12.4 2025 and 2030 KPIs
12.4 2025 and 2030 KPIs
The KPIs are set out in Table 12.5.
Table 12.5 – Key Metrics to Deliver Abatement in Electricity71
| Theme | 2025 KPI | 2025 abatement (vs. 2018) MtCO eq. 2 | |
|---|---|---|---|
| Accelerate Renewable Energy Generation72 | 50% renewable electricity share of demand 6 GW onshore wind capacity Up to 5 GW solar PV capacity, including at least 1 GW of new non-utility solar | 2. 21 | |
| Accelerate Flexibility | Maximum level of renewables at any one time on the grid: 85% Dispatch down (excluding surplus generation) of renewables below 7% Minimise surplus generation Required long term storage (4 hour plus) in place | See above abatement figure | |
| Demand Management | Demand side flexibility 15-20% Zero carbon demand growth | 2.21 | |
| Total Estimated Abatement Potential |
71 For CAP24 new modelling was undertaken to underpin the Electricity chapter, the current abatement figures are based on the latest modelling 72 The abatement figures here represent the total figure for all three themes
| 2030 KPI | 2030 abatement (vs. 2018) MtCO 2 eq. | 2031-2035 measures | |
|---|---|---|---|
| 80% renewable electricity share of demand 9 GW onshore wind capacity At least 5 GW offshore wind capacity 8 GW solar PV capacity, including 2.5 GW of new non-utility solar Green hydrogen production from renewable electricity surplus generation | 7.18 | Decarbonisation Roadmap for a net-zero power system Green hydrogen production via 2 GW offshore wind | |
| Maximum level of renewables at any one time on the grid: 95-100% Dispatch down (excluding surplus generation) of renewables below 7% Minimise surplus generation Required additional long-term storage (4 hour plus) in place At least 2 GW of new flexible gas- fired generation Zero-emission gas-fired generation from biomethane and hydrogen commencing by 2030 | See above abatement figure | Required additional long duration storage technologies in place Increased zero emission gas-fired generation to enable a net zero power system | |
| Demand side flexibility 20-30% Zero carbon demand growth | 7.18 | Demand side flexibility 30% Zero carbon demand growth | |
12.4.1 Measures to Meet the Challenge
Achieving further emissions reductions between now and 2030 requires a major step up across three key measures:
Accelerate and increase the deployment of renewable energy to replace fossil fuels;
Deliver a flexible system to support renewables and demand;
Manage demand.
12.4.1.1 Accelerate Renewable Electricity Generation
To reach 80% of electricity demand from renewable sources by 2030:
Accelerate the delivery of utility-scale onshore wind, offshore wind, and solar projects through a competitive framework;
Develop non-utility scale generation and community projects through actions such as grant funding and enabling such projects to participate in energy markets and flexibility schemes;
Target 6 GW of onshore wind and up to 5 GW of solar by 2025;
Target 9 GW of onshore wind, 8 GW of solar, and at least 5 GW of offshore wind by 2030;
All new or repowered renewable electricity generation projects shall implement a Community Benefit Fund equivalent to the RESS requirements of €2/MWh;
Most fundamentally, significant investment is needed in the transmission and distribution systems to maximise the usage of renewable electricity and to reduce constraints and congestion on the system. System Operators and the CRU must ensure the timely investment in, and delivery of, the required electricity network infrastructure, including key priorities such as the North South Interconnector, to meet the targets set out in this, and subsequent, Climate Action Plans;
Deliver a streamlined electricity generation grid connection policy and process, and remove barriers, where possible, for the installation of renewables and flexible technologies reducing the need to build new grid, including hybrid (wind/solar/ storage) connections;
Publish a new Electricity Generation Grid Connection Policy;
Undertake a public consultation on proposed regional renewable electricity targets, including relevant environmental assessments in the upcoming draft National Planning Framework revision;
Provide for greater alignment between local plans and renewable energy targets at national (and regional) levels, taking into account regional targets once established and the revised National Planning Framework;
Publish the Draft Renewable Electricity Spatial Policy Framework White Paper;
Publish the revised methodology for Local Authorities Renewable Energy Strategies;
Publish Draft Revised Wind Energy Development Guidelines;
Following finalisation of a Regional Roadmap, Regional Assemblies will publish and implement Regional Renewable Electricity Strategies, enabling a unified methodology for national and regional spatial and capacity targets, identifying areas suitable for renewable electricity deployment at regional and county levels that can inform the statutory planning process;
Following adoption of the Regional Renewable Electricity Strategies, Local Authorities will include a statement within their next Local Authority Climate Action Plan which identifies the methods or processes that will be used to implement the required policy supports to achieve renewable electricity targets;
In line with transposing the revised Renewable Energy Directive, which entered into force in November 2023, ensure that the permit-granting procedure, the planning, construction and operation of renewable energy plants, the connection of such plants to the grid, the related grid itself, and storage assets are presumed as being in the overriding public interest;73
Map and designate Renewable Acceleration Areas for onshore renewables as required following transposition of the revised Renewable Energy Directive once the relevant provisions have been transposed into Irish law;
Ensure that Local Authorities, An Bord Pleanála, and the Maritime Area Regulatory Authority have sufficient and appropriate expertise and resources to meet the State’s needs in this area;
All relevant public bodies will carry out their functions in a manner which supports the achievement of the renewable electricity targets, including, but not limited to, the use of road and rail infrastructure to provide a route for grid infrastructure where this is the optimal solution;
Deliver the Small-scale Renewable Electricity Support Scheme to support nondomestic renewable electricity generators above 50 kW, and community energy and small and medium-sized enterprises’ projects up to 6 MW;
Target 1.6 GW of installed micro-generation capacity (≤ 50 kW) by 2030;
Production of 2 GW of renewable hydrogen sourced from offshore wind to be in development by 2030, which will help to provide greater certainty for investors, and create the production scales needed to enable greater infrastructure deployment;
Ensure priority EU electricity infrastructure projects, Projects of Common Interest (PCI) will continue to receive prioritisation as provided by the EU TEN-E Regulation, addressing any administrative, market, or regulatory obstacles obstructing the implementation of PCIs to ensure their scheduled execution.
73 The revised RED (RED III) sets an overall European renewable energy target of at least 42.5% by 2030. There will be an 18-month period to transpose most of the Directive’s provisions into national law, with a shorter deadline of July 2024 for some provisions related to permitting for renewables.
12.4.1.2 Deliver, Accelerate and Manage a Flexible System to Support Renewables
Accelerate Grid Flexibility
Empower business and households by developing clear public information regarding electricity carbon intensity in real time and promote opportunities to shift demand to times of low carbon intensity;
Delivery of 2 GW of new flexible gas-fired power generation;
Phase out and end the use of coal and peat in electricity generation;
System Operators to transform the flexibility of the electricity system through changes to policies, standards, services, and tools, funded and incentivised through regulatory price controls;
As an urgent priority, establish the investment framework and competitive market arrangements needed to deliver zero carbon system services;
Deliver at least three new electricity transmission grid connections or interconnectors;
Explore further interconnection potential, including hybrid interconnectors;
Publish the Electricity Storage Policy which will support the further deployment of electricity storage in Ireland, including longer term storage;
Increase deployment of medium to long-term storage technologies;
Undertake dispatch reform aimed at improving the efficiency of Transmission System Operators dispatch actions.
12.4.1.3 Manage Electricity Demand Growth
The overarching objective of managing electricity demand growth is to ensure, through a combination of energy efficiency and flexible electricity demand, that economic growth can be supported by low-carbon or no-carbon energy demand growth;
Ensure that 15-20% of the electricity system demand is flexible by 2025, increasing to 20-30% by 2030, to reduce the peak demand and shift the demand to times of high renewable output;
Deliver a demand side strategy that facilitates zero carbon demand, incentivises low carbon electricity consumption, and aligns with EU energy efficiency requirements, while facilitating electrification targets;
The demand side strategy should accelerate the rollout of local flexibility markets by the Distribution System Operator, as required to meet renewable electricity and carbon abatement targets, and contain measures to incentivise Large Energy Users to increase the flexibility in their electricity demand;
Publish a regulatory decision on dynamic green electricity tariffs;
Enable and encourage domestic customers, businesses, and communities to participate in demand flexibility services;
Enable and encourage customers to participate in wholesale and system services markets as a matter of urgency. Local balancing of flexible demand and renewable generation will contribute to an increase in renewable electricity usage and a reduction in carbon emissions.
Pages 163–169 · View in original PDF