Key Messages
State of Play
– Electricity accounted for 12.5% of Ireland’s GHG emissions in 2023. Between 2018 and 2023, electricity emissions decreased by 26.2%, to a provisional ~7.6 MtCO2eq. in 2023.
– The 2023 figure represents a 22% decrease on the 2021 emissions which had risen to 9.89 MtCO2eq.25
Trajectory
The 2023–2050 EPA Projections Report indicates that while annual emissions are reducing for the first carbon budget period, mitigation will be insufficient, and the projected excess will be circa 1 MtCO2eq. for the period.
Trends
The 22% reduction in emissions in the electricity sector is due to an increase in the share of renewable electricity generation, from 38.6% to 40.7% from 2022 to 2023, with wind energy accounting for 33.7% of electricity supply (up from 33.1%), and an increase in net imports of electricity, rising from 1% in 2022 to 10% in 2023, resulting in a reduction in the use of coal-, oil-, and gas-fired plant for domestic generation.26
25Environmental Protection Agency (EPA), GHG Provisional Emissions Inventory 1990–2023, July 2024.
26For greater detail see, https://www.seai.ie/publications/Energy-Supply-and-Security-of-Supply-Part-A. pdf
Actions
The electricity sector has several policy documents setting out actions over 2025 and beyond:
– National Energy Demand Strategy;
– Future Framework for Offshore Renewable Energy;
– Energy Security Package;
– Accelerating Renewable Electricity Taskforce Implementation Plan;
– Offshore Wind Delivery Taskforce Key Actions.
Key Targets
– Carbon Budget 1 (2021–2025): 40 MtCO2eq.
– Carbon Budget 2 (2026–2030): 20 MtCO2eq.
| National Target | 2025 | 2030 |
|---|---|---|
| Renewable Electricity Share | 50% | 80% |
| Onshore Wind | 6 GW | 9 GW |
| Solar | Up to 5 GW | 8 GW |
| Offshore Wind | – | At least 5 GW |
| New Flexible Gas Plant | – | At least 2 GW |
| Demand Side Flexibility | 15–20% | 20–30% |
11.1 State of Play
The electricity sector has one of the smallest carbon budgets, with a ceiling of 40 MtCO2eq. for the first budget period (2021–2025), equating to an average of 8 MtCO2eq. per annum and the steepest decline trajectory (-75%) across all sectors. This represents an immense challenge as the sector not only has a requirement to reduce emissions, but also to meet the increasing electricity demand required for our economy, ensuring the energy security of the State, and supporting those sectors which are decarbonising through electrification.
There has been a steady decline in annual emissions from 9.89 MtCO2eq. in 2021 to 7.56 MtCO2eq. in 2023. While the EPA Projections Report 2023–2050 indicates an overshoot of over 1 MtCO2eq. in the period 2021 to 2025, and an overshoot of over 5 MtCO2eq. in the second period 2026 to 2030, these are both significant improvements on the projected overshoots (5.2 MtCO2eq. and 8.2 MtCO2eq., respectively) set out in the Climate Action Plan 2024.
A DECC led subgroup of the Accelerating Renewable Electricity Taskforce was established to examine ways to accelerate the decarbonisation of the sector for the second carbon budget period. The SEAI are also undertaking a Decarbonised Electricity System Study which may inform the development of the third and fourth carbon budget periods, as well as an evidence-based decarbonisation pathway for the electricity system to net zero.
11.1.1 Analysis of sectoral emissions
Considerable progress has been made in decarbonising the electricity sector, which resulted in the reduction in electricity generation emissions of 22% in 202327, against an increase in electricity demand (+3%). This reduction was due to an increase in both the use of indigenous renewable electricity generation sources (over 6 GW installed capacity by end- 2023) and electricity imports, allowing for a reduction in fossil-based domestic generation.
Ireland remains a world leader in both wind generation and the integration of nonsynchronous renewable electricity onto the grid. Wind energy accounted for 33.7% of electricity generation in Ireland in 2023, with a further 7% coming from other renewable sources, such as solar, hydro, and biomass.
Interconnection continues to increase in importance, helping us and our European partners balance electricity supply and demand between countries. Our interconnectivity is expanding, with the 500 MW Greenlink Interconnector to Great Britain due to come onstream in early 2025 and the 700 MW Celtic Interconnector to France in 2027.
27Environmental Protection Agency (EPA), GHG Provisional Emissions Inventory 1990–2023, July 2024.
11.2 Actions and Updates
11.2.1 Progress on actions
Accelerate Renewable Energy Generation
A renewables-led system is at the core of Ireland’s plan to radically reduce emissions in the electricity sector, protect our energy security, and ensure our economic competitiveness. This requires the accelerated and increased deployment of new renewable electricity generation capacity and related infrastructure.
Extending the life of and/or repowering existing renewable electricity projects offers an efficient use of established infrastructure and minimises the risk to the security of electricity supply at a time when increasing numbers of existing windfarms are reaching the end of their life. For onshore wind capacity, lifetime extensions and repowering at existing sites will be critical to ensuring that the 80% renewable electricity target is reached.
The Planning and Development Act, 2024, the Renewable Energy Directive and the revised NPF together will ensure greater alignment between national, regional, and local authority levels to deliver on the renewable electricity ambition.
The draft first revision of the NPF includes policy support for the development and upgrading of electricity grid infrastructure, the delivery of renewable electricity generation capacity, and the introduction of regional renewable electricity capacity allocations for each of the three Regional Assemblies by 2030. The table below shows each region’s existing energised capacity and additional minimum renewable electricity capacity allocations. The target capacity allocations are the minimum required for wind and solar generation to meet the 2030 emissions reductions in the electricity sector and further capacity may be required beyond 2030 to reach net zero by 2050.
In accordance with the relevant National Policy Objectives, Regional Assemblies and Local Authorities must plan for sufficient wind and solar energy development in order to achieve the targeted regional renewable electricity capacity allocations outlined in the draft National Planning Framework, taking into account factors influencing delivery including attrition rates and changes to energised capacity levels, in addition to current installed energised capacity.
Further to the commencement of Section 29 of the Planning and Development Act 2024, each Regional Assembly will be required to prepare a Regional Renewable Energy Strategy (RRES) as part of a wider review of the Regional Spatial and Economic Strategy, whereby additional detail can be outlined as to how the regional renewable electricity capacity allocations for the region can be best achieved in a coordinated and sustainable manner, including the identification of specific minimum targets for each of the constituent local authorities. These strategies will, in turn, inform City and County Development Plans.
The Final Revised NPF, due to be approved by Government and the Oireachtas in 2025, will be essential to ensuring that there is a sufficient pipeline of onshore wind and solar energy projects to meet the electricity carbon budget programme.
Table 4. Draft First Revision National Planning Framework Regional Renewable Electricity Capacity Allocations.
| Region | Energised capacity 2023 (MW) | Additional Renewable Power Capacity Allocations (MW) | Total % of national Share in 2030 | Energised capacity 2023 (MW) | Additional Renewable Power Capacity Allocations (MW) | Total % of national Share in 2030 |
|---|---|---|---|---|---|---|
| Onshore Wind MW | Solar PV MW | |||||
| Eastern and Midlands | 284 | 1,966 | 25% | 306 | 3,294 | 45% |
| Northern and Western | 1,761 | 1,389 | 35% | 0.3 | 959 | 12% |
| Southern | 2,622 | 978 | 40% | 138 | 3,302 | 43% |
| Total | 4,667 | 4,333 | 445 | 7,555 |
The results of the fourth onshore Renewable Electricity Support Scheme (RESS) auction were published in September 2024, with an additional 1,334 MW (more than a 20% increase on current installed capacity) of renewable generation capacity secured. In addition, the second phase of the Small-Scale Renewable Electricity Support Scheme was announced in May. This phase will support those small scale and community projects which are not suited to the competitive bidding process under RESS, with fixed export tariffs.
Work to accelerate the reinforcement of the electricity grid is ongoing, with EirGrid and ESB Networks delivering a significant number of infrastructure projects. The Commission for the Regulation of Utilities (CRU) published a new electricity grid connection policy in September, which includes the introduction of permit-granting deadlines and a second annual connection offer window, further supporting the connection of renewable projects to the grid. The CRU also published a decision on Hybrids-Installed Capacity Cap and it continued its work on hybrid connections by opening a public consultation on the sharing of maximum export capacity in January.
Guiding principles for the ongoing reform of Private Wires Policy was published in July, with a final Private Wires Policy Framework expected to be published before year-end.
Following the successful increase of the System Non-Synchronous Penetration cap from 70% to 75%, EirGrid has reduced the minimum number of large conventional fossil-fuel burning generators required for system stability from five to four, allowing for higher levels of renewable generation on the grid at any time and so reducing emissions.
For offshore wind, all six Phase One projects will have submitted planning applications by the end of 2024, with a combined capacity of over 4GW.
The Future Framework for Offshore Renewable Energy Policy Statement was published in May, which sets out the key actions to deliver a potential 20 GW of offshore wind capacity by 2040, and a potential 37 GW by 2050. The Future Framework is complemented by the Powering Prosperity – Ireland’s Offshore Wind Industrial Strategy, which aims to harness Ireland’s green industrial development potential in the offshore wind sector.
Throughout 2024, the CRU published important regulatory decisions relating to the development of Ireland’s offshore wind sector, related to grid pathways, charging methodologies, asset treatment, and the regulation of EirGrid for its new offshore activities.
The South Coast Designated Maritime Area Plan for Offshore Renewable Energy (SC- DMAP), a statutory spatial plan to guide development and investment in offshore renewables, was made operative by the Minister for the Environment, Climate and Communications on 24 October 2024, subsequent to the earlier approval by both Houses of the Oireachtas. The next Offshore RESS auction will be focused on a development area in the SC-DMAP.
Accelerate Flexibility
The Electricity Storage Policy Framework (ESPF), published in July, highlights the crucial role that electricity storage can play in accelerating the deployment of renewable electricity generation and ensuring grid stability, and includes ten Government actions to support storage.
An Offshore Transmission Strategy is in preparation and two interconnectors are currently under construction, with a further interconnector anticipated to be commissioned by 2030.
In exploring potential interconnection opportunities Ireland, Belgium, and the United Kingdom signed a Joint Statement on greater cooperation on renewables and interconnection opportunities between the three countries. Additionally, EirGrid and the French Transmission System Operator, RTE, are examining a second potential Ireland- France interconnector.
Demand Management
The CRU National Energy Demand Strategy (NEDS), published in July, is CRU’s plan to deliver the key regulatory measures necessary to allow all energy system users to benefit from a more flexible energy system, reducing the strain on the power system, and ensuring that we maximise our renewables potential. A review of the Large Energy Users Connection Policy is ongoing and will ensure that new Large Energy User grid connections do not contribute to energy security challenges and that the power system decarbonises new demand in line with climate targets. A final decision is expected in 2025.
Recommendations for an Enhanced Electricity Emissions Reporting Framework for Large Energy Users is due to be published in late 2024, while actions under Powering Prosperity and the NEDS will contribute to developing a plan-led, spatial approach to facilitate the colocation of future renewable electricity supply and large-scale energy demand.
The Smart Energy Services Working Group (SESWG) continues to provide strategic policy direction in line with the priorities of REPowerEU and the EU Action Plan for the Digitalisation of the Energy System, focussing on developing measures to empower citizens to play a central and active role in the energy transition. This includes the launch in 2024 of a Smart Energy Users Portal, for educating, encouraging, and empowering active consumers to engage in demand flexibility activities. The SESWG’s new implementation plan will be published by year end.
11.3 Identifying Actions in the Electricity Sector
The Offshore Wind Delivery Taskforce (OWDT) continues to oversee actions required to develop offshore wind generation in Ireland. The OWDT published its Annual Review 2023 and Key Actions for 2024 report in April, which sets out the key measures to be undertaken in the offshore wind sector.
The Accelerating Renewable Electricity Taskforce (ARET) was established to identify and prioritise the required policies to achieve our onshore renewable electricity targets. The ARET published its Implementation Plan in June, which sets out the roadmap for the actions to be taken in the near-term to help meet our 2030 targets.
In November 2023, Energy Security in Ireland to 2030, was published. This sets out the strategic approach to ensure a secure transition for Ireland’s energy systems, in line with our climate objectives, and sets out the energy security related actions to be taken out to 2030.
The CRU’s NEDS contains a suite of actions required to facilitate a more reliable, sustainable, and efficient energy system, in line with the carbon budgets, while minimising costs for customers.
The SESWG will launch a dedicated Smart Technology and Standards workstreams to develop and deliver smart flex standards for energy smart appliances, such as heat pumps, battery storage and EV chargers; in line with crucial consumer empowerment measures required under the EU Electricity Market Design changes.
The Future Framework for Offshore Renewable Energy, under the guiding principles of protecting the maritime environment and biodiversity; delivering affordable energy; ensuring an equitable return to communities; and alignment of policy and infrastructure, sets out the key actions to develop Ireland’s long-term, plan-led approach to offshore wind.
11.4 Actions for 2025 (actions in bold appear in the Annex)
| Action Number | Action |
|---|---|
| EL/25/1 | Manage the Renewable Electricity Support Scheme. |
| EL/25/2 | Publish Long Duration Energy Storage Procurement recommendations paper. |
| EL/25/3 | Develop a data sharing framework regarding Low Carbon Technologies connected to the electricity grid. |
| EL/25/4 | Develop Smart-flex standards roadmap. |
| EL/25/5 | Develop consumer-led flexible demand processes. |
| EL/25/6 | Establish an electricity decarbonisation pathway through the Decarbonised Electricity System Study. |
| EL/25/7 | Deliver a holistic onshore and offshore network plan blueprint (Net Zero Network Plan). |
| EL/25/8 | Assessment of potential actions to encourage and incentivise the uptake of domestic and commercial flexible demand technology. |
| EL/25/9 | Accelerate Renewable Electricity Taskforce to oversee delivery of actions contained in Implementation Plan. |
| EL/25/10 | Offshore Wind Delivery Taskforce to continue to implement the system-wide plan for the delivery of ORE. |
| EL/25/11 | Develop a framework of supporting policies for the repowering and extension of life of existing renewable electricity generation capacity. |
| EL/25/12 | Introduce the Scheduling and Dispatch Programme Go Live. |
| EL/25/13 | Increase the System Non-Synchronous Penetration limit to 80%. |
| EL/25/14 | Launch Low Carbon Inertia Services Phase 2 procurement. |
| EL/25/15 | Begin Future Arrangements for System Services Development. |