Front Matter
Electric Vehicle Charging Infrastructure Strategy 2022-2025
Electric Vehicle Charging Infrastructure Strategy 2022-2025
ZEVI, Department of transport
Table of Contents
Acronyms and Definitions 4
Minister’s Foreword 8
Introduction 9

Figure from page 4
4.1 Innovating for the Future: EV Charging for Local Conditions and Diverse User Needs
33
4.2 Case Studies 33
4.2.1 Case Study 1: On-Street Kerbside Charge Points in European Cities
4.2.2 Case Study 2: Vehicle-to-Grid Charging System in Oslo Car Park
4.2.3 Case Study 3: Wireless Charging in Rotterdam 38
4.2.4 Case Study 4: Planning for Dublin’s EV Needs: The Dublin Local Authority EV Infrastructure Strategy
39
4.2.5 Case Study 5: Rural EV Infrastructure and Innovation: The Dingle Project 40
4.2.6 Case Study 6: Fingal County ‘e-Mobility Hubs’ 41
4.2.7 Case Study 7: En-Route High-Power Charging and Charging Pools in Ireland
42
| Delivering Infrastructure | 43 |
|---|---|
| 5.1 Infrastructure Designed for Users 44 | |
| 5.2 What Will Be Delivered 44 | |
| 5.3 Risks and Dependencies 44 | |
| 5.4. EV Infrastructure Standards 46 | |
| 5.5 National Publicly-Accessible Infrastructure Targets 47 | |
| 5.6 Existing Exchequer Supports for Charging Infrastructure 48 | |
| 5.6.1 Home Charging 48 | |
| 5.6.2 Residential/Neighbourhood Charging 48 | |
| 5.6.3 Top-Up Charging (Destination and En-Route) 50 | |
| 5.7 New Infrastructure Supports to Deliver for User Needs: 50 | |
| 5.7.1 Home Charging/Shared Charging 50 | |
| 5.7.2 Residential Charging 51 | |
| 5.7.3 Destination Charging 51 | |
| 5.8 En-Route Charging Network 52 | |
| 5.9 Heavy-Duty Vehicle Charging Hubs 54 | |
| Implementation | 56 |
| 6.1 Governmental and Collaborative Structures 57 | |
| 6.2 Zero Emission Vehicles Ireland (ZEVI) 57 | |
| 6.2.1 Public Sector Energy Delivery Group 58 | |
| 6.2.2 Public Sector EV Infrastructure Delivery Group 58 | |
| 6.2.3 Public-Private Infrastructure Stakeholder Group 58 | |
| 6.2.4 Public-Private Vehicles Stakeholder Group 60 | |
| 6.3 What’s Been Achieved Since Publication of the Draft Strategy 62 | |
| 6.4 Overview of Implementation Plan 66 | |
| Appendix A Personas & Journeys | 67 |
| Appendix B EV Basics | 82 |
Pages 1–5 · View in original PDF