Dublin Metropolitan Area Strategic Plan
Swords
Dublin City
Bray

TABLE 5.1 Strategic Development Areas and Corridors, Capacity Infrastructure and Phasing
Regional Spatial & Economic Strategy
| TABLE 5.1 Strategic Development Areas and Corridors, Capacity Infrastructure and Phasing | |||
|---|---|---|---|
| Corridor | Residential | Employment/ Mixed Use | Phasing/Enabling infrastructure |
| City Centre within the M50 (Multi-modal) Population capacity Short 35,000 Medium 10,000 Long 15,000 Total 60,000 | Docklands build out of North Lotts and Grand Canal Docks with further physical and social regeneration of Poolbeg and northeast inner-city lands | Further development of people intensive high tech and services- based business districts in Docklands and Poolbeg | Short to Medium term Dodder bridge, LUAS extension to Poolbeg, local and wider area water upgrades, waste water upgrades and district heating |
| City centre regeneration of older social housing projects (former PPPs), Parkwest-Cherry Orchard, Ballymun, Ashtown-Pelletstown and St James – Heuston lands | Regeneration of Diageo lands, health and education related employment at St James and Grangegorman campus | Short to Medium term Waste water upgrades, social infrastructure Long term Long term capacity supported by DART underground | |
| Naas Road /Ballymount – significant brownfield lands in South Dublin and Dublin City Council areas, with potential for residential development and more intensive employment/ mixed uses | Re-intensification of underutilised lands including Naas road and older industrial estates, subject to feasibility study | Medium to Long term Multi-modal public transport, new Luas stop, site assembly, waste water upgrades and local area water network upgrades | |
| Dunsink – major greenfield landbank with long term potential to develop a new district centre | Subject to feasibility | Long term LUAS extension to Finglas, access, site conditions, feasibility | |
| North-South corridor (DART) Population capacity Short 31,000 Medium 13,000 Long 7,000 Total 51,000 | North Fringe – large scale urban expansion creating new communities at Clongriffin-Belmayne (Dublin City) and Baldoyle-Stapolin (Fingal) | Completion of mixed-use districts with retail and service provision | Short to Medium term Access to rail station, bus upgrades, new road connections, drainage, parks and social infrastructure |
| Donabate – significant residential capacity in this strategically located rapidly growing coastal village | Consolidation of economic and service base in tandem with population growth | Short term DART expansion, distributor road and railway bridge, social infrastructure, local area water network and storage upgrades | |
| South County Dublin - North Wicklow – development of new residential communities at Woodbrook- Shanganagh and Bray Golf course and Harbour lands | Strengthening commercial town functions in Bray, developing IDA strategic site in Greystones to strengthen economic base in North Wicklow | Short term Access road, new station at Woodbrook - Shanganagh. Access to Bray station and PT bridge. | |
| Bray Fassaroe* – westward extension of Bray at Old Connaught- Fassaroe (Dún Laoghaire) and Bray -Fassaroe (Wicklow) lands | New mixed use residential and employment district at Fassaroe, west of Bray Greystones Strategic site | Short to Medium term High capacity bus between Bray and Fassaroe, distributor road, N/ M11 upgrades, new bridge to Old Conna. Waste water upgrades. Local and wider area water network and storage upgrades Long term LUAS extension to Bray |

Figure from page 105
Dublin Metropolitan Area Strategic Plan (MASP)
| Corridor | Residential | Employment/ Mixed Use | Phasing/Enabling infrastructure |
|---|---|---|---|
| North-West corridor (Maynooth/ Dunboyne commuter line /DART) Population capacity Short 24,000 Medium 10,000 Long 3,000 Total 37,000 | Dublin 15 lands – continued development of Hansfield linked to the future development of Barnhill and Kellytown landbanks to the south and east | Further development of large- scale employment in Dublin Enterprise Zone** and synergies with Blanchardstown IT | Short term Public transport, Clonsilla Station, water network and waste water upgrades. |
| Leixlip – strategic greenfield lands near Confey station with capacity for phased development, improve links to Leixlip and adjoining Dublin/Meath lands | Large scale former Hewlett Packard site and Collinstown site to strengthen employment base for North Kildare | Short to Medium term LUAS extension to Maynooth, roads upgrades, community and social infrastructure, waste water and local water network upgrades | |
| Maynooth – Significant strategic residential capacity at Railpark lands and to the north and west of the town near Maynooth University | New Research & technology Park adjoining Maynooth University | Short to Medium term DART expansion, road upgrades, bridge, Maynooth Outer Orbital Route, waste water and local water network upgrades | |
| Dunboyne – Sequential development prioritising zoned and serviced lands near the railway station and town centre and at Dunboyne North / M3 Parkway station | Space intensive ‘big box’ employment at Portan. Mixed use ‘live - work’ development at Dunboyne North | Medium to Long term Outer Orbital road, distributor road, additional watermains and waste water upgrades | |
| South western corridor (Kildare line/ DART and LUAS redline) Population capacity Short 45,000 Medium 21,000 Total 66,000 | Western suburbs - Continued development of Adamstown SDZ and the phased development of Clonburris located strategically between the west Dublin suburbs of Lucan and Clondalkin. New residential community at Kilcarbery near Clondalkin. | Promotion of high tech, manufacturing and research and development in Grange Castle Business Park | Short to Medium term New roads and railway bridge, new rail station, DART expansion to Celbridge- Hazelhatch (Adamstown, Clonburris) Access road and waste water upgrades (Kilcarbery). Public transport and access (Grange Castle). New water network infrastructure to supply Clonburris SDZ and local network upgrades |
| LUAS red line - Regeneration of brownfield lands in Tallaght. New district at Fortunestown near emerging town of Saggart/Citywest | Re-intensification of older industrial estates at Naas Road/ Ballymount, Intensification of industrial lands and mixed- use development at Tallaght Town Centre/Cookstown | Short to Medium term Brownfield conditions and site assembly waste water upgrades and Citywest junction link at Tallaght/Fortunestown | |
| Metrolink / LUAS Greenline Corridor (Metrolink/ LUAS) Population capacity Short 28,000 Medium 25,000 Long 18,000 Total 71,000 | Dún Laoghaire - Rathdown – New and emerging mixed-use districts of Cherrywood and Sandyford. New residential communities in Ballyogan and environs and Kiltiernan-Glenamuck | Continued development of high-density business districts at Cherrywood and Sandyford. New mixed use centres in Ballyogan and Kiltiernan | Short to Medium term LUAS green line upgrades. Public transport and roads upgrades. New road and bridge and N11 junction (Cherrywood) and water upgrades |
| Swords – sequential development of strategic residential sites within Swords and development of Oldtown-Mooretown lands | Airport related, commercial facilities and employment linked to development of Metrolink | Short to Medium term Public realm, pedestrian and cyclist provision. Road improvements, BusConnects. Additional runway and improved access (Airport). Waste water upgrades. Local and wider area water network upgrades | |
| Swords – Lissenhall – new mixed-use urban district on the northern side of Swords linked to delivery of Metrolink | Development of high-tech research and development employment within a campus setting at Lissenhall East | Medium to Long term Improved bus connections, Metrolink, roads improvements and expanded internal road network and waste water upgrades |
*Development at Fassaroe will be undertaken in collaboration between Wicklow County Council, Dún Laoghaire-Rathdown County Council and the transport agencies **Dublin Enterprise Zone is not directly served by existing or planned rail and will require improve bus connections and demand management measures

Figure from page 106
Regional Spatial & Economic Strategy
Pages 103–106 · View in original PDF