Chapter 4 | Recommendations

Figure from page 43

Figure from page 44
Introduction
Recommendations
This Chapter presents plausible choices for policymakers that, together, provide a route to achieving the Review’s Goals and Objectives. In doing so, this Chapter presents a set of recommendations and summarises the case for taking them forward to the next stage of development.
In this Chapter recommendations are presented by themes, which broadly align to the Review’s Goals and Objectives. Table 2 list the 32 recommendations that are presented in this Chapter and Figure 8 shows how a potential future railway would look in 2050 if all these recommendations were delivered.
Consistent with the introduction to this Report, the recommendations provided below do not represent official policy for either jurisdiction, but aim to provide a constructive, evidence-based approach for delivering the Goals and Objectives of this Review. Furthermore, this Report does not make firm recommendations about the timing for delivering options, although a plausible Roadmap is presented in Chapter 6. Ultimately, it will be for policymakers in both jurisdictions to decide which of the plausible options presented in this Chapter should be taken forward at any time.
The estimated capital, operating, and maintenance costs of the infrastructure interventions presented in this chapter are summarised in Chapter 5. These costs exclude recommendations relating to freight access charges and customer experience. Any option referenced in this chapter but not listed as a recommendation is not included in these cost estimates.
In total, the Review examined over 70 geographically specific options and assessed their feasibility, economic viability, and contribution to the Review’s Goals and Objectives. Around half of these options were progressed and are presented in this Chapter.
Appendix B provides details about the process the Review followed to develop its recommendations and explains why some options were not progressed. Further details about the options that were considered but ruled out are also provided in this Appendix.
As required under Annex I of the SEA Directive (2001/42/EC), mitigation measures and monitoring measures are proposed to address potential negative effects arising from the implementation of the Review. The Directive has been transposed into Irish law under Statutory Instrument No. 436 of 2004 (the Planning and Development (Strategic Environmental Assessment) Regulations 2004), as amended; and Northern Irish law under the Environmental Assessment of Plans and Programmes Regulations (Northern Ireland) 2004.
Statutory strategy alignment
The Review notes that the Greater Dublin Area (GDA) Transport Strategy has recently been adopted in accordance with Section 11 of the Dublin Transport Authority Act 2008. The Strategy sets out a statutory framework for the development of transport across the Dublin region up to 2042. The recommendations set out in this Chapter are intended, within the GDA, to represent potential additional complementary provision which could be considered for inclusion in future updates to the GDA Transport Strategy. It is acknowledged that this Strategy is the statutory plan for the development of transport within the GDA. It is intended that this Report will be an input for the next review of the GDA Transport Strategy within the next six years.
Mitigation and monitoring measures are proposed by the SEA Environmental Report under the following environmental topics:
•Population and Human Health;
•Biodiversity;
Strategic Environmental Assessment and Appropriate Assessment
•Land and Soils;
•Water;
•Air and Climate;
A Strategic Environmental Assessment (SEA) and Appropriate Assessment (AA) of the All-Island Strategic Rail Review have been carried out to ensure environmental considerations have been incorporated into the Review. Any new projects or plans arising from the implementation of this Review shall be subject to appropriate feasibility, options and environmental assessments where required.
•Archaeological, Architectural and Cultural Heritage;
•Landscape and Visual;
•Material Assets; and
•Noise. Mitigation and monitoring measures are also proposed by the Appropriate Assessment completed of the Review. All sets of measures shall be adhered to in full during the implementation of this Review.
All mitigation and monitoring measures are outlined in Appendix C of this Review, and in the SEA documents and Appropriate Assessment Report (Natura Impact Statement) which are published alongside this Review.
| Decarbonisation recommendations | ||
|---|---|---|
| 1. Develop and implement an All-Island Rail | ||
| Decarbonisation Strategy that includes an | ||
| electrified intercity network. | ||
| 2. Develop plans to invest in the skills, supply | ||
| chains, and rolling stock to deliver | ||
| decarbonisation. | ||
| 3. Procure hybrid and electric rolling stock in | ||
| the medium term. | ||
| Intercity recommendations | ||
| 4. Upgrade the cross-country rail network to a | ||
| dual-track railway (and four-track in places) | ||
| and increase service frequencies. | ||
| 5. Upgrade the core intercity railway network to | ||
| top speeds of 200km/h (125mph). | ||
| 6. Develop short sections of new railways on | ||
| congested corridors. | ||
| 7. Develop a cross-Dublin solution. | ||
| Regional and rural recommendations | ||
| 8. Provide more direct services between | ||
| Ireland’s West and South Coasts. | ||
| 9. Ensure regional and rural lines have at least | ||
| one train per two hours. | ||
| 10. Increase line speeds to at least 120km/h | ||
| (75mph). | ||
| 11. Upgrade Limerick Junction and the Limerick | ||
| Junction – Waterford line. | ||
| 12. Reinstate the Western Rail Corridor railway | ||
| between Claremorris and Athenry. | ||
| 13. Extend the railway into Tyrone, | ||
| Derry~Londonderry, and Donegal. | ||
| 14. Reinstate the South Wexford Railway. | ||
| 15. Develop the railway to boost connectivity in | ||
| the North Midlands. | ||
| 16. Integrate bus service and rail service | ||
| timetables to connect communities where | ||
| direct rail access proves to be unviable. |
| Sustainable cities recommendations | |||
|---|---|---|---|
| 17. Connect Dublin, Belfast International, and | |||
| Shannon Airport to the railway and improve | |||
| existing rail-airport connections. | |||
| 18. Extend double tracking in the Belfast area. | |||
| 19. Segregate long-distance/fast services from | |||
| stopping services. | |||
| 20. Explore the case for developing new stations | |||
| in the Belfast, Cork, Derry~Londonderry and | |||
| Limerick – Shannon city regions. | |||
| Freight recommendations | |||
| 21. Develop a sustainable solution for first-mile- | |||
| last-mile rail access for Dublin Port. | |||
| 22. Reduce Track Access Charges for freight. | |||
| 23. Strengthen rail connectivity to the island’s | |||
| busiest ports. | |||
| 24. Develop a network of inland terminals close | |||
| to major cities on the rail network. | |||
| Customer experience | |||
| recommendations | |||
| 25. Continue to invest in initiatives that deliver a | |||
| seamless customer journey. | |||
| 26. Continue to benchmark and monitor service | |||
| quality and deliver continuous improvement. | |||
| 27. Ensure future rolling stock specifications are | |||
| aligned to the infrastructure-led interventions | |||
| outlined in this Review. | |||
| 28. Invest in improving integration within rail and | |||
| between rail and other transport options. | |||
| 29. Deliver ‘clock-face’ timetable calling patterns. | |||
| 30. Develop cross-border structures to improve | |||
| the effectiveness of cross-border | |||
| infrastructure and rail service planning. | |||
| 31. Invest in a rolling programme of accessibility | |||
| improvements, including step-free access. | |||
| 32. Review and update the All-Island Strategic | |||
| Rail Review once a decade, taking account | |||
| of latest policies and developments. |

Figure from page 47
Table 2 List of the Review’s recommendations

Figure 8
Please note: This is an indicative artistic interpretation of the recommendations presented within this document. The pathways delineated on this illustration are conceptual in nature and should not be interpreted as a precise or literal depiction of potential routes or route corridors.
Figure 8 A potential future railway on the island of Ireland
Pages 43–48 · View in original PDF