Transport Infrastructure Ireland
FOI Requests — 766 records (page 12 of 16)
Download
- Received 26 February 2026Decided —PersonalTransport Infrastructure Ireland
Correspondence with the Land Development Agency since November 2025 regarding ccommodation for MetroLink workers.
- Received 21 June 2023Decided —Part-GrantedTransport Infrastructure Ireland
Complaints received since 2014 about the number '8' being upside-down on Junction 8 national road signage.
- Received 3 October 2025Decided —GrantedTransport Infrastructure Ireland
MetroLink market engagement.
- Received 30 July 2024Decided —Part-GrantedTransport Infrastructure Ireland
Records relating to the waiving of motorway tolls in advance of the 2024 All-Ireland hurling or football finals.
- Received 15 May 2025Decided —RefusedTransport Infrastructure Ireland
Correspondence between the South Kerry Coroner and the National Roads Authority.
- Received 27 October 2025Decided —RefusedTransport Infrastructure Ireland
Property Registration Authority records.
- Received 5 January 2026Decided —Part-GrantedTransport Infrastructure Ireland
Number and sample of representations received in 2025 regarding congestion on the M50.
- Received 7 November 2023Decided —Part-GrantedTransport Infrastructure Ireland
Records relating to gullies and drains on the M11 between Junctions 22 and 21.
- Received 28 February 2025Decided —GrantedTransport Infrastructure Ireland
Board presentation on 'TII’s 2024 Pavement Condition and Key Performance Indicators Report’.
- Received 28 July 2023Decided —GrantedTransport Infrastructure Ireland
Spreadsheet of 2022 active travel/greenway funding allocated to and drawn down by local authorities.
- Received 28 March 2025Decided —Part-GrantedTransport Infrastructure Ireland
Road safety at Junctions 12 and 13 on the M18 from 2018 to 2025.
- Received 30 January 2024Decided —GrantedTransport Infrastructure Ireland
A record relating to the protection of road and rail assets.
- Received 3 January 2025Decided —Part-GrantedTransport Infrastructure Ireland
Records referring to the costs involved in producing 2 MetroLink reports.
- Received 2 January 2024Decided —GrantedTransport Infrastructure Ireland
Records relating to a forestry application that was referred to TII.
- Received 6 June 2023Decided —Part-GrantedTransport Infrastructure Ireland
The agreement between TII and Hines to accommodate the potential development of a Metro Link station at 2 Grand Parade.
- Received 3 October 2025Decided —Part-GrantedTransport Infrastructure Ireland
Granting of planning permission/a railway order for the MetroLink project
- Received 4 March 2026Decided —RefusedTransport Infrastructure Ireland
Contracts awarded to Jacobs for the Luas Cross City and/or MetroLink projects in Dublin
- Received 22 January 2024Decided —Part-GrantedTransport Infrastructure Ireland
Records relating to a recent TII employee engagement survey.
- Received 13 November 2025Decided —Part-GrantedTransport Infrastructure Ireland
Communications and finances - Athlone to Galway Greenway.
- Received 10 November 2025Decided —RefusedTransport Infrastructure Ireland
Construction of the N20 at Blackpool, Cork in 1999.
- Received 16 July 2024Decided —Part-GrantedTransport Infrastructure Ireland
Correspondence between TII, the NTA and Cork City Council relating to the Cork light rail project.
- Received 13 September 2023Decided —GrantedTransport Infrastructure Ireland
Records of incidents logged on the M6/N6 between Junctions 8 and 15 in 2023.
- Received 12 November 2024Decided —Part-GrantedTransport Infrastructure Ireland
Records relating to the M20 between Junctions 2 and 3.
- Received 3 November 2025Decided —GrantedTransport Infrastructure Ireland
2025 correspondence with Deputy Conor D. McGuinness TD or Cllr. Kate O'Mahoney.
- Received 6 September 2023Decided —Part-GrantedTransport Infrastructure Ireland
Records in relation to a fatal accident on the Luas light rail system at Broombridge on the 18 September 2022.
- Received 29 December 2023Decided —GrantedTransport Infrastructure Ireland
Total income from motorway tolls in 2021, 2022 and 2023, with a breakdown by each toll.
- Received 28 March 2023Decided —Part-GrantedTransport Infrastructure Ireland
Records of Transdev's attempts to secure a parking space close to the Ranelagh Luas stop.
- Received 12 January 2024Decided —RefusedTransport Infrastructure Ireland
Records relating to Metrolink and the Loop.
- Received 3 February 2026Decided —Part-GrantedTransport Infrastructure Ireland
A proposed development of a reserve gas-fired power generator an energy storage system in Co. Galway.
- Received 9 June 2025Decided —RefusedTransport Infrastructure Ireland
Funding for a pedestrian or zebra crossing on the N24 at Carrick-on-Suir.
- Received 8 December 2023Decided —GrantedTransport Infrastructure Ireland
Records relating to the M1 PPP Scheme.
- Received 16 January 2025Decided —GrantedTransport Infrastructure Ireland
2024 toll revenue.
- Received 28 April 2025Decided —GrantedTransport Infrastructure Ireland
Repair works to the pedestrian side of Joe Williams Bridge, by the N7 Junction 1 / M50 Junction 9, since 19 September 2021.
- Received 22 April 2025Decided —Part-GrantedTransport Infrastructure Ireland
2024 N3 Bus Stop & Parking Survey.
- Received 11 December 2025Decided —RefusedTransport Infrastructure Ireland
Draft Options Selection Report for the Dundalk Bay to Carlingford Greenway Project.
- Received 20 September 2023Decided —Part-GrantedTransport Infrastructure Ireland
Copies of any Luas fare evasion survey conducted since 1 January 2022.
- Received 11 November 2024Decided —RefusedTransport Infrastructure Ireland
Correspondence between the Department of Transport and TII regarding 2024 funding for the N52 Tullamore to Kilbeggan Scheme.
- Received 2 July 2025Decided —GrantedTransport Infrastructure Ireland
2025 Irish motorway collisions.
- Received 23 June 2025Decided —RefusedTransport Infrastructure Ireland
Number of unpaid M50 toll fines from 2019 to 2025.
- Received 16 September 2024Decided —Part-GrantedTransport Infrastructure Ireland
2017-2023 MetroLink sound reports and related information.
- Received 19 May 2025Decided —RefusedTransport Infrastructure Ireland
Records prepared by TII for the Cabinet sub-committee on Transport.
- Received 12 December 2024Decided —RefusedTransport Infrastructure Ireland
Request for a copy of the Luas operating contract with Transdev.
- Received 10 September 2024Decided —Part-GrantedTransport Infrastructure Ireland
Noise and vibration reports relating to the Windy Arbour Luas stop and/or the Luas Green Line between the Milltown and Dundrum stops.
- Received 2 May 2023Decided —GrantedTransport Infrastructure Ireland
Records relating to and versions of TII's Climate Action Plan.
- Received 13 December 2023Decided —GrantedTransport Infrastructure Ireland
Information relating to the M1 PPP Contract.
- Received 7 April 2026Decided —Part-GrantedTransport Infrastructure Ireland
Cork to Kinsale Greenway Project funding allocations and expenditure since 2011.
- Received 24 January 2025Decided —GrantedTransport Infrastructure Ireland
Records relating to the operation of temporary speed restrictions on the Luas network.
- Received 20 August 2025Decided —GrantedTransport Infrastructure Ireland
2020 to 2024 funding for greenway projects.
- Received 27 February 2025Decided —GrantedTransport Infrastructure Ireland
2020 to 2024 toll revenue.
- Received 5 December 2024Decided —GrantedTransport Infrastructure Ireland
Records and information explaining current approaches to expanding Luas Red Line capacity.