting charge point can also be used for visitor use or at rented accommodation.
Under building regulations, a building (containing one or more dwellings) undergoing major renovations, which has more than 10 car-parking spaces, shall install ducting infrastructure for each space. This enables the subsequent installation of charging points for electric vehicles.
Since September 2022, the Electric Vehicle Home Charger Grant only supports smart chargers. Applied systematically, smart charging can maximise efficiencies and cost savings for EV users and across the electricity distribution network. It can also maximise the use of renewable electricity on the electricity grid through service provision to networks. For example, this can be done by designating nighttime hours as the default charging time, or using Vehicle-to-Grid technologies.

Figure from page 50

Figure from page 50
5.6.2 Residential/Neighbourhood Charging
Electric Vehicle Public Charge Point Grant77
This scheme, which is administered by the SEAI, has been in place since September 2019. It provides local authorities with a grant of up to €5,000 per charge point to support the development of on-street public charge points.
The main focus of the scheme is to provide
75 https://www.seai.ie/grants/electric-vehicle-grants/electric-vehicle-home-charger-grant/
76 Apartment Charging Grant | EV Grants | SEAI
77 https://www.seai.ie/grants/electric-vehicle-grants/public-charge-point/
support for the installation of infrastructure for EV owners who don’t have access to a private parking space. Funding is provided for the installation of 22 kWh standard charge points.
Much success is based on the actions of the local authority in determining the number and locations of charging points to meet the needs of their local residents.
As part of a review of this scheme, ZEVI have reviewed supports for local authorities in other countries. There are a range of models across Europe supporting the delivery of EV infrastructure by local government, including:
Based on the review carried out by ZEVI, the current EV Public Charge Point Grant will be retired and a new suite of supports for local authorities will be introduced as outlined in 5.7.2 below.

Figure from page 51
MGovernment delivery and operation of charge
points;
MGovernment funding of the enabling capital
works, with installation and operation of charge points delivered through the private sector;
MThe full outsourcing of capital works, charge
point installation, and operations.
The different business models require different levels of capital investment and ongoing supports from local authorities. Varying levels of revenue are received, depending on the profitsharing arrangements and the amount of work outsourced.

Figure from page 51
eSPSV Infrastructure Grant Scheme
The FASTER Project79
The eSPSV Infrastructure Grant Scheme was designed to encourage more taxi drivers to convert to electric vehicles. The project involves installing taxi-dedicated electric vehicle charge points at major transport hubs nationwide. These hubs are places where multiple transport modes, including road, rail, light-rail, and air travel networks intersect.
The FASTER Project is an international joint initiative that aims to support the installation of 50 kW capacity in 73 EV charging stations on the island of Ireland and in Scotland. The project, which is a partnership between regional and local authorities and academic institutions in all three jurisdictions, has been awarded over €6.4 million from the European Union’s INTERREG VA Programme.
Since the launch of the Scheme in 2020, charge points have been installed in Dublin (Heuston), Cork (Kent) and Limerick (Colbert) train stations as well as at Dublin and Cork airports. Further funding was made available in 2021 to support the installation of charge points at more Irish Rail locations. In 2022, this was extended to Shannon airport.
The Ireland-specific part of the project aims to fund up to 40 fast charge points in various locations on both sides of the border. The target date for delivery is May 2023.
5.7 New Infrastructure Supports to deliver for User needs:
5.7.1 Home Charging/Shared Charging
How might we ensure that taxi drivers have dedicated access to chargers at busy periods?
ZEVI will work with the private sector to incentivise and popularise the use of ‘shared charging’ (a person renting out the use of their home charge point to other EV owners) on a wider scale in Ireland. Shared charging can bring significant benefits, particularly in urban areas, where it can provide a charging solution for EV owners without a home-charging option themselves.
5.6.3 Top-up charging (Destination and En-route)
Climate Action Fund: EV Infrastructure Delivery78
In 2018, €10 million was committed from the Climate Action Fund to support ESB investment in the charging network. This has leveraged a further €10 million investment from the ESB. This intervention will result in:

Figure from page 52
M90 additional high-power charge points, each
capable of charging two vehicles;
How might we encourage and support owners of home chargers to rent their personal chargers when not in use?
M52 additional fast charge points, which may
replace existing standard charge points;
M264 replacement standard charge points,
with more modern technology and with each consisting of two charge points.
This project is ongoing and will contribute to the provision of EV infrastructure within the timeframe of this strategy, with an expected completion date of 2023.
78 https://esb.ie/ecars/our-network/network-upgrades
79 https://www.fasterevcharge.com/
5.7.2 Residential Charging

Figure from page 53
The ZEVI office has been working closely with local authorities to consider how best to support them as they roll out EV charging infrastructure in their jurisdictions. A key action for local authorities will be to work with ZEVI to enable and support the delivery of residential-area charging networks for residents without access to home or apartment charging solutions.
To support local authorities, ZEVI will launch a comprehensive new suite of co-funding supports. This will include supports for:
5.7.3 Destination Charging
A multifaceted scheme is proposed to fund the installation of charge points by the public and private sectors at trip-generating locations or destinations. These will support EV users in making top-up charges while out and about. Traditionally, destination charging has occurred at visitor and tourist attractions, retail outlets, car parks, public amenities, hotels, leisure facilities, etc.
MPlanning and designing an EV charging network
at local and regional levels, along with an implementation plan for delivery. These will comprise both on-street charging in areas where residents do not have access to home charging solutions, and destination charge points at local authority facilities.
MDevelopment of business cases for funding.
MSupport for procurement of services.
Installing fast EV infrastructure at these locations will provide a reliable network of publiclyaccessible charge points that can also be accessed by the surrounding community, tourists, and others who visit these areas.
MFunding of at least 75% for EV charge points
that have been identified.
A new Residential Neighbourhood Charging Scheme will be launched by ZEVI to provide EV charging for residents without access to off-street parking. This type of charging will be designed to mimic home charging, and will incentivise off-peak charging in a location convenient to the resident’s home. It is envisaged that this scheme will provide significant co-funding of at least 75%.
In addition, some destination locations (such as hotels and guesthouses), where visitors stay and park for longer durations, would be supported in delivering slower charge points. To receive such support, these charge points would need to be publicly-accessible.
ZEVI is pursuing a number of strands for this scheme including:
Residential charging points delivered under the new scheme would have a charging capacity of 7-11 kW per charging point.
MMain Destination Charging Scheme including a
Visitor Sites Scheme
Local charging can also support car-sharing e-mobility solutions, which in turn support wider access to EVs where access to sustainable mobility options is limited. ZEVI will work with the car-sharing sector and local authorities to pilot the provision of charging infrastructure to support e-car clubs.
MSports Centres Scheme
MCommunity Centres Scheme (Just Transition
Fund Scheme)
MCar Clubs
MThe Main Destination Charging Scheme will
operation of EV infrastructure. Alternatively, they could operate the charge points themselves.
be open for applications from the public and private sectors, organisations such as hospitals, leisure facilities such as municipal swimming pools, cultural centres, hotels, cinemas, and shopping centres.
How might we best support hotels and local communities to install chargers in areas where there is an influx of tourists only during busy seasons?
MThrough the Visitor Sites Scheme, ZEVI will
also launch new grant schemes to support the rollout of publicly-accessible electric vehicle charging infrastructure at both state-owned and commercial visitor locations nationwide. Community centres will also be included in these schemes.
How might we provide additional alternatives to those who don’t get to use destination charging facilities?
MThrough the Shared Island initiative, ZEVI is
developing a scheme to fund a network of publicly-accessible fast charge points in local sports clubs across the island. The Sports Centres Scheme will build on the successful Government initiative of the Sports Capital Grants, which greatly improved sports facilities and communities in recent years.
How might we encourage local sports clubs and other key attractions to install EV chargers?
How might we ensure that people with special requirements in terms of accessibility have enough options and information about where to charge their EVs?
MZEVI will pursue funding through the Just
Transition Fund to fund a Community Centre Scheme. It is envisaged that, in particular, the provision of destination charge points at visitor locations, sports clubs, and community centres in rural areas, the Gaeltacht, and the Islands will support the transition to EVs in these communities.
How might we enable people who only need a car a few times a year to avoid car ownership but still have the use of a sustainable car when needed?
MEV Car clubs offer a significant opportunity
for avoiding car ownership, enabling more use of public transport while still having access to sustainable motoring when other sustainable mobility options are not available. Destination charging can support car-sharing e-mobility solutions. ZEVI will work with the car-sharing sector and local authorities to pilot the provision of charging infrastructure to support e-car clubs.
5.8 En-route charging network
There are already many private charge point operators that serve Irish consumers, providing both fast and high-powered charge points. Most of these charge points are stand-alone or set in groups of two to four. They are found in a range of different locations, such as petrol station forecourts, hotels, and streets80. It is expected (as in other countries) that as EV growth continues, an increasing demand will be placed on high-
In all destination charge point schemes, it is anticipated that ZEVI would provide funding for civil and electrics works, to enable the installation of EV charge points. Landowners could then consider leasing facilities to a charge point operator for installation, maintenance, and
80 https://www.zap-map.com/live/

Figure from page 55
speed charging infrastructure across the strategic road network.
Patterns of charge point use in countries with high EV uptake also suggest that demand for higher-speed top-up charging is likely to increase with greater numbers of EVs on the roads81. It is also anticipated that more private operators will enter the market for this high-speed charging provision.
En-route charging will be at the highest power, typically ultra-fast chargers with a minimum of 150 kW and up to 350 kW. This will enable users to stop and top up their vehicle charge within 10 minutes before continuing their journey.
ZEVI will place a renewed strategic focus on delivering highpowered public charge points in heavily-trafficked areas and along key parts of the national road network to reduce queuing time, reduce range and charger anxiety, and improve the EV driver experience.
Strong feedback to our draft consultation shows that a major increase in high-power charging infrastructure will be required to stay ahead of EV demand. This is also indicated by the Alternative Fuels Infrastructure Regulation. In addition to mandating an overall level of EV charging power as outlined in 5.5 above, the forthcoming requirements under the AFIR will set a framework for engagement with the private sector. This framework will establish a delivery model for Ireland’s en-route chargers. Distance-based targets for the TEN-T Network should ensure full coverage of electric charging
points along the main road networks as follows:
- By the end of 2025, there will be at least one charging pool with at least 300 kW of charging capacity (including at least one rapid-charge point of 150 kW), every 60 km on the TEN-T Core Network. This network is coloured yellow on the map and includes the following motorways and national routes: N7, N69, N8, M1, N28, N40, and M50.
81 OECD/IEA (2018), Nordic EV outlook 2018: insights from leaders in electric mobility, p. 44 of 105.
5.9 Heavy-duty vehicle charging hubs
- By 2030, this level of cover will be deployed throughout the full TEN-T Comprehensive Network and the capacity on the Core Network will be doubled to 600 kW.
The transition of heavy-duty vehicles from fossil fuel to electricity has been slower than in the light-vehicle industry. However, truck manufacturers have either already started or are about to start series production of their new zero-emission trucks82. The transition to electric buses is also significant across Europe, particularly in the city-bus sector, where 21% of all new registrations were electric in 202183.
Following the publication of this Electric Vehicle Charging Infrastructure Strategy, ZEVI, in conjunction with TII, ESBN, and private operators, will develop a National EV Charging Network Plan (En-Route Charging). This will consider the charging infrastructure needs for en-route charging along with the dedicated infrastructure requirements for heavy goods vehicles. Pending the final agreement of the AFIR regulation, this implementation strategy should be delivered in Q2 2023.
The charging needs of buses is likely to be met at bus stations and bus depots, with opportunity charging taking place on public infrastructure.
The delivery of this en-route EV charging network will reassure existing and future EV users who may have concerns about EV charging availability, particularly when planning longer journeys.
The Climate Action Plan has called for 700 HDVs and 300 electric buses by 2025, growing to 3,500 low-emission trucks and 1,500 electric buses by 2030. It is expected that the speed of adaptation to electricity will take off significantly in the latter half of this decade.
How might we design wayfinding solutions so that people can easily find EV chargers en route?
In addition to catering for Irish vehicles, charging infrastructure must also cater for the international haulage business which will be dependent on public charging infrastructure in Ireland.
How might we create a safe and pleasant en-route charging location for users?
The Alternative Fuels Infrastructure Regulation is expected to call for a skeleton infrastructure to be installed by 2025, with this to be rapidly increased by 2030 and 2035.
How might we provide a seamless charging experience, especially for those not familiar with the service?
It is estimated that by end of 2025, at least 8 charging pools, dedicated to infrastructure for HDVs (including buses), will be installed across the TEN-T Network (motorway network). Each motorway charging pool will consist of an aggregate charging capacity of 1400 kW with at least one 350 kW charger.
How might we ensure that the number and power of enroute chargers is adequate to minimise queuing?
In addition to this, by 2025, a dedicated HDV charging pool of at least 600 kW will be present at each of Dublin, Cork, and Shannon airports.
How might we provide accessible chargers and information for those who need them?
In order to enable the delivery of this infrastructure, ZEVI will work with private
82 Getting zero-emission trucks on the road - ACEA - European Automobile Manufacturers’ Association
83 Cities are buying more electric buses, but an EU deadline is needed (transportenvironment.org)
sector providers, as well as TII, ESBN, and local authorities to develop a National EV Charging Network Plan (En-Route Charging) for HGVs. The key risks and dependencies outlined in Table 3 are particularly pertinent in relation to this category of charge point infrastructure. The National EV Charging Network Plan (En-Route Charging) for HGVs will consider what mitigation measures can be put in place as well as considering how the supply of enabling services can be delivered. As well as this, ZEVI will engage with haulage industry stakeholders, DAA, and Cork and Shannon airports to deliver this goal.
How might we ensure that charging requirements don’t unnecessarily delay HGV drivers who are working to tight deadlines?
How might we design forecourts in a way that gives HGV drivers access to dedicated HGV chargers and spaces to rest?
Sustainable Transport Hierarchy
| Walking and wheeling | ||
| Cycling | ||
| Public transport | ||
| C sh | ar clubs, taxis & ared transport & oods vehicles | |
| g | ||

Figure from page 57
CHAPTER
6
Implementation
This final chapter contains information on the ZEVI structures, the high-level actions, funding streams, and supports that have been implemented since the publication of the draft strategy in March 2022. It also presents an overview of the Implementation Plan. The draft version of this strategy underwent a public consultation process. Details from that process have been incorporated into this final strategy.
maximising cooperation, the Government will work with the Northern Ireland Executive to promote and support EV charging infrastructure deployment. This will happen through initiatives such as the Shared Island Fund, as well as through other international collaborative and funding opportunities. This collaborative approach will help integrate and standardise public charge point networks on the island, to ensure ease of use and application for cross-border travel.
6.1 Governmental and Collaborative Structures
This section sets out the key structures that have been established to facilitate and quicken the delivery of electric vehicle charging infrastructure in the coming decade. Collaboration has been identified as an important part of the process and these structures aim to maximise the positive effects of sharing expertise.
In July 2022, the Government established a new office within the Department of Transport: Zero Emission Vehicles Ireland (ZEVI). ZEVI will coordinate the provision of EV supports and grants, as well as the delivery of charging infrastructure. It will also coordinate and steer the collaborative efforts to deliver EV infrastructure and ensure a satisfactory experience for all EV users.
The delivery of this EV Charging Infrastructure Strategy will be achieved by a wide range of actors and stakeholders acting together to:
MShare knowledge and best practice;
MAccommodate planning and regulatory
structures;
MDrive investment;
MIdentify optimal charge point locations and
technologies.
This chapter gives more detail on ZEVI and on the composition and purpose of the collaborative delivery groups that will be formed to support it.
Achieving successful infrastructure delivery will involve addressing key consumer concerns about affordability, convenience, and ease of use. Partnerships and collaboration will be encouraged between public and private stakeholders, academics, energy network operators, energy providers, and regulators as they work together to pilot infrastructure and to develop innovative technologies and solutions. Successful delivery will also be based on the identification and sharing of relevant data, and on targeted research and information sharing to address knowledge gaps.
6.2 Zero Emission Vehicles Ireland (ZEVI)
The Government has established the Zero Emission Vehicles Ireland office. ZEVI will co-ordinate and deliver the policy pathway for low-emission vehicles.
ZEVI will draw on international best practice and will leverage expertise from across a number of organisations that deliver EV policy measures and support services. It will be responsible for the strategic coordination of EV policy and strategy, management of EV grants and incentives, and
Cross-border engagement across all levels of Government will be required to support the development of public charging networks on an all-island basis. Based on a principle of

Figure 3: ZEVI Organisation, Structure, and Governance
Information Line Accountability Line Reporting Line
Department of Transport
Programme Management Office (PMO)
Assurance Board
ZEVI Assurance Board
Progress Group
ZEVI Progress Board
Strategic Advisor
EVPP Working
ZEVI Leader*
Group
Task Group (& Sub-Groups) (Planning & Infrastructure Delivery)
Engagement & Vehicles Communication
Policy & Strategy
Stakeholders Public
Standard Fast High
Pillar Activities Cross-Pillar Activities
the Implementation Plan for this EV Charging Infrastructure Strategy.
ZEVI has four pillars of focus: Policy & Strategy, Infrastructure, Vehicles, and Communications and Engagement.
ZEVI will bring together the various vehicle grant schemes that are currently in place. These grants are a crucial part of addressing gaps in the market and ensuring early-adopter EV uptake. This is especially important until the lifetime costs of electric vehicles are priced similarly to fossil-fuel vehicles. As this price parity moves closer, such supports will be gradually phased out84, and it is expected that Government funds will focus on the delivery of charging infrastructure.
The ZEVI Assurance Board and Progress Board bring together the key enablers for the delivery of this strategy (ZEVI, SEAI, NTA, TII, and ESB Networks) with other key stakeholders such as the CCMA and the CRU.
In addition to the Assurance and Progress Boards, there is a wide range of stakeholders who will contribute to the objectives of the strategy and without whom, the strategy could not be delivered successfully. To facilitate this wider collaboration, ZEVI established three infrastructure stakeholder groups and one vehicles stakeholder group to share knowledge and best practice, and to identify barriers and potential solutions.
ZEVI will coordinate and support the development and rollout of publicly-accessible charging infrastructure. It will collaborate with the public and private sectors, as well as service providers, to deliver destination charging, residential neighborhood charging, and Alternative Fuel Infrastructure Regulation (AFIR) infrastructure targets (particularly along the TEN-T Network)85.
MGroup 1: Public Sector Energy Delivery Group
MGroup 2: Public Sector EV Infrastructure
Delivery Group
The ZEVI office sits within the Department of Transport. The organisation and governance of the office is outlined in Figure 3, above.
MGroup 3: Public-Private Infrastructure
Stakeholder Group
84 Dept of Transport (2021) Electric Vehicle Policy Pathway Working Group report, pp. 10-11, p. 21.
85 See proposed Alternative Fuels Infrastructure Regulation and proposed TEN-T Regulation revision.
representatives from a range of organisations.
MGroup 4: Public-Private Vehicles Stakeholder
Group
The delivery group will provide expertise to support the delivery of a comprehensive national EV charging network. At an early stage, it will identify issues and challenges emerging in the implementation of this strategy and provide solutions and guidance where appropriate. The group will work to integrate EV infrastructure provision into the planning framework, while considering local energy provision. The group will also consider whether new regulations are required to facilitate the provision and installation of EV infrastructure.
In addition to engaging with stakeholders through these formal groups, ZEVI will engage strongly with citizens. This will be done through the website, social media channels, and a comprehensive communications program.
6.2.1 Public Sector Energy Delivery Group
The Public Sector Energy Delivery Group will bring transport and energy expertise to inform the delivery of EV infrastructure.
6.2.3 Public-Private Infrastructure Stakeholder Group
The energy sector plays a fundamental part in the successful delivery of EV charging infrastructure. ZEVI has established a Public Sector Energy Delivery Group comprising representatives from relevant Government Departments, agencies, and the energy sector. This group will consider the wider impacts of the electrification of transport in Ireland. In so doing, it will review and consider energy impacts of increasing EV uptake, monitor grid constraints, and consider safety requirements. The group will engage with key actors in the planning and delivery of EV infrastructure.
ZEVI established a new multistakeholder Public-Private Infrastructure Stakeholder Group to provide a partnership approach to EV infrastructure delivery.
Extensive and continuous engagement with external stakeholders, industry bodies, service providers, and consumers will be central to the Government’s approach to delivering infrastructure. Best-practice examples in other jurisdictions are clear about the benefits of such engagement as a way of sharing information, addressing blockages, encouraging investment, ensuring stakeholder buy-in, and meeting the needs of citizens.
6.2.2 Public Sector EV Infrastructure Delivery Group
The Public Sector EV Infrastructure Delivery Group will bring together public bodies active in the delivery of EV infrastructure.
ZEVI has convened a new Public-Private Infrastructure Stakeholder Group, drawing together representatives from the EV ecosystem, public sector, industry, and academia. Its focus will be on identifying optimal policy levers, funding sources, and innovations to support EV infrastructure delivery. It will be transparent, responsive to market shifts and technological developments, and will facilitate best practice and knowledge sharing.
ZEVI will collaborate closely with other Government departments, public sector bodies, and local and regional authorities to develop integrated policy and implementation approaches to EV infrastructure delivery86.
To this end, ZEVI has convened an interdepartmental and inter-agency Public Sector Infrastructure Delivery Group, drawing together
In countries with high levels of EV uptake and EV charging infrastructure provision, such as
the Netherlands or Germany, the creation of a supportive environment for innovation has been identified as one of the factors that contribute to increased EV adoption87. Innovation can involve synergies and linkages between stakeholders, as well as between energy, transport, and digital technology systems. Business-model innovation has also been identified as a potential contributor to increased infrastructure provision, allowing the development of new types of commercial relationships between stakeholders, local authorities, and service providers. It also allows the integration of different types of sustainable mobility88.
Alternative Fuel Infrastructure Regulation. The AFIR will require operators of charge points to provide static and dynamic data to a National Data Point which in turn will share it with the industry.
This group will also consider how best to ensure a wider public awareness of EV technologies and charge-point networks. The group will support the work of ZEVI in this area.
Collaboration between businesses, research institutions, and public bodies has also emerged as a source of innovation and of new technological and digital solutions to EV charging challenges and opportunities. Data and evidence gaps will be addressed by leveraging national research and enterprise-funding opportunities, and by working with the university sector to carry out EV-charging research and pilot projects.
The stakeholder group will consider and make recommendations on how best to support and accelerate the rollout of charging infrastructure according to user needs (including safety and security).
The group will also consider how best to implement the data-sharing provisions of the

Figure from page 62
87 For example the Dutch ‘Formula E-Team’ or ‘Living Lab Smart Charging’ initiatives, Netherlands Enterprise Agency (2019) Mission Zero: powered by Holland, pp. 13-14; see also German targeted EV R&D funding, https://www.bmwi.de/Redaktion/EN/Artikel/Industry/electric-mobility-r-d-funding.html.
88 S. Hall et al. (n.d.) The innovation interface: business model innovation for electric vehicle futures, report funded by Future Cities Catapult, EPSRC and University of Leeds, UK.
6.2.4 Public-Private Vehicles Stakeholder
Public infrastructure will be designed to meet driver needs. EV drivers’ charging needs are considerably influenced by the design and capability of their vehicles, and the purpose of their journeys. For example:
MVehicle battery size
MVehicle on-board charging capacity dictating
how quickly the battery can be charged
will bring together representatives from the car industry and car user groups. These will include groups, tourism groups, HGV representatives and EV and motoring associations. While this group will be focused on the vehicular issues associated
MEV taxi drivers drivers will have different
charging needs to car rental organisatons or car clubs.
This framework for strategy delivery will allow for prompt stakeholder engagement across multiple sectors. Most importantly, it will help to meet the increasing pace of demand for EV charging infrastructure over the coming years.
Launch funding
194,000 EVs on
| 3 | ||||||||
|---|---|---|---|---|---|---|---|---|
2022-25 Infrastructure
delivery
6.3 What’s Been Achieved Since Publication of the Draft Strategy
share knowledge, and to integrate industry and private sector investment with innovation and consumer needs;
Chapter 7 of the Draft EV Charging Infrastructure Strategy identified high-level actions to drive delivery and to stimulate EV infrastructure availability. These fall under three broad areas:
MGovernment funding supports to stimulate
targeted EV charge point rollout, to address gaps in EV provision, and to ensure a comprehensive network for all as the EV market develops.
MPublic sector actions to coordinate the
delivery of infrastructure across all levels of Government and to facilitate the development of a comprehensive mixed-type EV charge point network serving the needs of all citizens;
Several of the initial actions identified have been completed. These are outlined in the tables below. Any actions that have not been completed will be carried through to the implementation plan that will be published along with this strategy.
MIntegrated EV delivery and stakeholder
engagement to leverage existing expertise,
Table 6: Summary of high-level actions
| Public Sector Actions | |
|---|---|
| Objective Support the public sector and local government authorities to deliver EV infrastructure | |
| Action | Expected Results |
| 1. Publish draft Electric Vehicle Charging Infrastructure Strategy and complete public consultation process | M The draft version of the strategy was published in May 2022 and the public consultation process generated 14,000 responses, including stakeholder responses. These informed the final strategy, due to be published in January 2023. M The draft strategy and public consultation process provided greater insight into coordination of EV policy and infrastructure. |
| 2. Establish ZEVI in the Department of Transport by summer 2022 | M The ZEVI office was officially established in July 2022. M The office coordinates provision of EV supports and grants, as well as the delivery of charging infrastructure to support consumers, the public sector, and businesses. All this helps Ireland to continue to make the switch to zero-emission vehicles. M The office undertook a coordinated public information and engagement campaign to address consumer charging concerns and build public knowledge of EVs. |
| 3. Update and publish final Electric Vehicle Charging Infrastructure Strategy before end of 2022 | M This document, the final Electric Vehicle Charging Infrastructure Stategy (reflecting feedback from the public consultation process) will be published in January 2023. |
| 4. Publish detailed Implementation Plan before end of 2022 | M An action plan for EV infrastructure delivery was developed. This will be published in January 2023. |
| Integrated EV Delivery and Stakeholder Engagement | |
|---|---|
| Objectives Coordinate and support EV infrastructure delivery across the EV ecosystem and on a strategic and comprehensive national basis Support private-sector investment and technological innovations to meet consumer needs | |
| Action | Expected Results |
| 5. Establish Public Sector EV Infrastructure Delivery Group (with terms of reference) 6. Establish Public Sector Energy Group (with terms of reference) 7. Establish Public- Private Infrastructure Stakeholder Group (with terms of reference) 8. Establish Public-Private Vehicles Stakeholder Group (Groups established with first workshops convened in October 2022) | M Alignment of EV infrastructure delivery with distribution network development and sectoral coupling (energy and transport) M Increased EV integration with planning |
| 9. Engagement and collaboration with Northern Ireland Executive and UK OZEV - ongoing | M Facilitation of a comprehensive and optimised EV network on both sides of the border. This network will reflect the integrated and all-island nature of the energy sector and transport infrastructure. |
| Government Funding Supports | |
|---|---|
| Objectives Increased provision of targeted EV charging infrastructure for all citizens Incentivise consumer action and stimulate EV demand | |
| Action | Expected Results |
| 10. Introduce requirements for smart charging on all new home charge points from 2023 (Completed September 2022) | M Improved grid resilience and an enhanced consumer experience M Enabling car owners to opt for cheaper electricity through charging at night time (if they opt in for a night meter or a smart meter) |
| 11. Expand the EV Home Charger Grant scheme to include shared parking in apartment blocks by Q2 2022 (Completed September 2022) | M A targeted increase in EV charge point provision to meet home- charging needs where on-street charging is not possible and where EV users don’t have access to driveways |
| 12. Support local authorities in the development of local EV charging networks (Carried forward) 13. Develop new Residential Charging Scheme (Carried forward) | M An increase in the number of local authority publicly-accessible charge points at targeted locations |
| 14. Progress the ‘FASTER’ EV charging project (Ongoing) | M Completion of planned EV charge point rollout programme in border counties |
| 15. Implement a Destination Charge Point Scheme by Q3 2022 (Carried forward) | M Installation of destination charge points in locations such as hotels, visitor centres, and parks. |
A targeted increase in EV charge point provision to meet home-charging needs
where on-street charging is
not possible and where EV
users don’t have access to
driveways
6.4 Overview of Implementation Plan
MCommunications and Reporting: This section
details the reports and communications that ZEVI will be making to the public, to the Government, and to the European Union in relation to the progress being made on expanding the charging infrastructure nationally.
The Electric Vehicle Charging Infrastructure Strategy is accompanied by an Implementation Plan that sets out key actions and deliverables from 2023 to 2025. It includes a comprehensive range of new and expanded measures to support the delivery of electric vehicle charge point infrastructure.
The Implementation Plan will be delivered in collaboration with other stakeholders such as Transport Infrastructure Ireland, the National Transport Authority, the Sustainable Energy Authority of Ireland, ESB Networks, regional assemblies, local authorities, and charge point operators.
ZEVI has a governance programme involving Assurance and Progress Boards, along with the stakeholder delivery groups referenced above. The ZEVI office leadership reports to the Minister for Transport on a regular basis. The Minister will oversee progress on the implementation of the Electric Vehicles Charging Infrastructure Strategy.
As explained in Chapter 1, the strategy and Implementation Plan are part of a comprehensive set of national policies and plans to enhance Ireland’s response to climate change. The milestones in the Implementation Plan align with the respective action plans for these other national plans such the Climate Action Plan.
The Implementation Plan includes actions and deliverables across the following categories:
MNational EV Charging Network Plan: The focus
of this framework is on producing a national EV-charging-infrastructure demand plan and a related demand-supply assessment based on the electricity grid’s readiness to meet projected demand between 2023 and 2025. The framework will provide for the necessary standards, processes, metrics, and governance needed to create a structured process for planning, tracking, and communicating Ireland’s progress under the AFIR regulations.
The outcomes of the Implementation Plan will be supported by complementary actions from other relevant national policies and strategies, and will support delivery of the Climate Action Plan goals.
The Implementation Plan will be reviewed on an annual basis up to 2025 to measure how we are delivering our goals. This will allow us to adopt any lessons learned along the way.
MSchemes: This section contains the planned
deliverables for enabling the charging infrastructure schemes to be installed and go live.
MPolicy & Strategy: This section of the plan
includes deliverables and related milestones for delivering the necessary policies in support of the expansion of the EV charging infrastructure. These policies cover topics such as interoperability, accessibility, measures to improve ease of use for the customer, and governance of the implementation of the AFIR regulations in Ireland.
APPENDIX
A
Personas &
Journeys

Figure from page 70
Key Moments - Caroline, the Car Sharer
Motivation
Caroline is money savvy. She doesn’t want the burden or expense of owning her own car. She prefers to cycle or take public transport where possible, but there are some journeys for which a car is essential. Car sharing is the perfect alternative.
Caroline Connolly
The Car Sharer
Background
Age Location Family Status
Income
Usage
28 Dublin Single Low
Caroline typically relies on cycling or public transport. She uses the car a few times a year - mostly for going out to retail parks, for a weekend away, or for specific circumstances such as moving apartments.
Travel Habits
How Often Does She Travel?
She commutes to work 2-3 times a week and makes shorter local trips on days she works from home.
Support
Caroline needs to be able to get to and from the e-mobility hub easily via public transport. She is not familiar with the charging network, so needs easy-to-find information about where and how to charge.
Journey Purpose
Travelling to work, to meet friends in town, to the shops.
When Does She Travel?
Peak commuting times in the morning and the evening. Lunchtime trips when she works from home.
Activity
As she doesn’t have an at-home charger, she usually charges when out and about. Having destination charging at retail parks is ideal because she can do her shopping while her car charges.
can. It’s cheaper and faster!”
I learned to drive when I lived at home and used my parents’
Concerns
car. But now I try and cycle and take public transport if I
She is worried that she won’t be able to find chargers or use them properly. She also needs to return the car with a full charge, and she will get fined if she doesn’t.
Customer Journey - The Car Sharer
| Planning | The Journey | The Way Home | ||||
|---|---|---|---|---|---|---|
| Moments | Caroline has just moved and needs to move her belongings across the city, from Drumcondra to Kilmainham. She signs up to a car-sharing app so that she can move her belongings and make a trip to the retail park to pick up some new home decor. | Caroline plans to pick up a car in the local e-mobility hub on Saturday morning. This is usually a busy time, so she books in advance to avoid disappointment. | Caroline takes a bus down to the local e-mobility hub and is able to collect her fully-charged car easily. She packs up the car and makes a few trips back and forth from the old apartment to the new apartment. | On Saturday afternoon, Caroline makes a trip to the retail park. She needs to make sure that the car has enough charge in it to avoid a fine when she returns to the hub. | Caroline isn’t familiar with EV charging services. She checks online and reserves a fast charger in the retail park. She charges the car while she does her shopping. | Caroline brings the car back to the e-mobility hub and takes the bus home. |
| Highs and Lows | Excited to move apartment | Relieved to have booked a car | Tired | Anxious about not finding a charger | Relieved that she could find the information she needed | |
| Considera i tons | How might we encourage people to consider e-car sharing as a viable alternative to owning a car? | How might we meet the demand for car sharing at weekends? | How might we ensure that e-mobility hubs are easily- accessible by public transport or active mobility? | How might we support users to find charging facilities so that they don’t risk facing a fine upon returning the car? | How might we provide accessible information about EV charging to infrequent users? |

Figure from page 72
Key Moments - Tara, the Taxi Driver
Motivation
Tara has an at-home charger installed so that she always has a reliable place to charge. Having a full charge at the start of the night is essential.
Tara Traynor
The Taxi Driver
Background
Age Location Family Status
Usage
55 Skibbereen,
Married,
Cork
3 kids
On a busy night out, Tara might need to quickly top up her charge and wants to be able to do so between bookings.
Travel Habits
How Often Does She Travel?
Daily for work.
Support
Journey Purpose
She needs access to a dedicated fast charger that will give her the boost she needs to make it to the end of the night.
Providing taxi journeys.
When Does She Travel?
Tries to work during the day, but at busy periods she picks up a few night shifts.
Activity
Tara drives for work, and needs to take a break to rest, if possible, between bookings. She needs to have safe facilities to grab some food or take some calls.
the trip.”
I don’t want to let anyone down because I don’t have enough charge in my car to do
Concerns
She is worried about being stranded in a remote area with unhappy passengers. On any given night, she never knows what delays might come up or how long she’ll be out for.
Customer Experience – The Taxi Driver
| Planning | The First Journey - Going Out | The Second Journey - Coming Home | |||
|---|---|---|---|---|---|
| Moments | It’s Saturday afternoon and Tara has been busy on the phone taking bookings for the evening. People rely on her taxi service to go out at night and to get home. There are quite a few long trips ahead: on a typical night she could be driving almost 200 km between the bigger towns and villages. Tara has a home charger installed in her driveway. | It’s 7 pm, and she starts her evening off in Skibbereen. Firstly, she heads to Schull where she has a few pre- bookings. After Schull, she heads to Baltimore, Castletownshend, and Glandore. It’s a big night out in Skibbereen so she has multiple big trips to do between Skibbereen and the surrounding areas. | It’s already 11 pm, the time when there is a momentary lull before it’s home time for all the people she brought out. She’s been driving for almost 4 hours and needs to top up her charge. There’s a small mobility hub outside of Skibbereen. There is a dedicated taxi charger, so she can take a break for 20 minutes and top up her charge. | She feels confident now that she will have enough charge in her car to complete all her bookings. She heads back into Skibbereen and brings home everyone who was out that night. | Once she has finished up in Skibbereen, she gets a last-minute passenger looking to go to Bantry. She brings them there as the last trip of the evening. After all the pre- bookings, as well as the last-minute ones, she manages to get home to Skibbereen at 2 am. |
| Highs and Lows | Prepared for the night ahead | Looking forward to the evening ahead | Anxious about how much charge is left in the car | Restless that it’s only halfway through the night | Relieved she’s been able to complete all her trips |
| Considera i tons | How might we assist taxi drivers to install home chargers if there are no other alternatives in the local area? | How might we encourage people to pre-book taxis and share taxis with neighbours in rural areas? | How might we ensure that taxi drivers have dedicated access to chargers at busy periods? | How might we support taxi drivers to be able take all the bookings they need to without worrying about their charge? |

Figure from page 74
Key Moments – Ruairí, the Rural Commuter
Motivation
Ruairí typically commutes by bus to Dublin for work. Occasionally, he needs to get home early to be able to bring his daughter to camogie training. On those days, he drives to make sure he will get home on time.
Ruairí Reynolds
The Rural Commuter
Background
Age Location Family Status
Income
Usage
33 Virginia,
Single Dad, 1 daughter
Cavan
He usually drives to work twice a week and either works from home or takes the bus on days where he doesn’t need to be home early.
Travel Habits
How Often Does He Travel?
Daily, usually at peak travel times.
Support
Journey Purpose
Ruairí has a second-hand EV and is worried about the range. His commute is quite long, so he is worried he won’t have enough charge if there are diversions along the route or he has to do extra trips after work.
Work, shops, childcare.
When Does He Travel?
Usually at peak travel times in the morning and the evening.
Activity
the car.”
Destination charging is really important to Ruairí. He spends enough time on the road and doesn’t want to spend extra time away from home while waiting for his car to charge.
My commute is quite long but I want to be there for my
daughter after work and not have to worry about charging
Concerns
He is worried about not being around in the evenings for his daughter and running out of charge on his commute.
Customer Journey - The Rural Commuter
| Leaving in the Morning | Arriving to Work | On the Way Home | ||||
|---|---|---|---|---|---|---|
| Moments | Today, Ruairí is driving to work in Dublin. He has decided to take the car so that he can make it back in time to bring his daughter to camogie training this evening. He charged his car overnight, so is happy to get into a fully-charged car to make his trip to Dublin (which will be around 200 km in total). | There is a lot of traffic on the road this morning, so he ends up taking a diversion which ends up being quite long. He usually has about 250 km range in his car. | To make sure that he has enough charge to make the commute home, Ruairí usually books a charger in work. Today, however, he ends up leaving it too late and misses his spot. | Ruairí is in meetings all day and doesn’t have time to figure out a plan to top up the charge on his car. | Ruairí jumps in the car to drive home and remembers he needed to top up his charge. He will have enough to get home but is worried about getting back from the training pitch. He remembers that the local GAA club has installed a charger on the grounds. He picks up his daughter and is able to park and help out at the training session while the car charges. | |
| Highs and Lows | Relieved to have a home charger installed | Stressed about the extra distance he has to drive | Anxious because there isn’t an available charger, and he doesn’t have time to find an alternative | Frazzled at work | Anxious about making it home and getting to training | Elated that there’s a charger at the local pitch 3 |
| Considera i tons | How might we support those with range anxiety to have access to chargers either at home or close to home? | How might we ensure that diversions due to traffic don’t disrupt travel plans for those with limited range? | How might we provide additional alternatives to those who don’t get to use destination charging facilities? | How might we share information about alternative charging options in local areas? | How might we give guidance and support to those who may need to disrupt their travel plans in order to charge en route? | How might we encourage local sports clubs in rural areas to install EV chargers? |

Figure from page 76
Key Moments – Anna, the Apartment Dweller
Motivation
Growing up in a rural area, Anna has always wanted to be independent in her travel. She recently purchased her first EV so that she can visit her family home in the countryside or go for spontaneous trips with friends.
Anna Abbott
The Apartment Dweller (Shared Parking)
Background
Usage
Age Location Family Status
Income
Anna lives in a residential development with shared parking facilities. Anna usually only uses her car at the weekend or for trips after work to the supermarket.
27 Galway
Single, no kids
Medium
City
Travel Habits
Support
How Often Does She Travel?
The apartment management company for Anna’s apartment block installed EV chargers for the residents. Anna needs to have reliable access to the chargers. In addition, she needs to have a reliable booking system that she can access.
Daily, walking to work usually.
Journey Purpose
Work, shops, visiting friends, weekend activities.
When Does She Travel?
Usually peak travel times in the morning and the evening. Weekends out to the countryside.
Activity
As most of Anna’s trips are at the weekend or are spontaneous, Anna likes to avail of athome charging so that she isn’t wasting her limited travel time at a forecourt, waiting for the car to charge.
I can do what I need to do.”
I don’t use my car every day, but when I do need to, I want to have a good charge on it so
Concerns
Anna is worried about having to queue excessively, as there are limited chargers in her apartment complex. There are some residents who hog the chargers, which seem to always be in use.
Customer Journey - The Apartment Dweller
| Saturday Morning | Saturday Afternoon | Saturday Evening | ||||
|---|---|---|---|---|---|---|
| Moments | Anna needs to go to lunch with family in Ballinrobe. It’s about a 100 km roundtrip. Anna’s parents don’t have an at-home charger, so she needs to make sure she has a full charge before she leaves. | The chargers in the apartment block have been booked up over the last few evenings so Anna hasn’t had the chance to fully charge her car this week. | She has a half charge in the car, so she decides to leave early so that she can charge in the forecourt on her way. It’s a fast charger, so it’s a bit more expensive than what she’s used to paying. | She is waiting for about 30 minutes to charge. There are restaurants and shops at the forecourt, so she manages to get some breakfast and pick up a dessert for the family lunch. | She arrives at her parents’ house and spends a lovely evening with the family. Before she leaves, she remembers to book a charging slot in the apartment block. There will be a free charger for her when she gets home. | She heads back home that evening and the charging spot she booked is free to use at last. She’ll now have a full charge and be ready for the next spontaneous trip. |
| Highs and Lows | Excited to spend time with the family | Annoyed that she never gets to use the charger in the apartment block 7 | Frustrated that she always has to look for another charger | Patient while she gets some food | Organised and prepared to get a charger when she gets home | Relieved to see the charger she booked is free |
| Considera i tons | How might we assist people to charge their EVs before taking a long journey? | How might we discourage users from hogging chargers and overcharging? | How might we support those who have to pay extra to use en-route charging in an emergency? | How might we provide facilities at en- route forecourts so that the wait is comfortable and pleasant? | How might we remind users to book chargers based on their charging habits? |

Figure from page 78
Key Moments – Mike, the HGV Driver
Motivation
Mike drives a HGV for work. At night, it’s parked up in a depot, so he doesn’t have to worry about charging it overnight.
Mike Murphy
The HGV Driver
Background
Usage
Age Location Family Status
Income
He drives most days to make deliveries. He uses the motorway network across the country. His HGV charges overnight at a depot, but on longer days he uses en-route charging to top up his charge.
52 Waterford Married, 3
Medium
grown-up
children
Travel Habits
Support
How Often Does He Travel?
Every day during the working week.
Mike needs suitable charging facilities to be located beside rest facilities. As a HGV driver, he is under time pressure and he wants to make sure he can rest and charge at the same time. This stops his journey from becoming unnecessarily long.
Journey Purpose
To deliver goods across the country.
When Does He Travel?
Peak travel times.
Activity
At charging stations, Mike would like to be able to take a break, rest, and eat while he tops up the charge on his lorry.
can charge up too.”
I usually have to stop and rest
while on the road anyway, so it would be great to have good
Concerns
Mike is concerned about his journey becoming longer if he has to take time to charge and then take time to rest. He wants to be able to do both simultaneously.
facilities at forecourts where I
Customer Journey – The HGV Driver
| Leaving in the morning | Arriving to Work | On the Way Home | ||||
|---|---|---|---|---|---|---|
| Moments | Mike collects his lorry from the HGV depot outside Waterford. It has been charging overnight there so he is able to get in and set off for the day. | After heading to the port to collect his load, he finds out he is driving to Galway this morning. He is under a tight deadline, and only has 4 hours to get there. | It’s lunchtime, and he’d like to stop and rest for a while. He would also like to try to top up the charge on his lorry while he takes a break for lunch so that he doesn’t have to worry about it later. | He stops in a forecourt just off the motorway. There are dedicated chargers for HGVs, so he parks and charges for an hour while he gets lunch. This is his usual spot for charging and eating lunch. | He gets back on the motorway and manages to make his delivery in Galway on time. Leaving early and avoiding rush hour makes all the difference. | He leaves the lorry in the depot in Galway to charge overnight. He is staying overnight in the city, so he’ll come back and collect it in the morning to make another trip home tomorrow. |
| Highs and Lows | Ready for the day ahead | Anxious to get on the road early | Getting tired before lunch | Rested and on the home stretch | Confident he’ll finish his journey on time | Happy to finish driving for the day |
| Considera i tons | How might we ensure that charging requirements don’t unnecessarily delay HGV drivers who are working to tight deadlines? | How might we design forecourts in a way that gives HGV drivers access to dedicated HGV chargers and spaces to rest? | How might we reward HGV drivers who frequently stop at the same forecourts for rest and charging? |

Figure from page 80
Rachel, the Retired Urban Dweller
Motivation
Rachel has an EV that she uses for small trips around town. She mainly goes to the shops, to visit family, and to medical appointments. She doesn’t have a driveway, so she relies on neighbourhood or destination charging.
Rachel Reynolds
The Retired Urban Dweller
Background
Usage
Age Location Family Status
67 Clonmel Widowed,
Rachel needs to use chargers which meet her accessibility requirements. For example, there needs to be space around the car so that she can move comfortably with her wheelchair.
2 grownup sons
Travel Habits
How Often Does She Travel?
Support
Once or twice a week.
Journey Purpose
Being shown how to use an EV charging app and the chargers is important to helping Rachel retain her independence while travelling. She also needs adequate signage to find the appropriate spots.
Going to the shops and doctor’s appointments.
When Does She Travel?
Early afternoons.
Activity
If the neighbourhood charger isn’t available, Rachel usually charges at her destination - whether it’s at the doctor’s office or the supermarket.
Concerns
It’s so frustrating when I can’t
tell if the charge point will be accessible when I get there – it
She is worried about not knowing how much charge is left in her car. As well as this, she gets anxious about not knowing what to expect when she gets to a charger: will there be an accessible spot and will there be enough signage to help her find it?
makes me anxious about my
Customer Journey – The Retired Urban Dweller
| Planning | Charging | The Way Home | |||||
|---|---|---|---|---|---|---|---|
| Moments | Rachel has to go to a doctor’s appointment in town. It’s a 15-minute drive to the other side of town. | Rachel doesn’t drive very often, so she tries not to hog the on-street charger. However, she is sometimes left not knowing how much charge is in her car before she gets in. | She’s running late and realises she might only have enough charge to get to the doctor’s. She needs to top up her charge either on the way or at the doctor’s office. | There is an easy-to-use app where she has already loaded her charging preferences - she needs an accessible spot and a fast charger beside the doctor’s office. There is a picture of the EV charger available, so she knows what to expect when she arrives. She reserves the spot. | She’s nervous that she won’t be able to find the spot. She has never parked there before so is on the lookout for signs. | She arrives to the doctor’s practice and there is a sign to direct her to the EV chargers. The charger is what she expected to see. She plugs in her car to the fast charger. | Rachel heads in to see the doctor and when she comes out her car has plenty of charge to take her home. |
| Highs and Lows | Confident that she knows where she’s going 3 | Anxious about how much charge is left in her car. | Nervous about her range | Reassured that there’s an app to book a spot | Worried she won’t be able to find the spot | Relieved to be able to find the charger and make her appointment on time | Happy that she was able to access the right charger 3 |
| Considera i tons | How might we help infrequent drivers to know how much charge they need based on their travel habits? | How might we support drivers who are not able to access their first choice of charger? | How might we provide accessible chargers and information to those who need it? How might we support those who are unfamiliar with EV chargers to confidently use and book spaces? | How might we provide appropriate signage for EV chargers? |

Figure from page 82
Key Moments - The Jacksons, Tourist Family
Motivation
John and his wife Janet are very conscious of the environment and the impact they have. However, having two small kids can sometimes make it difficult to choose the most sustainable option. Convenience now has to come first.
The Jacksons
The Tourist Family
Background
Age Location Family Status
Income
Usage
42 Portland,
Married,
Oregon
2 kids
Driving around the Wild Atlantic Way for 10 days. They are going to see different scenic routes and spots along the way.
Travel Habits
How Often Do They Travel?
Support
They are driving every day during their trip.
The Jackson Family need a convenient way to find out where different chargers are and to pay for charging.
Journey Purpose
Travelling to scenic sites, to local towns, and to their accommodation.
When Do They Travel?
Activity
Throughout the day, but mostly in the morning.
When charging, they want to be able to occupy the kids so that they don’t get bored and restless. They prefer to either charge at night at the hotel or while on to go at a tourist attraction or restaurant.
kids in tow, a car is essential.” Ireland as a family. With two
Concerns
We have always wanted to camp along the west coast of
They aren’t too familiar with the system here, so they are worried about not being able to find a charger if their first choice isn’t available.
Customer Journey - The Tourist Family
| Planning | The Journey | Charging | |||||
|---|---|---|---|---|---|---|---|
| Moments | In advance of their trip, John looks online to figure out the best route, as well as the best places to charge along the Wild Atlantic Way. | When booking the hotels along the route, John makes sure to check that there is overnight charging available. | For longer legs of their journey, John maps out the distance they plan on driving, and where they might need to stop to charge. He looks up the services and facilities available at the charging points. | John and his family are driving the longest part of their trip today, from Clare to Kerry. There wasn’t an available charging space in the hotel, so they decide to make a stop on the way to charge. | They have enough charge to get to the next town. They look online to see what types of chargers are available and book a slot to avoid disappointment. | They easily find the charger in the local village. There were plenty of signs and it was located close to all the services they needed. | John parks his car for 2 hours while it charges, and the family enjoy lunch and some playtime in the local playground. |
| Highs and Lows | Pleased that he has planned the family trip in advance | Disappointed that the charger he wanted to use wasn’t available 7 | Anxious about how he will occupy the children | Relieved that there was an alternative | |||
| Considera i tons | How might we help tourists who are coming to Ireland to prepare for their journey so that it is as seamless as possible? | How might we best support hotels and local communities to install chargers in areas where there is an influx of tourists only during busy seasons? | How might we provide information to customers to ensure that they choose the right charger location for their needs? | How might we best support customers when there isn’t charging available at their destination? | How might we assist customers to adapt their travel plans based on their EV charging needs? | How might we design wayfinding solutions so that people can easily find EV chargers? | How might we best utilise the amenities in local villages and towns to support destination charging? |
APPENDIX
B
EV Basics
What is an EV Charge Point?
At its simplest, an electric vehicle charging point is a piece of interface equipment that connects a single electric vehicle to an electricity supply, allowing the vehicle’s battery to be charged89. This battery provides the power to propel the vehicle, which can be fully electric or a plug-in hybrid90. The term ‘charge point’ is often used interchangeably with ‘charging point’.
Charging points can be stand-alone interfaces (as is the case with most home charge points) or can be arranged in various combinations or clusters at particular locations. These combined charging points form hubs where more than one electric vehicle can charge at a time.
the electricity supplied to the charge point can be drawn from conventional domestic supply arrangements, or whether a higher connective capacity is required.
How Does EV Charging Work?
To charge an EV, the vehicle is parked and attached to the charging point connection or socket by a charge point cable.
Most publicly-accessible EV charging points consist of a single parking bay and an adjacent electricity connection point. Where more than one charging point is provided, multiple connection points can be grouped together in single charging stations. This reduces the cabling and hardware required to connect the charge point to the electricity supply and is an efficient way of allowing more than one vehicle to charge at a time. A common arrangement is to have two twinned sockets set in a single charging station, serving two side-by-side or back-to-back parking bays.
EV charge points generally fall into two categories: standard charging and fast charging, otherwise known as AC and DC charging.
Figure B1: AC vs DC charging
AC Electricity Grid
AC
When EV technologies were at an early stage, different manufacturers developed different types of connection points and sockets. This meant that vehicle owners had limited options when it came to where and how they could charge their EVs. As the EV market has developed, standard, interoperable connection points have become more common, particularly in the EU91.
DC Fast Charger AC Charger
Load
DC AC
DC
Junction Box
On-Board Charger
With more standardised connection points and charge point sockets, EV charging is now mainly differentiated by power and vehicle battery capacity. Another key factor is whether
Electric Vehicle Battery Pack
89 https://www.seai.ie/technologies/electric-vehicles/what-is-an-electric-vehicle/, accessed 09/02/2022.
90 The EU’s Alternative Fuels Infrastructure Directive (2014/94/EU; currently in force and undergoing revision) expands this definition to also include an interface that is capable of ‘exchanging a battery of one electric vehicle at a time’, i.e. battery-swap technology. This battery-swap charging point is not currently included in this strategy. This may change in future iterations of the strategy as battery swap technology becomes more widely available and more commercially feasible. Electric vehicles are also defined as set out in the Alternative Fuels Infrastructure Directive.
91 Annex II of the Alternative Fuels Infrastructure Directive requires that normal-power and high-power AC recharging points be supplied with socket outlets or vehicle connectors of Type 2 as described in standard EN 62196-2:2017. Direct current high-power charging points are to be equipped with connectors of the combined charging system ‘Combo 2’ as described in standard EN 62196-3:2014; see also ECA (2021) Infrastructure for charging electric vehicles, special report, p. 24.
Alternating Current (AC)
Table B1. Currently-Available Vehicle-Charging Technology
AC charging is associated with slower speeds of EV charging. There are two types of AC charging: single phase and three phase. When charging, AC electricity is supplied by the charge point to the vehicle. The onboard charger on the vehicle detects the maximum power available from the charge point. The vehicle converts this AC power into DC power and manages the charging of each cell in the vehicle’s battery pack.
| Charge Point Speed and Type | Power Rating | Time to charge for a 300kM journey |
|---|---|---|
| Home (single-phase AC) | 3-7 kW | 7-16 hours |
| Standard (three-phase AC) | 11-22 kW | 2-4 hours |
| Fast (DC) | Up to 50 kW | 70 minutes |
| High-powered (DC) | > 50 kW | 70 minutes or less |
Direct Current (DC)
DC charging is largely associated with faster speeds of charging. DC charging can quickly charge the battery pack of the vehicle. In this case, the DC charge point converts AC electricity into DC electricity which it supplies to the vehicle. This is channelled directly to the battery.
*Also depends on the vehicle’s charging capability, the state of charge at commencement of charge, and other factors such as the battery pack and ambient temperatures, and driving behaviors.
The process is controlled and managed via the vehicle’s battery management system. This communicates with the DC charger via the connecting cable and tells the charger how much power to supply at any given point during the process. It also controls the start and stop of the charging process.
The power level (in kW) of a charge point indicates the maximum amount of energy which could be supplied to a battery pack over the course of one hour. The actual amount of energy transferred to the battery will depend on factors such as the battery’s internal resistance, the maximum rate that the pack can sustain at the

Figure from page 86
given charge level on commencement of charge, the battery cooling system, etc. Also, with top-up charging (particularly when using higher-powered fast charge points), EV users often do not need to fully charge their EVs. Instead, they can plug in and charge the battery just enough to get them to their destinations92.
the most effective types of charge points are the lower wattage 7 kW-11 kW charge points that work best over longer charging timeframes, such as overnight. AC charge points also tend to be more compact in size, meaning that they fit better in domestic contexts where space for charging infrastructure may be limited.
AC electricity can be used by all speeds of charge points, while DC electricity can only be used by fast or high-powered charge points. In most residential areas, single-phase AC electrical power supplies are most common, as this type of supply system is suited to relatively low electrical loads (such as lighting and heating), with a few large electric motors. For larger industrial or commercial buildings, a higher-power three-phase AC system is often used. The type of available AC supply determines the type of charge point that can be installed, as charge points that supply electricity significantly above 7 kW (such as 11 kW to 22 kW) generally require a three-phase AC supply93.
Types of Connectors
EVs also have different types of connectors for different speeds of charge94, and can only be plugged in to charge points with the same type of connector unless an adaptor is used.
Type 2 connectors: For AC charging (standard/ fast), European EVs typically use a Type 2 connector. Type 2 connector technologies are more common in newer EVs, and the use of this charge point type has been supported as a way to achieve standardised, interoperable charging across the EU.
Additionally, most electric cars currently on the market are either unable to accommodate more than c. 7 kW on a single-phase AC supply, or (if they can take higher AC charges of up to 11 kW) have been designed so that if a single-phase AC electricity supply is involved, they will not charge above 7 kW. This means that in residential areas,
Combined Charging Standard (CCS) or CHAdeMO connector types: Some charging stations contain more than one connector type (e.g. both CCS and CHAdeMO), allowing the charging of a range of different EV models. In practice, this means that most EVs will be able to use most publicly-accessible charge points.
Figure B2: Typical European connectors
TYPE 2 / AC 43 Type 2 is the connector found at all standard chargers. The AC43 connector is used to charge EVs such as the Renault Zoe.
CCS COMBO This connector is used to charge most other vehicles, including BMW, Volkswagen, Hyundai, etc.
DC CHAdeMO This connector is used to charge Nissan Leaf and Mitsubishi vehicles.
92 For example, instead of using a fast charge point to fully charge the battery in c. 50 minutes, it might be enough to charge up to 80% in maybe 30-40 minutes. The speed and level of charge varies from EV model to EV model, but an average new EV would generally take c. an hour to charge on a 50 kW fast charge point. Electric Ireland suggest that ‘For a 40 kW battery, a typical 7 kW home charging station will charge an electric car from 0-100% over the course of around 3-5 hours’.
93 https://www.ukfrs.com/promos/17145, accessed 09/03/2022. https://www.smarthomecharge.co.uk/guides/22kw-three-phase-charging-is-itworth-it/, accessed 09/03/2022. https://www.which.co.uk/news/2021/03/5-problems-with-electric-car-charging-and-how-to-fix-them/, accessed 09/03/2022.
94 Gov. UK (2021) Electric vehicle charging market study: final report, p. 20