5.5 Implied Capital Requirements to Deliver Emissions Ceilings and Pathways

Chapter 5 of CAP23 estimated that an additional ~€119 billion of capital investment would be required to deliver the measures identified. Of this, it was estimated that approximately ~€70 billion of capital investments (~60% of the total) would be redirected rather than incremental investments. Capital investment costs were evaluated based on a least cost pathway model that optimises total system cost.

Since the finalisation of CAP23, there has been some evidence of a potential increase in capital investment required (most significantly related to the CapEx required for renewable electricity generation capacity). The cost estimate is now ~€119-125 billion of capital investment needed.

Figure 5.3 – Estimated Investment Required to Mobilise Key Technologies

Increase since 2023

Wind & solar Electricity TSO/DSO upgrades 1 Backup capacity 123 7 9-13 34 7 11 9 3 2 3 8 2 1 1 1 1
EV passenger cars Transport EV trucks/vans EV buses 1 EV charging infrastructure 134
Insulation in homes (retrofitted) Buildings Heat pumps in homes residential District heating in homes Buildings Insulation in commercial buildings commercial DH and HP in commercial buildings Other211
9
3
3
8
Electrified heat supply in alumina Industry Heat pumps and electric boilers <

~119-125

Total

  1. Including interconnection | 2. Includes e.g. residential and commercial electric cooking

In addition, further investments will be required to deliver the unallocated emissions savings outlined in section 5.6. Investments will likely be concentrated in the deployment of key emerging technologies. Estimates of the exact investment required are to be brought forward in advance of addressing the unallocated emissions ahead of the second carbon budgetary period.

Pages 67–68 · View in original PDF