Department of Transport
Public Body Actions — 186 records
Download
Use this data
In a spreadsheet
Paste into Google Sheets. 111 KB, within the size we keep spreadsheet files to.
=IMPORTDATA("https://publicinformation.ie/api/data/public-body-actions/bodies/department-of-transport.csv") Explore Public Body Actions
For: Anyone. Paste it into the AI assistant of your choice.
Show the prompt
You are helping me explore the "Public Body Actions" open dataset from publicinformation.ie. 1. Read https://publicinformation.ie/llms.txt, then the dataset page at https://publicinformation.ie/data/public-body-actions/. 2. Fetch the JSON Schema at https://publicinformation.ie/data/reference/schemas/public-body-actions.schema.json and the documentation at https://publicinformation.ie/data/reference/datasets/public-body-actions/. 3. Download the records from https://publicinformation.ie/api/data/public-body-actions.csv (or https://publicinformation.ie/api/data/public-body-actions.json). Print the header and the first 5 rows. 4. Summarise what the dataset contains, which fields identify a public body, and 3 questions it can answer. 5. Answer the question I ask next using only these files. Rules: - Read https://publicinformation.ie/llms.txt first. - Fetch the schema or column dictionary before writing code, and print the CSV header and the first 5 rows before any analysis. Never assume a column exists. - Cite every claim by URL: a record as https://publicinformation.ie/foi/<request_id>/, a figure as its row in the derived table. - Report the denominator, `suppressed_reason` and `flags` next to every rate. Ignore rows where `suppressed_reason` is set. - State the data's `as_of` date. - Use a pinned release (https://releases.publicinformation.ie/foi-disclosures/) for anything that will be published. - Do not invent columns, bodies or numbers. If something cannot be determined from the files, say so.
Reference
Actions due by quarter
| Year | Q1 | Q2 | Q3 | Q4 | Total |
|---|---|---|---|---|---|
| 2021 | – | – | – | 1 | 1 |
| 2022 | – | 1 | – | 41 | 42 |
| 2023 | – | – | – | 23 | 23 |
| 2024 | – | – | – | 7 | 7 |
| 2025 | – | – | – | 12 | 12 |
| 2026 | – | 4 | 5 | 7 | 16 |
| 2027 | 1 | 3 | – | 17 | 21 |
| 2028 | – | 2 | – | 10 | 12 |
| 2029 | – | – | – | 6 | 6 |
| 2030 | – | – | – | 37 | 37 |
Based on each action's original deadline. Year-only deadlines are counted in Q4.9with no fixed date are not shown in the grid.
- Complete as of 26 August 2026
Develop and publish an annual public transport passenger safety and personal security report, and implement measures where appropriate.
Action 1 Due 2022: Report developed. 2023: First report published and annual reports published thereafter. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Continue awareness campaigns with the aim of promoting inclusivity, courtesy and respect for all when travelling on public transport.
Action 2 Due Annual campaigns Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Continue to protect and renew rail infrastructure through the Infrastructure Manager Multi-Annual Contract (IMMAC).
Action 3 Due 2024: Existing IMMAC reviewed. 2025: IMMAC 2025-2030 agreed. Lead DoT Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Continue to protect and renew road infrastructure for all road users including sustainable mobility users.
Action 4 Due Ongoing Lead DoT, LAs, TII Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Expand speed management measures on National, Regional and Local roads using Periodic Speed Limits at schools, Vehicle Activated Signs and Average Speed Cameras in collaboration with An Garda Síochána at appropriate high-risk locations. (RSS action 8)
Action 5 Due Q4 2024 Lead DoT, NTA, TII Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Conduct a review of road traffic policy and legislation to prioritise the safety of walking and cycling. (RSS action 43)
Action 6 Due Q4 2023 Lead DoT Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Further develop camera-based enforcement by the Gardaí, including at junctions and for management of bus/ cycle lanes, building on existing and recent legislation through establishing suitable cross-agency administrative arrangements; and, where any legislative issues are identified, to consider and develop agreed proposals to remedy them. (RSS action 67)
Action 7 Due Q4 2022 Lead DoT Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Deliver fuelling/charging infrastructure to support operation of zero emission public bus fleet.
Action 8 Due 2025: Fuelling and charging infrastructure in place for public bus fleet. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Develop a strategy for the transition of commercial and PSO long distance bus services to low emission technologies.
Action 9 Due 2023: Strategy framework developed. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Develop a strategy to transition the Small Public Service Vehicle (SPSV) fleet to lower/zero emission technologies.
Action 10 Due 2024: Strategy developed and implementation commenced. Lead DoT Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Commence delivery of phase 1 of Cork Area Commuter Rail Programme.
Action 11 Due 2024: Kent Station platform completed. 2025: Midleton double-tracking completed. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Commence delivery of DART+ Programme. (Complements Climate Action Plan (CAP) action 246)
Action 12 Due 2022: DART+ West: Railway Order application submitted. DART+ South West: Railway Order application submitted. DART+ Coastal South: First round of public consultation completed. DART+ Coastal North: First and second rounds of public consultation completed. 2023: DART+ Coastal North: Railway Order application submitted. DART+ Coastal South: Second round of public consultation. DART+ Coastal South: Railway Order application submitted. Lead IÉ, NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Transition Dublin Metropolitan PSO bus services to low/zero emission bus fleet. (Complements CAP action 268)
Action 13 Due 2025: 50% of fleet transitioned to low/zero emission vehicles. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Transition Cork, Galway, Limerick and Waterford metropolitan area PSO bus services to low/zero emission bus fleet. (Complements CAP action 269)
Action 14 Due 2025: 40% of fleet transitioned to low/zero emission vehicles. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Transition town and Local Link bus services to low/zero emission bus fleet. (Complements CAP actions 270 and 271)
Action 15 Due 2022: First town transitioned to fully electric public bus service. 2025: Three additional towns transitioned to electrified bus services and 10% of Local Link services electrified. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Complete Strategic Rail Review to, inter alia, identify a pathway to appropriate decarbonisation of interurban rail services. (Complements CAP action 285)
Action 16 Due 2022: Review completed. Lead DoT Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Develop pedestrian enhancement plans for the five metropolitan areas.
Action 17 Due 2023: Plans developed. Lead LAs, NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Expand the operation of bike share schemes (including electric bikes) in cities.
Action 18 Due 2022: Bike share scheme operational in Waterford. 2024: New bike share contract in place inclusive of electrified bike sharing and further scheme expansions across the regional cities. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Deliver additional cycling infrastructure projects in the five cities. (Complements CAP action 233, RSS action 5)
Action 19 Due 2025: 400 km GDA Network completed or under construction. 200 km Regional Cities Network completed or under construction. Lead LAs, NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Expand rail fleet capacity.
Action 20 Due 2023: 41 additional carriages placed into passenger service. 2025 95 DART+ carriages delivered. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Continue appraisal and planning for new light rail in Dublin and Cork, and consider the feasibility of light rail in Galway.
Action 21 Due 2022: Emerging Preferred Route for Luas Cork identified. 2023: Planning application documentation completed for Luas Finglas. 2023: Assessment of light rail for Galway completed as part of review of Galway Transport Strategy. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Commence delivery of BusConnects network redesign in the five cities. (Complements CAP actions 239, 240)
Action 22 Due 2022: Network of Cork and Galway services finalised. 2023: Network of Limerick and Waterford services finalised. 2025: Dublin BCNR Phases 1-11 implemented (phased implementation on an annual basis). Cork BCNR fully implemented. Galway BCNR fully implemented. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Commence delivery of BusConnects Core Bus Corridor Infrastructure Works in the five cities. (Complements CAP actions 241, 242, 243, 244)
Action 23 Due 2022: Construction of Salmon Weir cycling and pedestrian bridge commenced as part of BusConnects Galway. Planning process for Cross City Link commenced as part of BusConnects Galway. 2023: Planning process for Dublin Road scheme commenced as part of BusConnects Galway. On-street construction of Radial Core Bus Corridor Schemes commenced as part of BusConnects Dublin. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Commence delivery of MetroLink. (Complements CAP action 247)
Action 24 Due 2022: Railway Order application submitted. 2025: MetroLink enabling works contracts commenced (subject to Government approval and planning consent). Lead TII Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Increase provision of park and ride/share at transport interchanges. (CAP action 260)
Action 25 Due 2022: Implementation of GDA Park and Ride Strategy commenced. Lead NTA, TII Plan Sustainable Mobility Policy Action Plan 2022-2025 - Modified as of 26 August 2026
Develop pedestrian enhancement plans for the regional growth centres and key towns.
Action 26 Due 2024: Plans developed. Lead LAs, NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Develop and implement an active travel infrastructure programme for regional growth centres and key towns outside of the Greater Dublin Area. (Complements CAP action 233, RSS action 5, 40)
Action 27 Due 2023: Urban cycle networks developed for all regional growth centres and key towns outside the GDA. 2025: 100 km constructed or under construction in regional growth centres and key towns outside the GDA. Lead NTA, TII Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Develop and publish cycle network plans for all counties. (Complements CAP action 231, RSS action 176)
Action 28 Due 2023: Plans published. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Develop and publish a strategic national cycle network. (Complements CAP action 232, RSS action 39)
Action 29 Due 2022: Network published. Lead TII Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Expand greenway network establishing linkages with towns and villages in line with the strategic national cycle network. (Complements CAP action 231)
Action 30 Due 2025: 350 km of greenway constructed or under construction. Lead TII, NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Modified as of 26 August 2026
Develop a model for bike share schemes (including the potential for electric bikes) in regional growth centres and key towns.
Action 31 Due 2023: Model developed. 2024: Pilots introduced. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Implement an enhanced rural transport system through delivery of Connecting Ireland. (Complements CAP action 245)
Action 32 Due 2022: Connecting Ireland programme commenced for bus, rail and alternative solutions. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Modified as of 26 August 2026
Identify the potential for integration of non-emergency health transport services with the Local Link services by conducting and monitoring a pilot project in Leitrim to deliver non- emergency health transport services.
Action 33 Due 2024: Pilot completed and implementation strategy developed. Lead DoH, DoT, HSE, NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Develop and implement a programme of improved town bus services.
Action 34 Due 2025: Improved town bus services implemented in Carlow, Ennis, Letterkenny, Mullingar, Portlaoise. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Develop and commence delivery of an enhanced bus stop and bus shelter programme for regional and rural services. (Complements RSS action 71, 72)
Action 35 Due 2022: Programme developed. 2025: 200 additional bus shelters installed for regional and rural services. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Increase provision of local area hackney services in conjunction with development of Connecting Ireland.
Action 36 Due 2022: Local Area Hackney Scheme reviewed and local area hackneys developed in line with Connecting Ireland programme for community cars. 2023: Revised subsidised Local Area Hackney Programme introduced based on findings of review. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Upgrade regional rail lines.
Action 37 Due 2022: Track renewal works completed on Ballybrophy to Limerick line. 2025: 50% of programme of upgrade (and elimination) to user worked level crossings on Ballybrophy to Limerick line. 25% of track improvement works on Limerick to Waterford line. 20% of programme of upgrade (and elimination) to user worked level crossings on Limerick to Waterford line. Lead IÉ Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Deliver public transport corridors providing prioritised bus lanes on national radial routes to the M50. (CAP action 261)
Action 38 Due 2025: Rollout of corridors commenced. Lead TII Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Establish a Demand Management Unit within the Department of Transport to develop an approach to traffic demand management taking account of the recommendations of the Five Cities Demand Management Study. (Complements CAP actions 250 and 258)
Action 39 Due 2022: Unit established. Lead DoT Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Develop demand management scheme for the Greater Dublin Area.
Action 40 Due 2023: GDA demand management scheme developed and published. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Develop and commence implementation of a programme for secure bicycle parking in key towns and cities plus transport hubs.
Action 41 Due 2023: Programme developed. 2025: 1,000 secure bicycle parking spaces implemented. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Expand Walking and Cycling Index to Cork, Galway, Limerick and Waterford to assess infrastructure; travel behaviour; the impact of walking and cycling; and new initiatives in each city.
Action 42 Due 2023: Survey expanded to regional cities. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Review impact of Pilot Bike and E-Bike Upcycling Initiative.
Action 43 Due 2023: Review published. Lead DRCD, DoT Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Expand Smarter Travel Workplaces and Campus Programmes to include: - Guidance for more types of companies and campus facilities. - Enhanced toolkit for workplace/campus assessment. - Support for in-work/in-business/ in-campus cycle use through subsidised cycle provision for trial periods. - Cycle Friendly Employer Certification. (Complements CAP action 249)
Action 44 Due 2023: Programmes expanded. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Conduct a study to assess incentives to encourage greater use of active travel as a mode of transport, including an assessment of international best practice.
Action 45 Due 2023: Study completed. Lead DoT Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Accelerate sustainable mobility plans for schools through: - Expansion of Cycle Right Training in primary and post-primary schools. - Rollout of Safe Routes to Schools Infrastructure Programme. - Complete review of the School Transport Scheme and identify measures to improve sustainability of school transport scheme. (CAP action 235)
Action 46 Due Annual: Additional 5,000 pupils per year trained under Cycle Right programme. 2022: Safe Routes to School Infrastructure Programme commenced in 170 schools. Measures to improve sustainability of School Transport system identified. Lead Cycling Ireland, DoE, NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Explore potential of road-user charging measures through the Better Road User Charging Evaluation (BRUCE) study. (CAP action 259)
Action 47 Due 2023: Draft implementation plan published. Lead TII Plan Sustainable Mobility Policy Action Plan 2022-2025 - Delayed as of 26 August 2026
Promote the principle of ‘Access for All’ across sustainable mobility services through: - Provision of customer service officers on all inter-city trains. - Enhancement of rail station accessibility including platform access, lift reliability, information provision and signage. - Enhancement of bus station accessibility including additional wheelchair accessible bus bays, information provision and signage. - Expansion of number of wheelchair accessible bus stops suitable for coach lifts. - Expansion of low floor coach fleet for ramp-based wheelchair access. - Enhancement of National Journey Planner to include additional accessibility information. - Provision of Changing Places toilets at key transport hubs, being major rail or bus stations.
Action 48 Due 2022: Customer service officers provided on all inter-city trains. 2025: Eight additional railway stations equipped with footbridge and lifts to allow all platform access. All bus stations equipped with wheelchair accessible bus bay. Wheelchair accessible stops for lift equipped coaches provided in additional 50 towns. 100 additional low floor vehicles for regional/ inter-city coach services introduced. Roll-out of new National Journey Planner commenced. Changing Places toilets installed at three additional transport hubs. Lead DoT, NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Expand the Travel Assistance Scheme beyond the GDA.
Action 49 Due 2023: Scheme expanded to Cork. 2025: Scheme expanded to Galway, Limerick and Waterford. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025 - Complete as of 26 August 2026
Expand the number of Wheelchair Accessible Vehicles in the SPSV fleet.
Action 50 Due 2025: WAVs expanded by 25%. Lead NTA Plan Sustainable Mobility Policy Action Plan 2022-2025