251211 CAP25 Q2 Q3 Progress Report DRAFT_cór v2
| Completed CAP23 Action - EL/23/2 | ||
|---|---|---|
| Publish the Renewable Electricity Spatial Policy Framework | ||
| The Renewable Electricity Spatial Policy Framework aims to translate renewable electricity objectives, as those outlined in Climate Action Plan 2023, to the regional level and allocate regional spatial and renewable generation capacity targets. This will then form the basis under which specific targets at local authority level can be established and subsequently planned for. These targets are key to achieving Ireland’s national renewable electricity targets and will fast-track the roll-out and delivery of grid-scale onshore wind and solar development. The Regional Renewable Electricity Capacity Allocations are to be incorporated into Regional Renewable Energy Strategies (forming part of the wider Regional Spatial and Economic Strategies), which will, in turn, inform City and County Development Plans and contribute to Ireland’s target of 80% renewables by 2030. Action EL/23/2 was due to be completed in 2023, however, publication of this Framework was delayed to ensure that these Regional Renewable Electricity targets could be merged with the revised National Planning Framework which was published in Q2. |

Figure from page 15
| Completed CAP24 Action - EL/24/9 | ||
|---|---|---|
| Develop a Private Wires Policy Framework | ||
| Under this action, a Private Wires Policy Framework was developed, which contributes to the acceleration of renewable energy generation by allowing generators to connect directly with users, enabling quicker connections, more clean energy on the ground, and less strain on the national grid. It will also facilitate the provision of low-cost charging solutions for electric vehicles and expand opportunities for self-supply of electricity. Approved by Government in July 2025, the policy framework was informed by a 2023 public consultation with a diverse group of citizens, industry associations, system operators and private energy developers. It outlines four circumstances in which a private wire can be built: • A direct connection between a generator, for example, a wind farm or solar farm, and an electricity customer, perhaps a factory that wants to decarbonise. There are situations where this is quicker and more efficient than having both parties connect to the Grid • A wind farm or solar farm owned by one company will be able to share a grid connection with another generator or a battery installation owned by another firm. Previously, this could have breached the rules prohibiting private lines; • Private lines will be allowed where they are the solution to allow on-street charging of Electric Vehicles; and • To allow a firm that self-supplies electricity to provide electricity to neighbouring customers where the line does not have to cross land owned by a third party. |

Figure from page 16