14.1.2Weekly .1The proper operation of the DSC facilities shall be tested at least once each week by means of

a test call, when within communication range of a coast radio station fitted with DSC equipment. .2Where a ship has been out of communication range of a coast radio station fitted with DSC

equipment for a period of longer than one week, a test call shall be made on the first occasion that the ship is within communication range of such a coast radio station.

14.1.3Monthly .1Each EPIRB and satellite EPIRB shall be tested at least once each month to determine its

capability to operate properly using the means provided on the device and without using the satellite system. .2Each search and rescue radar transponder shall be checked at least once each month for

security and signs of damage. .3Each survival craft two-way VHF equipment shall be tested at least once each month on a

frequency other than 156.800 MHz (VHF channel 16). .4A check shall be made at least once each month on the security and condition of all batteries

providing a source of energy for any part of a radio installation. The battery connections and compartment shall also be checked.

ANNEX 4 – RADIO LOG

(Referred to in Chapter 9)

.1The following shall be recorded in the Radio Log:

a.the time and source of each communication relating to distress, urgency and safety

traffic and a summary of its contents; b.the occurrence and approximate time of important service incidents; and

c.the position of the vessel at, at least, one given time each day. .2The recording shall be made during or as soon as practicable after the event concerned.

ANNEX 5 - ANCHORS AND CABLES

(Referred to in Chapter 4)

Table of Requirements

LxBxDTotal weight of Anchors (kg)Number of AnchorsLength of cable(m)Diameter of chain (mm)Diameter of rope (mm)
Minimum Chain (m)Total Length (m)
1091425510
15121530512
20141630615
25171735615
35201835818
50241940818
702921045820
9033212501020
11036215551025
15042220601025
20048225651230
25054230701235
30060235751240
35065240801240

Notes

L = Length overall in metres

B = Beam in Metres (Maximum -Outside planking or plating)

D = Depth in Metres (Maximum -Deck at side to top of keel)

Example:

GRP Potter:- L = 11.34 m; Beam = 4.08 m; Depth = 2.12 m

11.34 x 4.08 x 2.12 = 98.08;

Therefore, using Table, requirement is Total anchor weight of 34 kg (1 anchor 20 kg and 1 anchor 14 kg).

Minimum length of anchor chain 15 metres of 10 mm dia, plus 38 metres of 25 mm dia nylon rope. Length of anchor cable is subject to depth of water.

Chain cable diameter is given for short link chain. Chain cable should be sized in accordance with EN 24/565:1989 (Covering I.S.O. 4565:1986 and covered by BS 7160:1990 Anchor chains for Small Craft) or equivalent.

(iii) The rope diameter given is for nylon construction, when rope of differing construction is provided, the breaking load should not be less than that of the nylon rope specified in the table.

(iv) Where stud link chain cable is used, the diameter may be 1.5 mm less than the tabular diameter stated.

Pages 68–71 · View in original PDF